Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC Bid is awarded as the bidding price was lowest among all bidding contractors | |
| 2 | L2₹9.4 L+₹11,962 (1.28%)Rejected-AOC | L2 | Rejected-AOC The bid is rejected as the bid amount for the work was second
Compared to the lowest 1st successful bidder | |
| 3 | L3₹10.0 L+₹63,548 (6.81%)Rejected-AOC | L3 | Rejected-AOC The bid is rejected as the bid amount for the work was third
Compared to the lowest 1st successful bidder |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
2 Mar 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. M.G.C.Q.C.D-2, Haridwar
E.E. M.G.C.Q.C.D-2, Haridwar
Construction of V.R.B. at km. 5.080 of Chitawali Minor of M.G.C. Stage-II.
2021_UPIDC_555099_13
05/EE/2020-21
Open Tender
Civil Works - Canal
Item Wise
120 days
sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹22,000
19 Sept 2021
18 Feb 2021
3 Mar 2021
18 Feb 2021
2 Mar 2021
18 Feb 2021
90 days
Amount
P/Laying brick on edge soling i/c all. cost of material and labour, T&P etc complete.
Earth work in Excavation in foundation in all types of soil including all lead upto 30M and lift upto 1.50M with all labour and T&P etc .
Shuttering for P.C.C work including cost of all material labour and T&P etc.
Laying Cement Concrete (1:3:6) including cost of all material labour and T&P etc . complete.
Ist Class Brick work in 1:4 C.M. 23cm thick brick wall including cost of all material labour and T&P etc . complete.
Centering and shuttering for R.C.C work including cost of all material labour and T&P etc.
Laying R.C.C (1:1.5:3) including cost of all material labour and T&P etc .
Supply & placing steel reinforcement in R.C.C.work i /c all cost of materials, cutting , bending , binding, placing& labours , t&p etc complete.
Laying Cement Concrete (1:6:12) including cost of all material labour and T&P etc . complete.
Laying C.C (1:1.5:3) for wearing coat including cost of all material labour and T&P etc . Complete.
Struck deep cement pointing with 1:2 cement mortar.
S/F Drainage spout p,v.c pipe
S/F 25 mm thick expansion joints.
S/Laying tarfelt in 3 layers for bearing of slab.
S/F wheel guard stone i/c all cost of material, labour ,T&P etc. complete.
Dismenteling of brick on edge soling 115 mm thick
Earth work in filling for making and ramp i/c all lead and lifts , dressing compaction etc. complete.
P/Laying brick on edge soling i/c all. cost of material and labour, T&P etc complete.
Laying brick on edge soling with old bricks (labour only)
M/S ARYAN CONSTRUCTION AND SUPPLIERS
DHARIWAL CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .