Tender Value
₹24.1 L
EMD Value
₹48,140
Closing Date
10 Jun 2026, 11:30 am3d left
Chief Engineer, CEG
Room No. 222, CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Retrofitting works for Hall1, MDL, MSL, CWD and Central Store building at IGCAR, Kalpakkam.
2026_IGCAR_910842_1
CEG/IGC/2190/2026.
Open Tender
Construction Works
240 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹48,140
29 May 2026
29 May 2026
11 Jun 2026
30 May 2026
10 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork excavation by mechanical means (Hydraulic excavator) for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-Charge. | |||||
| 1.01 | All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | 60 | Cu.m. | - | - |
| 1.02 | All kinds of soil with depth exceeding 1.5m but not exceeding 3m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | 37.5 | Cu.m. | - | - |
| 1.03 | All kinds of soil with depth exceeding 3m but not exceeding 4.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | 12.5 | Cu.m. | - | - |
| 2 | Providing gravel/murram backing/filling 75mm thick or 100mm thick (consolidated thickness) as per Engineer-in-Charge requirement for underfloor/plinth beam or as specified by Engineer, including spreading gravel in uniform layers, watering, ramming, consolidating by hand/mechanical roller, dressing the top surface to the required level complete all as per specifications and as directed by the Engineer-in-Charge. | 100 | Cu.m. | - | - |
| 3 | Clearing light jungle area of all kinds of shrubs, bulb weeds, grass, small plants, branches including cutting all unwanted plants, branches, twigs, wild growth, thorny leaves etc. complete, and disposing the same as place specified by Engineer, transporting at contractors own cost complete all as directed by the Engineer-in-Charge. Note: The unwanted cut bulb weeds, wild grass, unwanted vegetation are to be periodically collected and transported to dumping yard. During execution period any damages shall be rectified to the original at contractor cost. The measurement for payment shall be taken prior to cut the jungle and as directed by the Engineer-in-Charge. The rate shall include the cost of labour, transportation, loading, and unloading at dumpyard or place as directed by Engineer-in-Charge. | 100 | Sq.m. | - | - |
| 4 | Providing and erecting system for dewatering and drainage of water as from site to main drain so as to retain the excavated formation dry for the duration required by the Engineer-in-Charge including cost of all equipment’s, consumables, site protection etc. all as per specification and as directed by the Engineer-in-Charge. | 835 | kWH | - | - |
| 5 | Dismantling Plain Cement concrete by manually / by mechanical means at all levels, carefully without damaging adjacent structures including disposal of debris with 50m lead, labour, tools required etc. complete in all respects as per specifications and directed by the Engineer-in-charge. | 1 | Cu.m. | - | - |
| 6 | Dismantling of RCC works at all levels by manually / by mechanical means, including Cutting and stacking of steel reinforcement bars and disposal of unserviceable materials within 50m lead as per specifications and directed by the Engineer-in-charge. | 1.5 | Cu.m. | - | - |
| 7 | Dismantling brick work in cement mortar at all levels by manually / by mechanical means, carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 50m lead all as per specifications and directed by the Engineer-in-charge. | 7 | Cu.m. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2190technicalbid.pdf
Tender Documents • 2.98 MB
2190FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
2190AMENT2.pdf
Tender Documents • 0.37 MB
BOQ_957275.xls
BOQ • 0.33 MB
2190Amt1.pdf
Tender Documents • 0.52 MB
2190Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
Download all tender documents and submit your bid