Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Finance AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | L1 | Admitted-Finance | |
| 2 | L2₹11.8 L+₹96,792.23 (8.92%)Admitted-Finance 18 309 LAL MANI DEVI MARG AGRAWAL NAGAR OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHAKSHI ENGINEERING CO. L1 | KIRAN CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Replacement/ Overhauling of Coal & Oil Burners including air nozzle & scanner guide assembly of all the four corners and setting of fire-ball angles | 1 | job | 94,324 ₹94,324 Lowest | 1,02,945 ₹1,02,945 |
| 2.00 | Complete overhauling of all the 52 nos. S.A. dampers in wind box at all the four corners | 1 | job | 8,015 ₹8,015 Lowest | 8,747 ₹8,747 |
| 3.00 | Fabrication and fitting of burner top/bottom casing at all the four corners | 1 | job | 2,004 ₹2,004 | 157 ₹157 Lowest |
| 4.00 | Overhauling of boiler fill pump | 1 | nos. | 1,213 ₹1,213 Lowest | 1,324 ₹1,324 |
| 5.00 | Overhauling of scanner fans and its dampers | 1 | nos. | 527 ₹527 Lowest | 576 ₹576 |
| 6.00 | Changing and repairing of railings of main boiler | 400 | RM | 14 ₹5,600 Lowest | 15 ₹6,000 |
| 7.00 | Checking and attending of spray nozzles of SH and RH spray (L and R) | 1 | job | 10,044 ₹10,044 Lowest | 10,962 ₹10,962 |
| 8.00 | Checking and rectification of box supports of down comers from 48m to 8m elev. | 1 | job | 30,584 ₹30,584 Lowest | 33,379 ₹33,379 |
| 9.00 | Complete Overhauling Boiler Drum internals | 1 | job | 30,584 ₹30,584 Lowest | 33,379 ₹33,379 |
| 10.00 | Repairing of man holes of Boiler | 20 | nos. | 101 ₹2,020 Lowest | 111 ₹2,220 |
Tender Value
₹11.7 L
EMD Value
₹23,300
Closing Date
21 Aug 2025, 5:00 pmClosed
SE OMMCII 2X200MWBTPS
SE OMMCII 2X200MWBTPS
Work of main boiler during overhauling of unit 13
2025_RVUNL_1046185_1
N-OBR////6000008383_00
Open Tender
Power/Energy Projects/Products
Fixed-rate
BTPS Obra Thermal Power Station
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Dy. CAO CFA BO BTPS obra
₹23,300
Yes
5 Sept 2025
10 Jun 2025
22 Aug 2025
10 Jun 2025
21 Aug 2025
10 Jun 2025
10 Jun 2025 - 21 Aug 2025
Amount
Replacement/ Overhauling of Coal & Oil Burners including air nozzle & scanner guide assembly of all the four corners and setting of fire-ball angles
Complete overhauling of all the 52 nos. S.A. dampers in wind box at all the four corners
Fabrication and fitting of burner top/bottom casing at all the four corners
Overhauling of boiler fill pump
Overhauling of scanner fans and its dampers
Changing and repairing of railings of main boiler
Checking and attending of spray nozzles of SH and RH spray (L and R)
Checking and rectification of box supports of down comers from 48m to 8m elev.
Complete Overhauling Boiler Drum internals
Repairing of man holes of Boiler
Replacement of packing of man holes
Repairing of Boiler Peep holes
Replacement of packing of boiler peep holes
Alignment and fixing of supports of hot air ducts
Rectification of hinge supports of wind box of boiler at 19m elev (L&R)
Hard Facing of Coal nozzle casting
Work of Repairing and Servicing of CBD (Continuous Blow Down) expander tank & safety valves with replacements of H.P./L.P. valves
Erection and fabrication of new structure and platforms behind APH and Economizer at Boiler 15m elev and Boiler 30m elev respectively
Painting of the above structure (s.no. 18)
Fitting of new grills by replacements
Strengthening of Structural Horizontal/ Vertical/ Inclined Beam by welding stiffeners at every 01 meter over whole beam on both sides and additional plates of the same thickness on both sides of all web and flanges
Correction of Sagged/ Bowed Beams by cutting and replacement of the same thickness
Cleaning, Shielding by Plate and Painting of Intersection of Inclined and Vertical Columns of Boiler Structure
Strengthening by welding of the above joint (s.no. 23) at Inclined and Vertical Columns of Boiler Structure
Complete repairing of hydraulic seal system
Replacement of high pressure steam/ feed line/ EBD/ CBD/ S.H.Spray Line/ R.H. spray line bends at different elevations
D.P. tests for dissimilar in Re-heater, stub joints, PSH stub etc. up to dia Size 127 mm
D.P. test of joints of critical pipes. (Main Steam/ CRH/ HRH Line/ Link lines)
Works of cleaning of boiler during its overhauling
Disposal of ash garbage/ waste refractory/ insulation from inside the Boiler and hot PA Duct to 3 km away from Power plant premises
Repairing/rectification of Flue gas/ SA/Hot PA Duct by replacement and Fitting of Guide Plate in Flue gas/ SA/Hot PA Duct with Plate Fabrication, plate size 5/6mm by double coat welding and ATT
Repairing/rectification of Flue gas/ SA/Hot PA Duct by double coat welding
KIRAN CONSTRUCTION COMPANY (BID ID -5283659)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .