Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹6.1 L+₹42,627 (7.53%)Rejected-AOC | ₹6.1 L+₹42,627 (7.53%) | L2 | Rejected-AOC L2 BIDDER |
| Sl No | Description | Qty | Unit | V.S.A.Enterprises L1 | Sadha Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Sand and silt Under water Earth work excavation and depositing on bank with initial lead of 10 m & initial lift of 2 m in Slush and Silt Under water upto 0.75 m depth requiring the aid basket and vessels etc,complete | 3,118.5 | Cum | 100 ₹3,11,850 Lowest | 112 ₹3,49,272 |
| 2.00 | Hire Charges for Conveyence of excavated silt up to lead of 3km from the work site including loading, unloading, transporation charges and incidental charges by 3 unit capacity tipper lorry with driver and fuel charges for diesel and labour charges for dirver. | 12 | trips | 938 ₹11,256 Lowest | 940 ₹11,280 |
| 3.00 | Hire charges for deploying earth moving machinery JCB for earthwork including diesel, oil and labour charges etc.,complete. | 32 | hrs | 973 ₹31,136 | 940 ₹30,080 Lowest |
| 4.00 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 3,118.5 | M3 | 68 ₹2,12,058 Lowest | 70 ₹2,18,295 |
Tender Value
₹7.1 L
EMD Value
₹7,100
Closing Date
24 Jun 2026, 3:00 pmClosed
THE COMMISSIONER
AVADI CITY MUNICIPAL CORPORATION AVADI
Desilting of Existing Storm Water Drains at Kamaraj Nagar Main Road in Ward no 39,45
2026_MAWS_681428_1
Roc No.3016/2026/E1-8
Open Tender
Civil Works
Fixed-rate
60 days
Ward no 39, 45
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹7,100
3 Aug 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sand and silt Under water Earth work excavation and depositing on bank with initial lead of 10 m & initial lift of 2 m in Slush and Silt Under water upto 0.75 m depth requiring the aid basket and vessels etc,complete | 3,118.5 | Cum | - | - |
| 2 | Hire Charges for Conveyence of excavated silt up to lead of 3km from the work site including loading, unloading, transporation charges and incidental charges by 3 unit capacity tipper lorry with driver and fuel charges for diesel and labour charges for dirver. | 12 | trips | - | - |
| 3 | Hire charges for deploying earth moving machinery JCB for earthwork including diesel, oil and labour charges etc.,complete. | 32 | hrs | - | - |
| 4 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 3,118.5 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_818921.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .