Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L | L1 | Accepted-AOC Ok |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Technically not qualified |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Not qualified |
| Sl No | Description | Qty | Unit | Elumalai Sivakumar L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on banks with initial lead and lift in gravelly soil stiff clay, hard stiff clay, murram, boulders mixed with gravel as per SS 20-B for foundation.Including Cost of all labour charges etc., complete Complying with Standard Specification | 220.5 | m3 | 185 ₹40,792.5 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications. | 16 | m3 | 5,309 ₹84,944 Lowest |
| 3.00 | Steel Centering For the Soffits Of PCC Works For the following items including cost of all Materials , Labour Strutting removing etc. as directed by Departmental Officers.Including Cost of all labour charges etc., complete Complying with Standard Specification | 756 | m2 | 494 ₹3,73,464 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 86.94 | m3 | 6,755 ₹5,87,279.7 Lowest |
| 5.00 | Finishing Of Flooring With Granolithic Flooring With Cement Concrete 1:2:4 Using 10 to 12mm Stone Chi- 25 mm tk etc., Including Cost Of All Materials And Labour Charges etc. Complete | 69.75 | m2 | 164 ₹11,439 Lowest |
Tender Value
₹13.1 L
EMD Value
₹13,100
Closing Date
3 Jan 2025, 3:00 pmClosed
The Executive Officer, Kalambur Town Panchayat
19/3, Sandhavasal road, Kalambur Town Panchayat Office
Construction of Strom Water Drain at Mahatma gandhi street, Kodikatha kumaran street in Kalambur Town panchayat
2024_DTP_514999_1
348/2024
Open Tender
Civil Works
Works
180 days
O/o Kalambur Town Panchayat
II and above
2 documents required · 2 mandatory
₹0
₹13,100
Yes
Kalambur Town panchayat
27 Apr 2026
28 Dec 2024
3 Jan 2025
28 Dec 2024
3 Jan 2025
28 Dec 2024
28 Dec 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_612571.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tender.pdf
Tender Documents • 0.09 MB
BOQ_612571.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .