Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC NO 14 48 PILLAIYAR KOVIL STREET CHEYYUR TALUK PERUMBAKKAM CHENGALPATTU 603 302 | CHENGALPATTU | TAMIL NADU | 603302 | L1 | Accepted-AOC Qualified in the Technical Evaluation | |
| 2 | L2₹10.5 L+₹75,628.30 (7.20%)Accepted-AOC | L2 | Accepted-AOC Qualified in the Technical Evaluation |
Tender Value
₹9.5 L
EMD Value
₹10,000
Closing Date
20 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development officer VP
The Block Development officer VP
Rejuvanation of Vijayanthangal Eri at Sengattur panchayat in Lathur Panchayat Union.
2023_RDTN_343780_1
AS No. 784/2O23/A10, Date.24.06.2023
Open Tender
Civil Construction Goods
Item Wise
90 days
Panchayat union office Lathur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
Panchayat union office Lathur
28 Jul 2023
14 Jul 2023
20 Jul 2023
14 Jul 2023
20 Jul 2023
14 Jul 2023
14 Jul 2023
Amount
Name of the Work: Rejuvanation of Vijayanthangal Eri at Sengattur panchayat in Lathur Panchayat Union.
Desilting Eri
Clearing the Surub Jungle in Water Spread area with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Clearing the Light Jungle with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Earth work in all soils Expected hard rock Requring blastering and Conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching,formation ofbunds,breaking clods,sectioning etc.,compelete.
Extra watering and consolidation by power roller including hire charges (Baased on L.S & C.S Proposed Quantity for tank Bund)
Repairs to Surplus weir
Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B
Supply and filling of M Sand not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Revetment
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Supply and filling of M Sand not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Centering with shuttering for all cc works using MS sheet with cost and conveyance including all other labour charges etc complete
Rough stone dry packing for Aprons and revetment including cost and conveyance and all other labour charges etc complete.
Pointing in cm 1:3 mix including cost and conveyance and all other labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.SARANGAPANI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .