Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.6 LAdmitted-Fee/PreQual/Technical/Finance | -21.21% | ₹11.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.7 L+₹7,649.51 (0.66%)Admitted-Fee/PreQual/Technical/Finance | -20.69% | ₹11.7 L+₹7,649.51 (0.66%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.7 L
EMD Value
₹29,420
Closing Date
19 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Construction of Niabat office Purana Tulail.
2026_PWDJK_320205_3
(RnB) E-NIT No 38 of 2026-27 EE-RnB-Grz-4711-17 E-tendering Dated-08-08-2026
Open Tender
Civil Works
Percentage
120 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer RnB Division Gurez
₹29,420
Executive Engineer RnB Division Gurez
22 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
19 Aug 2026
10 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.0 m, including getting out excavated earth and disposal of surplus excavated earth as directed within a lead of 50 mts. All kinds of soil. | 35.01 | Cum | 256.85 | ₹8,992.32 |
| 2 | Providing & Laying of stone soling (duly hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete. | 10.97 | Cum | 1,200 | ₹13,164 |
| 3 | Providing and Laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 aggregate 40mm nominal ) using Nallah aggregates. | 2.45 | Cum | 5,070 | ₹12,421.5 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level - 1:1.5:3 (1 cement : 1.5 coarse sand : 3 aggregate 20 mm nominal size) using Nallah aggregates. | 7.2 | Cum | 7,640 | ₹55,008 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: in 1:3:6 (1 Cement : 3 coarse sand : 6 aggregate 40 mm nominal size ) using Nallah aggregates. | 16.27 | Cum | 5,560 | ₹90,461.2 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in superstructure above plinth level upto V floor level including curing in cement mortar 1:6 (1 cement; 6 course sand). | 15.66 | Cum | 9,027.2 | ₹1,41,365.95 |
| 7 | Reinforced Cement Concrete work in beams, suspended floors, roofs having slope upto15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 ( 1cement : 1.5 coarse sand : 3 stone aggregate of 20mm normal size.) using Nallah aggregates. | 3.17 | Cum | 9,600 | ₹30,432 |
| 8 | Centring and shuttering incld. Strutting, proping etc & removal of form work for Founadtions, footings, bases of columns for mass concrete. | 119.61 | Sqm | 286.35 | ₹34,250.32 |
| 8.01 | Lintel, Beam ,plinth beams,girders,bressumers and cantilevers. | 30.02 | Sqm | 577.55 | ₹17,338.05 |
| 8.02 | Suspended floors, roofs, landings, balconies and access platforms. | 7.09 | Sqm | 718.2 | ₹5,092.04 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_1063356.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .