Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Finance | -36.37% | ₹8.5 L | L1 | Admitted-Finance |
| 2 | L2₹9.6 L+₹1.1 L (13.1%)Admitted-Finance | -28.01% | ₹9.6 L+₹1.1 L (13.1%) | L2 | Admitted-Finance |
| 3 | L3₹10.4 L+₹1.9 L (22.0%)Admitted-Finance | -22.40% | ₹10.4 L+₹1.9 L (22.0%) | L3 | Admitted-Finance |
Tender Value
₹13.4 L
EMD Value
₹26,780
Closing Date
29 May 2026, 4:00 pmClosed
Ex. Engineer, Div. No. 01 JMC Dogra Hall, Jammu
Ex. Engineer, Div. No. 01 JMC Dogra Hall, Jammu
Construction of shaft/ well for lift at Ram Mandir Purani Mandi Ward no.3 (Civil Part)
2026_HAUDD_310389_1
Division No. 1/JMC/26-27/e-NIT No. 14
Open Tender
Civil Works
Percentage
Ward No. 03.
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Ex. Engineer, Div. No. 01 JMC Dogra Hall, Jammu
₹26,780
22 Aug 2026
20 May 2026
30 May 2026
20 May 2026
29 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 29.4 | cum | 592.9 | ₹17,433.11 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.88 | cum | 5,202.9 | ₹4,578.55 |
| 3 | Providing and laying in position specified grade of RCC including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 1.47 | cum | 7,788.4 | ₹11,448.95 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 21.3 | cum | 9,395.7 | ₹2,00,128.41 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.53 | cum | 9,821.85 | ₹54,314.83 |
| 6 | Reinforcement of R.C.C work including straightening, cutting, bending, placing in position and binding all complete with Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,789 | kg | 123.2 | ₹4,66,804.8 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in:Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 21.84 | cum | 7,571.55 | ₹1,65,362.65 |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 21.84 | cum | 1,455.65 | ₹31,791.4 |
| 9 | Providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers: | 25 | kg | 67 | ₹1,675 |
| 10 | 12mm plaster in 1:6 mix on masonary walls. | 339.4 | sqm | 266.2 | ₹90,348.28 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1004140.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .