Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | -16.18% | ₹4.4 L | L1 | Admitted-Finance |
| 2 | L2₹4.5 L+₹15,788.86 (3.60%)Admitted-Finance | -13.16% | ₹4.5 L+₹15,788.86 (3.60%) | L2 | Admitted-Finance |
| 3 | L3₹5.0 L+₹57,247.70 (13.1%)Admitted-Finance | -5.23% | ₹5.0 L+₹57,247.70 (13.1%) | L3 | Admitted-Finance |
| 4 | L4₹5.0 L+₹64,514.76 (14.7%)Admitted-Finance | -3.84% | ₹5.0 L+₹64,514.76 (14.7%) | L4 | Admitted-Finance |
| 5 | L5₹5.2 L+₹81,872.05 (18.7%)Admitted-Finance | -0.52% | ₹5.2 L+₹81,872.05 (18.7%) | L5 | Admitted-Finance |
Tender Value
₹5.2 L
EMD Value
₹10,460
Closing Date
30 Mar 2026, 11:00 amClosed
EE PHED Div Bhadra
EE PHED Div Bhadra
Demolishing of RCC and Brick work for construction of RWS at Jogiwala HW
2026_PHCJA_546639_1
EE/PHED/BDR/2025-26/136/03
Open Tender
Civil Works - Water Works
Percentage
30 days
EE PHED Div Bhadra
As per Tender Documents
2 documents required · 2 mandatory
₹1,000
EE PHED Div Bhadra
₹10,460
Yes
1 Apr 2026
17 Mar 2026
30 Mar 2026
17 Mar 2026
30 Mar 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 280 | Cum | 930 | ₹2,60,400 |
| 1.02 | Demolishing brick work including stacking of serviceable material and disposal of unserviceable material within 50 m lead in cement mortar. | 420 | Cum | 538 | ₹2,25,960 |
| 1.03 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m ( stacks of cleaned bricks shall be measured ) from brick work in cement mortar. | 5,000 | Each | 1.85 | ₹9,250 |
| 1.04 | Taking out doors, windows and clearstory windows shutters (steel or wood) including stacking within 50 meters lead:Of area 3 square meter and below. | 8 | Each | 42 | ₹336 |
| 1.05 | Dismantling brick tiles covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | 56 | Sqm | 34 | ₹1,904 |
| 1.06 | Demolishing R.B. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 30 | Cum | 832 | ₹24,960 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TD03.pdf
Tender Documents • 1.09 MB
BOQ_974841.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .