TENDER FOR CARRYING OUT HOT REPAIR OF LPG CYLINDERS FOR LPG PLANTS UNDER
22000813-HD-10157
22000813-HD-10157
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
27 Feb 2023
7 Feb 2023
27 Feb 2023
27 Feb 2023
7 Feb 2023 - 10 Feb 2023
14 Feb 2023
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | HOT REPAIR OF 2 KG | HOT REPAIR OF 2 KG — HOT REPAIR OF 2 KG CYLINDER: HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALISING, CIRCUMFERENTIAL WELD REPAIR, HYDRO TESTING AND PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, CYLINDER RECONDITIONING CONFIRMING TO IS 13258-1991. THE TOTAL SCOPE OF WORKS INVOLVED IS STENCILING OF "MESSAGE FOR DOMESTIC USE ONLY" TO BE ADDED TO EXISTING MESSAGES LIKE "SWITCH OFF REGULATOR WHEN NOT IS USE" DETAILED IN ANNEXURE. THIS INCLUDES SUPPLY OF NEW FOOT RING AND MARKINGS AS PER SPECIFICATION GIVEN IN THE ATTACHMENT FOR LPG CYLINDERS. RATES SHOULD BE QUOTED BY CONSIDERING THE SCRAP VALUE OF FOOT RING. THIS INCLUDES CUTTING OF EXISTING FOOT RING AND WELDING OF NEW FOOT RING ON LPG CYLINDERS IN SUCH A MANNER SO THAT CYLINDERS CANNOT BE DAMAGED DUE TO POOR WORKMANSHIP. THIS INCLUDES SUPPLY OF NEW VP RING AND STAY PLATES. PUNCHING OF MARKINGS AS PER SPECIFICATION GIVEN IN THE ATTACHMENT FOR LPG CYLINDERS. RATES SHOULD BE QUOTED BY CONSIDERING THE SCRAP VALUE OF VP RING. THIS INCLUDES CUTTING OF EXISTING VP RING AND STAY PLATES AND WELDING OF NEW VP RING AND STAY PLATE ON CYLINDERS IN SUCH A MANNER SO THAT CYLINDERS CANNOT BE DAMAGED DUE TO POOR WORKMANSHIP. GORAKHPUR 5KG Manadatory: No | - | Each |
| 1 | HOT REPAIR OF 5 KG | HOT REPAIR OF 5 KG — HOT REPAIR OF 5 KG CYLINDER: HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALISING, CIRCUMFERENTIAL WELD REPAIR, HYDRO TESTING AND PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, CYLINDER RECONDITIONING CONFIRMING TO IS 13258-1991. THE TOTAL SCOPE OF WORKS INVOLVED IS STENCILING OF "MESSAGE FOR DOMESTIC USE ONLY" TO BE ADDED TO EXISTING MESSAGES LIKE" SWITCH OFF REGULATOR WHEN NOT IS USE" DETAILED IN ANNEXURE. THIS INCLUDES SUPPLY OF NEW FOOT RING AND MARKINGS AS PER SPECIFICATION GIVEN IN THE ATTACHMENT FOR LPG CYLINDERS. RATES SHOULD BE QUOTED BY CONSIDERING THE SCRAP VALUE OF FOOT RING. THIS INCLUDES CUTTING OF EXISTING FOOT RING AND WELDING OF NEW FOOT RING ON LPG CYLINDERS IN SUCH A MANNER SO THAT CYLINDERS CANNOT BE DAMAGED DUE TO POOR WORKMANSHIP. THIS INCLUDES SUPPLY OF NEW VP RING AND STAY PLATES. PUNCHING OF MARKINGS AS PER SPECIFICATION GIVEN IN THE ATTACHMENT FOR LPG CYLINDERS. RATES SHOULD BE QUOTED BY CONSIDERING THE SCRAP VALUE OF VP RING. THIS INCLUDES CUTTING OF EXISTING VP RING AND STAY PLATES AND WELDING OF NEW VP RING AND STAY PLATE ON CYLINDERS IN SUCH A MANNER SO THAT CYLINDERS CANNOT BE DAMAGED DUE TO POOR WORKMANSHIP. GORAKHPUR 14KG Manadatory: No | - | Each |
| 1 | HOT REPAIR-14.2KG | HOT REPAIR-14.2KG — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. GORAKHPUR 19KG Manadatory: No | - | Each |
| 1 | HOT REPAIR- 19 KG | HOT REPAIR- 19 KG — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. GORAKHPUR 47KG Manadatory: No | - | Each |
| 1 | HOT REPAIR OF 47.5 | HOT REPAIR OF 47.5 — VISUAL INSPECTION AS PER IS-13258:1991 (LATEST), DEGASSING OF CYLINDERS BY FILLING WITH WATER, DE-DENTING OF CYLINDERS, REPLACEMENT OF FOOT RING AND VP RING, HEAT TREATMENT, HYDROSTATIC TESTING, SHOT BLASTING, METALLIZING, PAINTING, STENCILING, FIXING OF VALVE, PNEUMATIC TESTING ETC. COMPLETE HOT REPAIR OF CYLINDERS INCLUDING LOADING/UNLOADING AND TO AND FRO TRANSPORTATION CHARGES BETWEEN PLANT AND REPAIRERS UNIT. JOB INCLUDES CUTTING AND REMOVING FOOT RING AND VP RINGS, AND WELDING NEW FOOT RING AND VP RING, AS PER SPECIFICATION. THE RATE TO EXCLUDE SUPPLY OF CONSUMABLES VIZ., WELDING ELECTRODES , ZINC WIRE FOR METALIZING, PRIMER, PAINT (FOR CYLINDER AND STENCILING) AND TEFLON TAPE FOR VALVE FIXING. UNNAO 2KG Manadatory: No | - | Each |
| 1 | HOT REPAIR OF 2 KG UNAO | HOT REPAIR OF 2 KG UNAO — HOT REPAIR OF 2 KG CYLINDER: HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALISING, CIRCUMFERENTIAL WELD REPAIR, HYDRO TESTING AND PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, CYLINDER RECONDITIONING CONFIRMING TO IS 13258-1991. THE TOTAL SCOPE OF WORKS INVOLVED IS STENCILING OF "MESSAGE FOR DOMESTIC USE ONLY" TO BE ADDED TO EXISTING MESSAGES LIKE "SWITCH OFF REGULATOR WHEN NOT IS USE" DETAILED IN ANNEXURE. THIS INCLUDES SUPPLY OF NEW FOOT RING AND MARKINGS AS PER SPECIFICATION GIVEN IN THE ATTACHMENT FOR LPG CYLINDERS. RATES SHOULD BE QUOTED BY CONSIDERING THE SCRAP VALUE OF FOOT RING. THIS INCLUDES CUTTING OF EXISTING FOOT RING AND WELDING OF NEW FOOT RING ON LPG CYLINDERS IN SUCH A MANNER SO THAT CYLINDERS CANNOT BE DAMAGED DUE TO POOR WORKMANSHIP. THIS INCLUDES SUPPLY OF NEW VP RING AND STAY PLATES. PUNCHING OF MARKINGS AS PER SPECIFICATION GIVEN IN THE ATTACHMENT FOR LPG CYLINDERS. RATES SHOULD BE QUOTED BY CONSIDERING THE SCRAP VALUE OF VP RING. THIS INCLUDES CUTTING OF EXISTING VP RING AND STAY PLATES AND WELDING OF NEW VP RING AND STAY PLATE ON CYLINDERS IN SUCH A MANNER SO THAT CYLINDERS CANNOT BE DAMAGED DUE TO POOR WORKMANSHIP. UNNAO 5KG Manadatory: No | - | Each |
| 1 | HOT REPAIR OF 5 KG UNNAO | HOT REPAIR OF 5 KG UNNAO — HOT REPAIR OF 5 KG CYLINDER: HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALISING, CIRCUMFERENTIAL WELD REPAIR, HYDRO TESTING AND PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, CYLINDER RECONDITIONING CONFIRMING TO IS 13258-1991. THE TOTAL SCOPE OF WORKS INVOLVED IS STENCILING OF "MESSAGE FOR DOMESTIC USE ONLY" TO BE ADDED TO EXISTING MESSAGES LIKE" SWITCH OFF REGULATOR WHEN NOT IS USE" DETAILED IN ANNEXURE. THIS INCLUDES SUPPLY OF NEW FOOT RING AND MARKINGS AS PER SPECIFICATION GIVEN IN THE ATTACHMENT FOR LPG CYLINDERS. RATES SHOULD BE QUOTED BY CONSIDERING THE SCRAP VALUE OF FOOT RING. THIS INCLUDES CUTTING OF EXISTING FOOT RING AND WELDING OF NEW FOOT RING ON LPG CYLINDERS IN SUCH A MANNER SO THAT CYLINDERS CANNOT BE DAMAGED DUE TO POOR WORKMANSHIP. THIS INCLUDES SUPPLY OF NEW VP RING AND STAY PLATES. PUNCHING OF MARKINGS AS PER SPECIFICATION GIVEN IN THE ATTACHMENT FOR LPG CYLINDERS. RATES SHOULD BE QUOTED BY CONSIDERING THE SCRAP VALUE OF VP RING. THIS INCLUDES CUTTING OF EXISTING VP RING AND STAY PLATES AND WELDING OF NEW VP RING AND STAY PLATE ON CYLINDERS IN SUCH A MANNER SO THAT CYLINDERS CANNOT BE DAMAGED DUE TO POOR WORKMANSHIP. UNNAO 14KG Manadatory: No | - | Each |
| 1 | HOT REPAIR-14.2KG UNNAO | HOT REPAIR-14.2KG UNNAO — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. UNNAO 19KG Manadatory: No | - | Each |
| 1 | HOT REPAIR- 19 KG UNNAO | HOT REPAIR- 19 KG UNNAO — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. UNNAO 47KG Manadatory: No | - | Each |
| 1 | HOT REPAIR OF 47.5 UNNAO | HOT REPAIR OF 47.5 UNNAO — VISUAL INSPECTION AS PER IS-13258:1991 (LATEST), DEGASSING OF CYLINDERS BY FILLING WITH WATER, DE-DENTING OF CYLINDERS, REPLACEMENT OF FOOT RING AND VP RING, HEAT TREATMENT, HYDROSTATIC TESTING, SHOT BLASTING, METALLIZING, PAINTING, STENCILING, FIXING OF VALVE, PNEUMATIC TESTING ETC. COMPLETE HOT REPAIR OF CYLINDERS INCLUDING LOADING/UNLOADING AND TO AND FRO TRANSPORTATION CHARGES BETWEEN PLANT AND REPAIRERS UNIT. JOB INCLUDES CUTTING AND REMOVING FOOT RING AND VP RINGS, AND WELDING NEW FOOT RING AND VP RING, AS PER SPECIFICATION. THE RATE TO EXCLUDE SUPPLY OF CONSUMABLES VIZ., WELDING ELECTRODES , ZINC WIRE FOR METALIZING, PRIMER, PAINT (FOR CYLINDER AND STENCILING) AND TEFLON TAPE FOR VALVE FIXING. PATNA 2KG Manadatory: No | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22000813-HD-10157.pdf
TENDER_DOCUMENT • 16.52 MB
Download all tender documents and submit your bid