Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | -35.10% | ₹2.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.4 L+₹7,537.60 (3.24%)Admitted-Fee/PreQual/Technical/Finance | -33.00% | ₹2.4 L+₹7,537.60 (3.24%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.7 L+₹32,662.91 (14.0%)Admitted-Fee/PreQual/Technical/Finance | -26.00% | ₹2.7 L+₹32,662.91 (14.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.9 L+₹54,198.90 (23.3%)Admitted-Fee/PreQual/Technical/Finance | -20.00% | ₹2.9 L+₹54,198.90 (23.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.2 L+₹90,128.10 (38.7%)Admitted-Fee/PreQual/Technical/Finance | -9.99% | ₹3.2 L+₹90,128.10 (38.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.6 L
EMD Value
₹10,770
Closing Date
10 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O PROTECTION BUND FOR GRAVEYARD NO AB RASHEED KHOKER HASSAN KHOKER KHARWAN AND OTHERS BLOCK BRENG
2026_RDPR_319100_7
ENIT84of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹10,770
12 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | - | cum | - | - |
| 2 | Supply / Spreading of Stone Solling With Hand Packed complete With 10.0 Kms Leads | - | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | - | cum | - | - |
| 4 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kgs | 1 | - |
| 5 | Providing Form Work of ordinary Timber planks to give a rough finish walls and attached features and removal of same.for foundation, footings, bases of columns etc for mass concrete. | - | sqm | - | - |
| 6 | Carriage of Diff. Material By M.Trans sand and aggregate 40kms | - | cum | - | - |
| 7 | Provision for Cost of Sign Board and Photographs, | - | no | - | - |
| 8 | Provision for Carriage of steel,cement and other unforeseen items | - | no | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1055875.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .