| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹30.1 LAccepted-AOC | L-1 | Accepted-AOC Being lowest and reasonable | |
| 2 | L-2₹31.3 L+₹1.2 L (3.91%)Rejected-Finance | L-2 | Rejected-Finance Not being lowest bidder. | |
| 3 | L-3₹34.1 L+₹4.0 L (13.2%)Rejected-Finance 00 ITBAHRA GAUR KANIKAPUR ROAD KANIKAPUR BASTI UTTAR PRADESH 272163 | BASTI | UTTAR PRADESH | 272163 | L-3 | Rejected-Finance Not being lowest bidder. | |
| 4 | L-4₹34.2 L+₹4.0 L (13.3%)Rejected-Finance 252 GREEN CITY II BARNALA BYPASS ROAD BATHINDA BATHINDA PUNJAB 151001 | BATHINDA | PUNJAB | 151001 | L-4 | Rejected-Finance Not being lowest bidder. | |
| 5 | Rejected-Technical A 102 GOLDEN SAND APARTMENTS GAZIPUR DHAKOLI ZIRAKPUR PB 160104 | ZIRAKPUR | S A S NAGAR | PUNJAB | 160104 | - | Rejected-Technical Not admitted since No (Slow progress) remarks in HQ CE SWC WLR for Q/E Dec 23 Srl No 64 Page No 05. |
Tender Value
₹46.4 L
EMD Value
₹92,900
Closing Date
28 Mar 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE Bathinda
HQ CWE Bathinda Bathinda Mil Stn
SPL REPAIR TO ROADS UNDER GE(N) BATHINDA AT BATHINDA MIL STN
2024_MES_642920_1
CWE BTD/TOKEN-40/2023-24
Open Tender
Civil Works - Roads
Item Rate
180 days
Bathinda Mil Stn
As per NIT
7 documents required · 7 mandatory
₹500
GE (North) Bathinda
₹92,900
HQ CWE Bathinda
8 Jun 2024
17 Feb 2024
30 Mar 2024
17 Feb 2024
28 Mar 2024
14 Mar 2024
26 Feb 2024
Amount
Preparing black top surface by brushing with wire brush for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with air pressure and gunny bags through air jet using air compressor to remove all the loose dirt etc. including removing the mud etc. to a distance minimum 1.5 mtrs from edge of road complete all as specified and as directed by Engineer-in-charge.
Material and labour for applying evenly a tack coat of bituminous primer using paving bitumen (VG-10) @ 5 Kg per 10 sqm on road surface by sprayer operated hot pressure mechanism including supplying, laying, spreading 25 mm consolidated thickness of semi dense asphaltic concrete grading - 2, maximum aggregate size 9.5 mm, with job mix formula using paving bitumen (VG-30) @ 5.0% binder content by weight of total mix using mechanical paver for levelling within the specified tolerance as specified in SSR Part-I, rolled and consolidated to required camber and gradient with power roller for uniform smooth surface etc. complete all as specified and directed by Engineer-in-Charge. Note :- (i) The job mix formula shall be approved by GE. (ii) 5.0% binder content has been specified for quoting purpose of bid. If the quantity of the bitumen exceeds the 5.0% as mentioned above, no plus price adjustment shall be made. If the quantity of bitumen required as per job mix formula works out less than 5.0%, the recovery of the supply only bitumen shall be effected @ Rs. 50/- per Kg. The cost of transportation of material and testing charges shall be borne by the contractor. (iii) Contractor shall intimate the planned date of incorporation of mix in advance to GE. Premix will be approved in writing by Rep of Accepting Officer at plant site before incorporation of the same in the work
Material and labour for Repairs to potholes not exceeding 1.00 Sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths etc. cutting around edges to at least 25 mm in depth and applying tack coat @ 5 kg per 10 Sqm of paving bitumen (VG-10), putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 Sqm of paving bitumen (VG-30), blinded with 0.09 cum of stone chippings, 6.3 mm size and again well rammed, depth of pot holes exceeding 30mm complete all as specified and directed by Engineer-in-Charge.. Note as per MORTH Specification: (i) Loose material and standing water shall be brushed from the area to be repaired. (ii) Potholes shall be cut to vertical sides and deepened to reach sound material . (iii) Fill the patch with the granular mix in layers of about 75mm at a time. Each layer shall be compacted with hand rammers or with small vibratory compactors. The patch shall be compacted to the correct shape. (iv)100% quantity of Pot holes shall be marked and checked by Engineer-in-charge before commencement of work and shall also be entered in MB with reference to permanent objects before starting carpeting work. (v) Rate quoted by contractor shall deemed to be including of supply of premixed macadam binder and chippings
Supplying, laying and spreading upto 75mm thick or less ( consolidated thickness) premix bituminous macadam (BM) filling in depression grade - 2 (using 19.2 mm graded stone aggregate) in single layer with using mechanical paver using paving bitumen (VG-30) @ 3.4 % by weight of total mix with job mix formula, laid / rolled and compacted/ consolidated to required camber and gradient with 8 to 10 tonne power roller to a uniform smooth surface etc. complete all as specified and directed by Engineer-in-Charge. Note :- (i) The job mix formula shall be approved by GE. (ii) 3.4% binder content has been specified for quoting purpose of bid. If the quantity of the bitumen exceeds the 3.4% as mentioned above, no plus price adjustment shall be made. If the quantity of bitumen required as per job mix formula works out less than 3.4%, the recovery of the supply only bitumen shall be effected @ Rs. 50/- per Kg. The cost of transportation of material and testing charges shall be borne by the contractor. (iii) Contractor shall intimate the planned date of incorporation of mix in advance to GE. Premix will be approved in writing by Rep of Accepting Officer at plant site before incorporation of the same in the work
Material & Labour for painting lines, dashes, arrows, letters, marking etc of thermoplastic paint applied Min 6 Kgs /Sqm on new road surfaces with hot applied reflective thermoplastic road marking paint (White / Golden yellow) conforming to MORT&H (clause 803.4) all as specified with 8% Type 1 glass beads using special applicator machine with heating arrangement upto 160˚ C including cleaning and drying the existing road surfaces to ensure dust, oil, grease and moisture free surfaces before applying the paint complete all as specified and as directed by Engineer-in-charge. Note: Thermoplastic paint should be applied Minimum 6Kg/Sqm
Removal of existing marking paint and Material & Labour for painting lines, dashes, arrows, letters, marking etc of thermoplastic paint applied Min 6 Kgs /Sqm with hot applied reflective thermoplastic road marking paint (White / Golden yellow) conforming to MORT&H (clause 803.4) all as specified with 8% Type 1 glass beads using special applicator machine with heating arrangement upto 160˚ C including cleaning and drying the existing road surfaces to ensure dust, oil, grease and moisture free surfaces before applying the paint complete all as specified and as directed by Engineer-in-charge. Note: Thermoplastic paint should be applied Minimum 6Kg/Sqm
Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and not exceeding 50 mm deep complete all as specified and directed by Engineer-in-charge.
Supply and fixing in repair two way (dual direction) reflective road cat eye of plastic body as approved by GE of approx dimensions 100mm x 110mm x 20 mm with red / amber / white reflective panels and fixing the same on road surface by applying approximately 100 gm Epoxy mixture and placing the cat eye without applying excessive pressure and additional fixed with 12 mm dia and 120 mm long zinc plated steel nail at the centre of cat eye complete all as specified and directed by Engineer-in-Charge.
Supply and fixing in repair solar road stud having 3 LED as approved by GE of colour Red/Yellow to a side (total 6 Nos) housed in a tough pressure die casted aluminium alloy of size 125mm x 125mm or 120mm x 130mm with built in stem of suitable length for fixing with epoxy, LEDs solar cells battery & light sensor well protected inside under tough unbreakable polycarbonate transparent sheet top system, workable for 2-3 days (night) after full charge in 8 to 10 Hrs. complete all as specified and as directed by Engineer -in-charge.
Supply & Fixing in repair Dual direction delineator 600 mm long made of 16 gauge MS rectangular pipe of size 25mm x 68mm, pipe stove enamelled and baked to 120 degree celcius or powder coated, head made of ABS plastic rectangular moulded with flat face provided with high intensity prismatic reflector of colour (white/yellow/red) of size 100mm x 125mm with additional 2 reflective strips of 25mm wide, shade as approved by GE and fixing in cement concrete (1:2:4) type B1 using 20mm graded stone aggregates with size of block 300mm x 300mm x 350mm deep including excavation and earth work in any strata complete all as specified and as directed by Engineer-in-charge.Note: The rate of cement concrete (1:2:4) type B1 using 20mm graded stone aggregates with size of block 300mm x 300mm x 350mm and excavation and earth work in any strata is included in this item and nothing shall be paid extra on this account.
Demolition Stone slabs and tiles of any description or thickness in floors, aprons etc Laid dry or bedded and pointed in any mortar complete all as specified and as directed by Engineer-in-Charge.
Material and labour for 100mm thick Cement concrete 1:4:8, Type D-2 using 40 mm graded stone aggregate as in sub base of floors complete all as specified and as directed by Engineer-in-charge.
Material and labour for Sand filling under interlocking tiles including consolidation complete all as specified and as directed by the Engineer-in-Charge.Note: Sand shall be approved by GE before incorporation in the work.
Material and labour for Machine pressed precast concrete interlocking paver block any shape and size confirming to IS 15658-2006 of 80 mm thickness M-40 Grade colour and pattern as approved by GE with grey cement and pigment complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for Cement concrete 1:3:6, type C-1 using 20 mm graded stone aggregate as in coping , packing around interlocking paver block complete all as specified and as directed by Engineer-in-charge.
Material and labour for Providing precast cement concrete 1:2:4 Type B-1 using 20mm graded aggregates in Kerb stone,quoin blocks , apex stones set in cement mortar 1:4 , weathering slightly rounded or chamfered angles and throating inlcuding necessary form work complete all as specified and as directed by Engineer-in-charge.
Material and labour preparation of new or previously treated / untreated concrete surfaces over 10 cm in width or girth, not otherwise described with two coats of synthetic enamel paint over a priming coat of alkali resistant priming paint complete all as specifed and directed by Engineer-in-charge.
Note:- The contract sum shall be calculated by deducting the amount shown in Credit Schedule attached to this tender from total amount of Schedule 'A'/BOQ
FAIR DEAL CONSTRUCTION CO
M K Enterprises
M/s Azure Infrastructure Construction Co.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .