Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹10.2 L+₹21,091.02 (2.11%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹10.3 L+₹29,141.03 (2.91%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹11.1 L+₹1.0 L (10.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical CDR Try Challan Affdavit uploaded for other eorks |
Tender Value
₹16.1 L
EMD Value
₹32,200
Closing Date
27 Jul 2026, 6:00 pmClosed
Er. Sanjeev Sharma
XEN PWD Akhnoor
BOQ
2026_PWDJK_314740_6
e-NIT No. 31 of 2026-27 Dated 06-07-2026
Open Tender
Civil Works
Percentage
30 days
Akhnoor
NIT
2 documents required · 2 mandatory
₹600
XEN PWd Akhnoor
₹32,200
4 Aug 2026
7 Jul 2026
28 Jul 2026
7 Jul 2026
27 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 109.5 | cum | 187.3 | ₹20,509.35 |
| 2 | P/laying in position cement concrete of specified grade in 1:4:8 in graded stone aggregate,crushed and upto 40 mm nominal size,excluding c/o centering and shuttering all works upto plinth level including all lifts and leads | 6.47 | CUM | 5,202.9 | ₹33,683.57 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 7.9 | CUM | 5,733.6 | ₹45,281.11 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 27.3 | Sqm | 286.35 | ₹7,817.36 |
| 5 | Centering and shuttering including strutting, propping etc and removal of form work for suspended floors,roofs,landings,balconies, and access plateform for all heights/ level including all lifts,leads and carriages. | 16 | SQM | 718.2 | ₹11,491.2 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:Columns, pillars, piers, abutments, posts and struts. | 12.6 | Sqm | 742.55 | ₹9,356.13 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 102 | Sqm | 628.95 | ₹64,152.9 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:beams etc | 11.77 | sqm | 577.55 | ₹6,794.88 |
| 9 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 2.76 | SQM | 416.5 | ₹1,149.54 |
| 10 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 19.32 | Cum | 7,571.55 | ₹1,46,282.35 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_1019389.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .