| 1 | L1₹197.7 CrAdmitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹197.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹210.9 CrAdmitted-Finance | ₹210.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹222.5 CrAdmitted-Finance NCC HOUSE MADHAPUR HYDERABAD 500081 TELANGANA INDIA TELEPHONE 040 23268730 | ₹222.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹223.9 CrAdmitted-Finance | ₹223.9 Cr | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. Ashoka Buildcon Ltd L4 | VIJAI ELECTRICALS LTD L2 | NCC LIMITED L3 | LARSEN AND TOUBRO LIMITED L1 |
|---|---|---|---|---|---|---|---|
| 1.00Schedule No. 1- Supply of Plants (Indegenous) (Price Schedule-1) | |||||||
| 2.00Sch.–1 Guarding of 11 KV Line - 471.75 Km | |||||||
| 3.00 | Guarding angle 65x65x6 mm,1600 mm long (Galvanised) With Holding Clamp | 15,688 | Nos. | 1,196.23 ₹1.9 Cr | 1,010.52 ₹1.6 Cr | 1,188.86 ₹1.9 Cr | 1,316.53 ₹2.1 Cr |
| 4.00 | G.I. Wire No. 6 SWG along the span (For 1 Km. line) | 1,55,678 | Kg. | 87.34 ₹1.4 Cr | 82.39 ₹1.3 Cr | 86.8 ₹1.4 Cr | 79.89 ₹1.2 Cr |
| 5.00 | G.I. Wire No. 8 SWG accross the span (For 1 Km. line) | 51,893 | Kg. | 87.34 ₹45.3 L | 82.39 ₹42.8 L | 86.8 ₹45.0 L | 79.89 ₹41.5 L |
| 6.00 | Turn Buckle | 14,646 | Nos. | 205.87 ₹30.2 L | 220.63 ₹32.3 L | 204.6 ₹30.0 L | 46.07 ₹6.7 L |
| 7.00 | Eye Bolt | 35,220 | Nos. | 61.69 ₹21.7 L | 85.76 ₹30.2 L | 61.31 ₹21.6 L | 74.71 ₹26.3 L |
| 8.00 | G.I. Wire No. 16 SWG for binding | 1,363 | Kg. | 99.82 ₹1.4 L | 88.62 ₹1.2 L | 99.2 ₹1.4 L | 98.94 ₹1.3 L |
| 9.00Sch.–2 Road/ Communication Lines/ 33 kV Lines crossing of 11 KV Lines on STP 13 Mtr with Cradle Guarding - 5716 Nos. | |||||||
| 10.00 | Single support 13 Mtr. STP | 11,432 | Nos. | 36,806.99 ₹42.1 Cr | 31,998.38 ₹36.6 Cr | 36,580.5 ₹41.8 Cr | 33,345.06 ₹38.1 Cr |
Tender Value
₹106 Cr
EMD Value
₹2.1 Cr
Closing Date
18 Feb 2022, 1:00 pmClosed
C.E. (Tech.-ADB), DVVNL, Agra
Chief Engineer (Tech.-ADB), Urja Bhawan, DVVNL, Agra-282007.
Additional activities for construction of 11 KV Feeders for separation of agricultural consumers and associated works in Agra-I, II and Kanpur-II zone under DVVNL.
2021_DVVNL_664501_2
SE(T)-05/2021-22
Open Tender
Electrical Works
365 days
DVVNL
Annexed with Tender Document.
3 documents required · 3 mandatory
₹29,500
Executive Engineer (Administration) DVVNL, Agra
₹2.1 Cr
9 Mar 2022
9 Feb 2022
18 Feb 2022
9 Feb 2022
18 Feb 2022
10 Feb 2022
Amount
Schedule No. 1- Supply of Plants (Indegenous) (Price Schedule-1)
Sch.–1 Guarding of 11 KV Line - 471.75 Km
Guarding angle 65x65x6 mm,1600 mm long (Galvanised) With Holding Clamp
G.I. Wire No. 6 SWG along the span (For 1 Km. line)
G.I. Wire No. 8 SWG accross the span (For 1 Km. line)
Turn Buckle
Eye Bolt
G.I. Wire No. 16 SWG for binding
Sch.–2 Road/ Communication Lines/ 33 kV Lines crossing of 11 KV Lines on STP 13 Mtr with Cradle Guarding - 5716 Nos.
Single support 13 Mtr. STP
ACSR Rabbit Conductor
X-Arm channel 100x50 mm Vtype Galvanized
X-Arm holding Clamp (Back Clamp) with bolts & nuts
11 kV polymer - Pin Insulator with Pin
GI. guarding Angle 75x75x6 mm 3010 mm long
F Bracket
Turn buckle
G.I. Wire 6 SWG along the span (For 50 Mtr. line)
G.I. Wire No. 8 SWG accross the span (For 50 Mtr. line)
G.I. Wire No. 16 SWG for binding
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Armour rod with ferrules for ACSR Rabbit/Weasel Helical Performed
Stone pad (300x300x75 mm)
11 kV SMC Number plate with clamp with N&B
11 kV SMC Danger board with clamp with N&B
G.I. Barbed wire
Red Oxide paint
Aluminium Paint
Aluminium binding wire-6 SWG
Earthing of pole by MS earthing rod of 20x2550 mm. and 6 SWG earthing wire etc.
Sch.-4 HT AB Cable (3x120+1x100) on 8.5m PCC Pole- 2Km.
PCC Pole, 8.5 Mtr. Long
11 KV 3x120 sq. mm AB Cable (with bare messenger wire)
HT Suspension Clamp
Channel 125x65x6mm (500 mm long) with back clamp
Bracing angle 65x65x6,450 mm
Pole Clamps
11 KV Polymer Disc Insulator B&S type 45 KN
Heat Shrinkable 1 ph. termination kit outdoor for 11 kV 3x120 Sq. mm. AB cable
Mid Span Jointing Sleeves (120 sq. mm)
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Straight through jointing kit (all size)
Alluminium jointing sleeves
GI Nut and Bolts (all Sizes)
Stone Pad (300x300x75mm)
Chemical Earthing of pole
Sch.– 5 New LT line on (3x95+1x70+1x16) sq.mm LT ABC Cable- 5.19 km
PCC Pole 8.5 Mtr. long
Stone pad (300x300x75mm)
Earthing of pole by MS earthing rod of 20x2550 mm. and 6 SWG earthing wire etc.
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Dead End clamps with I-Hook (Insulated)
Suspension clamps with I-Hook (Insulated)
95/50 sq. mm - 70/35 sq. mm PG Clamp (For line to line to line jumpering & energizing DB neutral)
Pole clamps
LT Insulation Piercing Connectors of 120-50 sq. mm -50-35 sq. mm size for energizing distribution kiosk/box
LT Insulation Piercing connectors (16 sq. mm -16 sq. mm) suitable for street light connection
Mid span jointing sleeves (95 sq. mm)
LT distribution boxes/kiosk, 3 phase on the LT Poles including all clamps & material required for mounting connections & sealing.
Insulated ABC of 3x95+1x70+1x16 sq. mm
On/Off swith for street light connections
1x35 mm2 XLPE/PVC insulated AL. cable for energising the distribution boxes/kiosks.
1x16 mm2 XLPE insulated Al. cable for energising the street light
Sch.– 6 New LT line on (3x50+1x35+1x16) sq.mm LT ABC Cable-31.44 km
PCC Pole 8.5 Mtr. long
Stone pad (300x300x75mm)
Earthing of pole by MS earthing rod of 20x2550 mm. and 6 SWG earthing wire etc.
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Dead End clamps with I-Hook (Insulated)
Suspension clamps with I-Hook (Insulated)
95/50 sq. mm - 70/35 sq. mm PG Clamp (For line to line to line jumpering & energizing DB neutral)
Pole clamps
LT Insulation Piercing Connectors of 120-50 sq. mm -50-35 sq. mm size for energizing distribution kiosk/box
LT Insulation Piercing connectors (16 sq. mm -16 sq. mm) suitable for street light connection
Mid span jointing sleeves (95 sq. mm)
LT distribution boxes/kiosk, 3 phase on the LT Poles including all clamps & material required for mounting connections & sealing
Insulated ABC of 3x50+1x35+1x16 sq. mm
On/Off swith for street light connections
1x35 mm2 XLPE/PVC insulated AL. cable for energising the distribution boxes/kiosks.
1x16 mm2 XLPE insulated Al. cable for energising the street light
Sch.– 7 Single Phase DTR Shifting- 567 Nos.
Distribution Box (D.B.)
GI Channel 125x65x6, 1300 mm (Tee-off)
Clamp for D.B. (40×6 mm)
Clamp for T/F (75×8 mm)
11 KV Fuse Set With Jolding Clamp
11 KV Composite Polymer Pin Insulator with Nut and washers
ACSR Weasal Jumper
Eye Bolts for Service Cables
PVC Cables 10 Sq.mm. Single Core
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Earthing of Pole by MS Earthing Rod of 20×2550 mm. and 6 SWG Earthing Wire etc
Sch.– 8 Single 11 Mtr. ST Pole in 11 KV New Line- 6192 Nos.
11 Mtr. ST Pole
Stone Pad (300 x 300x75mm)
11KV `V' type Cross arm 65x65x6 mm, M.S. Angle
Cross arm holding Clamp with nuts & bolts
11 KV Composite Polymer Pin Insulator with Nut and washers
`F' Bracket with N&B
SMC Danger Board with clamp, & nuts
G.I Barbed wire
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Earthing of pole by MS earthing rod of 20x2550 mm. and 6 SWG earthing wire etc.
Aluminium Paint
Red Oxide paint
Total Schedule No. 1- Supply of Plants (Indegenous)
Schedule No. 2 - Incidental Expenses including Inland freight & Insurance to be incurred in Employer’s Country (Price Schedule-2)
Sch.– 1 Guarding of 11 KV Line-471.75 Km
Guarding angle 65x65x6 mm,1600 mm long (Galvanised) With Holding Clamp
G.I. Wire No. 6 SWG along the span (For 1 Km. line)
G.I. Wire No. 8 SWG accross the span (For 1 Km. line)
Turn Buckle
Eye Bolt
G.I. Wire No. 16 SWG for binding
Sch.– 2 Road/ Communication Lines/ 33 kV Lines crossing of 11 KV Lines on STP 13 Mtr with Cradle Guarding - 5716 Nos.
Single support 13 Mtr. STP
ACSR Rabbit Conductor
X-Arm channel 100x50 mm Vtype Galvanized
X-Arm holding Clamp (Back Clamp) with bolts & nuts
11 kV polymer - Pin Insulator with Pin
GI. guarding Angle 75x75x6 mm 3010 mm long
F Bracket
Turn buckle
G.I. Wire 6 SWG along the span (For 50 Mtr. line)
G.I. Wire No. 8 SWG accross the span (For 50 Mtr. line)
G.I. Wire No. 16 SWG for binding
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Armour rod with ferrules for ACSR Rabbit/Weasel Helical Performed
Stone pad (300x300x75 mm)
11 kV SMC Number plate with clamp with N&B
11 kV SMC Danger board with clamp with N&B
G.I. Barbed wire
Red Oxide paint
Aluminium Paint
Aluminium binding wire-6 SWG
Earthing of pole by MS earthing rod of 20x2550 mm. and 6 SWG earthing wire etc.
Sch.– 4 HT AB Cable (3x120+1x100) on 8.5m PCC Pole- 2Km.
PCC Pole, 8.5 Mtr. Long
11 KV 3x120 sq. mm AB Cable (with bare messenger wire)
HT Suspension Clamp
Channel 125x65x6mm (500 mm long) with back clamp
Bracing angle 65x65x6,450 mm
Pole Clamps
11 KV Polymer Disc Insulator B&S type 45 KN
Heat Shrinkable 1 ph. termination kit outdoor for 11 kV 3x120 Sq. mm. AB cable
Mid Span Jointing Sleeves (120 sq. mm)
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Straight through jointing kit (all size)
Alluminium jointing sleeves
GI Nut and Bolts (all Sizes)
Stone Pad (300x300x75mm)
Chemical Earthing of pole
Sch.-5 New LT line on (3x95+1x70+1x16) sq.mm LT ABC Cable- 5.19 km
PCC Pole 8.5 Mtr. long
Stone pad (300x300x75mm)
Earthing of pole by MS earthing rod of 20x2550 mm. and 6 SWG earthing wire etc.
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Dead End clamps with I-Hook (Insulated)
Suspension clamps with I-Hook (Insulated)
95/50 sq. mm - 70/35 sq. mm PG Clamp (For line to line to line jumpering & energizing DB neutral)
Pole clamps
LT Insulation Piercing Connectors of 120-50 sq. mm -50-35 sq. mm size for energizing distribution kiosk/box
LT Insulation Piercing connectors (16 sq. mm -16 sq. mm) suitable for street light connection
Mid span jointing sleeves (95 sq. mm)
LT distribution boxes/kiosk, 3 phase on the LT Poles including all clamps & material required for mounting connections & sealing.
Insulated ABC of 3x95+1x70+1x16 sq. mm
On/Off swith for street light connections
1x35 mm2 XLPE/PVC insulated AL. cable for energising the distribution boxes/kiosks.
1x16 mm2 XLPE insulated Al. cable for energising the street light
Sch.– 6 New LT line on (3x50+1x35+1x16) sq.mm LT ABC Cable-31.44 km
PCC Pole 8.5 Mtr. long
Stone pad (300x300x75mm)
Earthing of pole by MS earthing rod of 20x2550 mm. and 6 SWG earthing wire etc.
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Dead End clamps with I-Hook (Insulated)
Suspension clamps with I-Hook (Insulated)
95/50 sq. mm - 70/35 sq. mm PG Clamp (For line to line to line jumpering & energizing DB neutral)
Pole clamps
LT Insulation Piercing Connectors of 120-50 sq. mm -50-35 sq. mm size for energizing distribution kiosk/box
LT Insulation Piercing connectors (16 sq. mm -16 sq. mm) suitable for street light connection
Mid span jointing sleeves (95 sq. mm)
LT distribution boxes/kiosk, 3 phase on the LT Poles including all clamps & material required for mounting connections & sealing
Insulated ABC of 3x50+1x35+1x16 sq. mm
On/Off swith for street light connections
1x35 mm2 XLPE/PVC insulated AL. cable for energising the distribution boxes/kiosks.
1x16 mm2 XLPE insulated Al. cable for energising the street light
Sch.– 7 Single Phase DTR Shifting- 567 Nos.
Distribution Box (D.B.)
GI Channel 125x65x6, 1300 mm (Tee-off)
Clamp for D.B. (40×6 mm)
Clamp for T/F (75×8 mm)
11 KV Fuse Set With Jolding Clamp
11 KV Composite Polymer Pin Insulator with Nut and washers
ACSR Weasal Jumper
Eye Bolts for Service Cables
PVC Cables 10 Sq.mm. Single Core
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Earthing of Pole by MS Earthing Rod of 20×2550 mm. and 6 SWG Earthing Wire etc
Sch.– 8 Single 11 Mtr. ST Pole in 11 KV New Line- 6192 Nos.
11 Mtr. ST Pole
Stone Pad (300 x 300x75mm)
11KV `V' type Cross arm 65x65x6 mm, M.S. Angle
Cross arm holding Clamp with nuts & bolts
11 KV Composite Polymer Pin Insulator with Nut and washers
`F' Bracket with N&B
SMC Danger Board with clamp, & nuts
G.I Barbed wire
Stay Complete (with stay Rod 16x1800, stay wire 5 kg., stay clamp, bolt & nut) (As per Annex.-01)
Earthing of pole by MS earthing rod of 20x2550 mm. and 6 SWG earthing wire etc.
Aluminium Paint
Red Oxide paint
Total Schedule No. 2 - Incidental Expenses including Inland freight & Insurance to be incurred in Employer’s Country
(INSTALLATION SERVICES ) (Price Schedule-3)
Sch. – 1 Guarding of 11 KV Line-471.75 Km
Provision of Guarding for 11 kV line including installation of all materials as per Schedule
Sch.– 2 Installation of cradle guarding for Road crossing/ Communication Lines /11kv line crossing including erection of 13 Mtr. STP and installation of all materials - 5716 Nos.
Installation of cradle guarding for Road crossing/ Communication Lines /11kv line crossing including erection & concreting of 13 Mtr. STP and installation of all materials as per Schedule- 2 (Except stringing of Rabbit Conductor).
Stringing of 3- ph, 3-wire, 11 KV line with ACSR Rabbit conductor as per specification and drawing including all activities and installation materials including stringing of conductor at proper tension/ sag, binding of conductor with insulator, mid span jointing, jumpering etc. complete in all respect.
Sch.– 4 HT AB Cable (3x120+1x100) on 8.5m PCC Pole- 2 Km.
PCC Pole, 8.5 Mtr. Long with all Accesseories as per Schedule with Concreting of Pole/Support (0.268 cu.M.)
Stringing of 11 KV 3x120 sq. mm AB Cable (with bare messenger wire)
Erection of complete Stay Set with GI stay wire including excavation of stay pit, concreting, installation of all accesories including 50x8 mm stay clamp, stay insulator, anchor plate (200x200x6), nut bolts, turn buckles, 1.8 m long 16 mm dia. Solid GS Stay Rod & 7/3.15 mm dia. GI stranded wire complete as per technical specifications and approved drawings.
Pipe Earthing using GI pipe (80 mm dia, 3 m long ), installation of GI Strips, Chemical bonding and treating with charcoal & salt to obtin required earth resistance as per specifications and approved drawings.
Sch.– 5 New LT line on (3x95+1x70+1x16) sq.mm LT ABC Cable- 5.19 km
PCC Pole, 8.5 Mtr. Long with all Accesseories as per Schedule with Concreting of Pole/Support (0.268 cu.M.)
Earthing of pole as per specification and drawing including installation of MS earthing rod of 20x2550 mm with all accessories and 6 SWG earthing wire.
Erection of complete Stay Set with GI stay wire including excavation of stay pit, concreting, installation of all accesories including 50x8 mm stay clamp, stay insulator, anchor plate (200x200x6), nut bolts, turn buckles, 1.8 m long 16 mm dia. Solid GS Stay Rod & 7/3.15 mm dia. GI stranded wire complete as per technical specifications and approved drawings.
Stringing of Insulated ABC of 3x95+1x70+1x16 sq. mm
Sch.– 6 New LT line on (3x50+1x35+1x16) sq.mm LT ABC Cable-31.44 km
PCC Pole, 8.5 Mtr. Long with all Accesseories as per Schedule with Concreting of Pole/Support (0.268 cu.M.)
Earthing of pole as per specification and drawing including installation of MS earthing rod of 20x2550 mm with all accessories and 6 SWG earthing wire.
Erection of complete Stay Set with GI stay wire including excavation of stay pit, concreting, installation of all accesories including 50x8 mm stay clamp, stay insulator, anchor plate (200x200x6), nut bolts, turn buckles, 1.8 m long 16 mm dia. Solid GS Stay Rod & 7/3.15 mm dia. GI stranded wire complete as per technical specifications and approved drawings.
Stringing of Insulated ABC of 3x50+1x35+1x16 sq. mm
Sch.– 7 Single Phase DTR Shifting- 567 Nos.
Single Phase DTR Shifting with required all accessories
Sch.– 8 Single 11 Mtr. ST Pole in 11 KV New Line- 6192 Nos.
11 Mtr. ST Pole with all Accesseories as per Schedule with Concreting of Pole/Support (0.44 cu.M.)
Erection of complete Stay Set with GI stay wire including excavation of stay pit, concreting, installation of all accesories including 50x8 mm stay clamp, stay insulator, anchor plate (200x200x6), nut bolts, turn buckles, 1.8 m long 16 mm dia. Solid GS Stay Rod & 7/3.15 mm dia. GI stranded wire complete as per technical specifications and approved drawings.
Earthing of pole as per specification and drawing including installation of MS earthing rod of 20x2550 mm with all accessories and 6 SWG earthing wire.
Sch.– 3 Control Room Extension- 23 Nos.
Extension of substation control room building (if required) to provide additional space for new outgoing feeder panel/s. This includes all works indicated in Sch-CW1 in Volume III (Refer notes 1-10). Each extension shall be approximately 36 sqm (6x6 m).
Total Schedule No.3 - (INSTALLATION SERVICES ) (Price Schedule-3)
VIJAI ELECTRICALS LTD
NCC LIMITED
M/s. Ashoka Buildcon Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid