Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC NO 83 THAMMAIAH GARDEN ABBIGERE CHIKKABANAVARA PO BANGALORE 560 090 | BENGALURU URBAN | KARNATAKA | 560090 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹17.2 L+₹4.0 L (30.3%)Rejected-Finance | L2 | Rejected-Finance Being not eligible | |
| 3 | L3₹17.2 L+₹4.0 L (30.3%)Rejected-Finance | L3 | Rejected-Finance Being not eligible | |
| 4 | L4₹19.4 L+₹6.2 L (46.7%)Rejected-Finance NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L4 | Rejected-Finance Being not eligible | |
| 5 | L5₹20.1 L+₹6.9 L (52.4%)Rejected-Finance | L5 | Rejected-Finance Being not eligible |
Tender Value
₹19 L
EMD Value
₹38,000
Closing Date
26 Feb 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Col Subhro Banerjee CWE
Commander Works Engineers AF South Gangamma Circle Opp Guard Room 410 AFS Jalahalli Bangalore 560013
REPAIRS MAINT TO EXTERNAL HT ELECTRIC SYSTEM UNDER AGE EM EAST AREA JALAHALLI
2022_MES_503900_1
85219/E8
Open Tender
Civil Works
Item Rate
240 days
GE (M) (AF) Jalahalli
As per tender documents
7 documents required · 7 mandatory
₹500
GE (M) (AF) Jalahalli
₹38,000
2 Jun 2022
27 Jan 2022
28 Feb 2022
27 Jan 2022
26 Feb 2022
14 Feb 2022
27 Jan 2022 - 5 Feb 2022
60 days
Amount
Excavating in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth for laying of cable, foundation etc, and getting out in soft /loose soil all as directed.
Excavating in trenches not exceeding 1.5m wide and exceeding 1.5m in but not exceeding 3.0m depth for laying of cable, foundation etc, and getting out in hard /dense soil all as directed.
Returning filling in including spreading, leveling Watering and well ramming in layers not exceeding 25cm all as directed.
Removing excavated surplus soil to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point all as directed.
Supply and spread fine riddled sand in trenches, as in cable cushioning all as directed. Note :- Punned thickness will be considered for payment.
Supplying & laying un-reinforced precast concrete cable cover, class HV,Type 1, flat, size 300 mm x 180 mm x 40 mm laid over under ground cable for protection all as specified and as directed.
M&L for cutting the tarmac / hard standings and excavating in trenches across the road not more than 0.40 Mtr wide and not more than 0.60 Mtr in depth, for laying under ground cable including refilling of old removed earth and well ramming in layers and top surface to be matched with existing surface by means of PCC 1:3:6, type C1 and matching with the surroundings all as directed.
Boring of holes under road, pavement hard standings by trenchless technologyusing ultra sound technique and necessary machine includings HDPE pipe of 100 mm dia suitable for 0.4 Mpa working pressure complete all as specified.
Dismantling steel pole / struts of any size all as directed.
Dismantling concrete pole / struts of any size all as directed.
Supply and fix steel tubular swaged poles complete with cast iron base plate, finial taper plug, bolts nut and screws as specified type 410 SP-55 (11.0 meters long) including two coats of aluminium paint over a coat of red oxide primer all as specified and as directed. Note: Necessary earth work excavation, removal of surplus soil & concrete shall be measured and paid separately in respective items.
Supply and fix prestressed concrete pole, 11.0 metres long 152mm x 152mm at top and 152mm x 260mm at bottom, class 9 all as specified and as directed. Note: Necessary earth work excavation, removal of surplus soil & concrete shall be measured and paid separately in respective items.
Material and labour for plain cement concrete 1:4:8 type D2 using 40 mm graded stone aggregate for foundationsof pole / filling around the fencing post all as specified and as directed.
Material and labour for plain cement concrete 1:3:6 type C1 using 20 mm graded stone aggregate for path ways, hard standing & pole coping including necessary form work and applying two coats of white wash on exposed surfaces etc complete all as specified
Dismantling of unserviceable cross arm such as MS channel /angle section etc complete all as directed.
Material and labour for cross arms, bracings, supports, clamps and back plates, fabricated from structural steel including nuts, blots, washers, welding, bending cold or hot, drilling holes for bolts in any shape or size as indicated or directed inclusive of one primer coat, one under coat and one finishing coat of aluminum paint all as specified and as directed.
Dismantling insulators of any type and size all as directed.
Material and labour for pin type, porcelain vitreous, white, brown or green insulator including one galvanised mild steel spindle, two galvanised iron washers and one galvanised iron nut 150mm height, 150mm dia for 11000 volts grade all as specified and as directed.
Material and labour for disc type, porcelain vitreous, 145 mm height and 255 mm dia ball and socket type, white, brown or green two-in-series assembly for tension with tension clamps for conductors, working pressure 11000 volts grade all as specified and as directed.
Material and labour for danger notice plate of 1.6mm thick mild steel sheet with vitreous enamelled with letter figures and conventional skull and bones in signal red colour and fixed with MS clamps bolts and nuts of approved size for HT, 25 x 20cm all as directed and as specified.
Dismantling air break gang operated switches vertical/horizontal mounted with two or three insulators per phase including insulators and and operating mechanism for repair/ replacement of broken/worn out components all as directed.
Material and labour for switch air break, gang operated triple pole, mechanically operated (with GI operating rod), mounted on insulator and steel frame with operating mechanism worked from ground level, vertical type for current rating upto 200 Amps on HT 11000 volts working pressure, including locking arrangement with 06 lever lock and painting the steel surfaces with two coats of synthetic enamelled paint over a coat of red oxide primer etc all as specified and as directed.
Material and labour for switch air break, gang operated triple pole, mechanically operated (with GI operating rod), mounted on insulator and steel frame with operating mechanism worked from ground level, vertical type for current rating upto 400 Amps on HT 11000 volts working pressure, including locking arrangement with 06 lever lock and painting the steel surfaces with two coats of synthetic enamelled paint over a coat of red oxide primer etc all as specified and as directed.
Repair / service / overhauling of gang operating devices 11000volts upto 400 Amps including greasing all the moving parts and applying white petroleum jelly at the contact points, tightening all nuts and bolts and providing PG clamps 06 Nos, additional nut and bolts commissioning and testing complete including dismantling and replacing all the unserviceable parts / spares all as specified and as directed.Note: All the spares replaced shall be measured and paid separately
Supply only moving contact blades
Supply only fixed contact jaw copper
Supply only copper braded tape (Tinned copper flexible jumper)
Supply only mild steel supporter
Supply only back connected plate
Supply only jumper carrier
Material and labour for replacement of expulsion / drop out / horn gap type fuse carrier assembly outdoor type 200Amps capacity including fuse element upto 25 Amps and insulator conforming to IS specifications suitable for 11000 volts (HT) all as specified.
Material and labour for replacement of expulsion / drop out / horn gap type fuse carrier assembly outdoor type 200Amps capacity including fuse element above 25 Amps & upto 50Amps and insulator conforming to IS specifications suitable for 11000 volts (HT) all as specified and as directed.
Material and labour for lightning arresters for outdoor use expulsion type suitable for 11000 volts (HT) complete with all fittings, transmission class, dis-charge capacity 10 KA including taking down existing lightening arresters of any type and size all as directed.
Material and labour for fixing aerial fuse including fuse element suitable for HT 11 KV drop out fuse carrier up to 15 A rating all as directed after dismantling the exisiting out lived fuse barrel complete all as specified and as directed.
Material and labour for fixing aerial fuse including fuse element suitable for HT 11 KV drop out fuse carrier up to 30 A rating all as directed after dismantling the exisiting out lived fuse barrel complete all as specified and as directed.
Material and labour for Replacement of galvanised iron strip 32 x 6mm buried in ground or fixed on pole with all accessories including dismantling old one all as specified and as directed.
Supply, lay, test and commissioning of XLPE insulated screened PVC bedded, galvanised steel strip or wire, armoured, heavy duty electric power cable (HT UG), 11000 volts grade with stranded aluminium conductor of size 3 core 400 Sqmm (Earthed) including takingout existing unserviceable cable all as specified and as directed.
Supply, lay, test and commissioning of XLPE insulated screened PVC bedded, galvanised steel strip or wire, armoured, heavy duty electric power cable (HT UG), 11000 volts grade with stranded aluminium conductor of size 3 core 185 Sqmm(Earthed) including takingout existing unserviceable cable all as specified and as directed.
Supply, lay, test and commissioning of XLPE insulated screened PVC bedded, galvanised steel strip or wire, armoured, heavy duty electric power cable (HTUG), 11000 volts grade with stranded aluminium conductor of size 3 core 120 Sqmm ( Earthed) including takingout existing unserviceable cable all as specified and as directed.
Supply, lay, test and commissioning of XLPE insulated screened PVC bedded, galvanised steel strip or wire, armoured, heavy duty electric power cable (HTUG), 11000 volts grade with stranded aluminium conductor of size 3 core 95 Sqmm ( Earthed) including takingout existing unserviceable cable all as specified and as directed.
Material and labour for cable jointing kit for 11KV (Earthed) grade cable for outdoor end termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 120 to185 Sqmm and testing after jointing including taking out unserviceable joint kit complete all as specified and as directed.
All as per item No. 41 described here-in-before but 3 core 95 Sqmm
All as per item No. 41 described here-in-before but 3 core 400 Sqmm
Material and labour for cable jointing kit for 11KV (Earthed) grade cable for indoor end termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 120 to 185 Sqmm and testing after jointing including taking out unserviceable joint kit complete all as specified and as directed.
All as per item No.44 described here-in-before but 3 core 95 Sqmm
Material and labour for cable jointing kit for 11KV (Earthed) grade cable for out door straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 120 to 185 Sqmm and testing after jointing including taking out unserviceable joint kit complete all as specified and as directed.
All as per item No. 46 described here-in-before but 3 core 95 Sqmm
Supply and fix galvanised iron tubing light grade 100mm bore galvanized with all fitting laid in trenches / road crossing for UG cable protection all as specified and as directed.
Material and labour for jumper connections between GOD and drop out fuses and transformers with ACSR conductors of suitable size and length (Weasel) including necessary lugs wherever required / aluminium heavy duty PG clamps / binding properly without any loose contact after removing the old jumpers including PVC sleeves all as specified and as directed.
Material and labour for repairs to transformer at locations where installed after removing nuts and bolts of transformers of capacity 100 to 400 KVA and taking out the leaked portion such as bushes, joints and replace the gaskets after cleaning the suface and refixing the nuts & bolts and ensure no leakage all as specified and as directed. Note: The quoted unit rate shall be included making necessary arragements to remove the oil in the conservator/ up to the level of the portion to be opened in safe drums and refilling after the repair works. The tranformer repair works shall be carried out only by engaging specialised and experianced technicans. The oil shall be filterd before refilling if found required. The charge for filteration will be measured and paid separately rate quoted shall deemed to be included the cost of spares such as cork sheet gasket, nut/bolts and washers.
Material and labour for repair and servicing of HT 11 KV Four pole structure by replacing galvanized PG clamps, GI bolts and nuts, tightening of ACSR conductor with insulation of any size as jumpers including lubricating the moving parts of AB switch and cleaning of all disc /pin insulators and applying silicon compound for prevention of arcing due to dust/ salt deposits over the surfaces including applying one coat of red oxide primer on rusted portions after preparation of surfaces &applying a coat of aluminum paint to the entire steel structure complete all as directed. Note: Quoted unit rate shall be inclusive of ACSR conductor for jumpering, GI hardware like nuts, bolts two coats of white wash on exposed concrete surfaces, etc complete all as directed by Engr in Charge
All as per item No. 51 described her-in-before but two pole structure
Material and labour preparing old faded painted surface of 11 metre long steel tubular pole complete with including all accessories such as cross arms bracings, brackets etc, and applying two coats of aluminium paint including writing pole number with paint same as existing all as specified and as directed.
Material and labour for disconnecting carefully electrical connection from both HT/ LT (primary & secondary) sides of the transformer, keeping them at safe side and taking out the transformer indoor/ outdoor type of capacity 100 KVA to 400 KVA, 11 KV/ 0.433 KV, step down any make for carrying out complete overhauling which shall comprise of the following:-
(a) Lifting, transporting, handling, the transformer to workshop and opening top cover of the transformer by unscrewing nuts, bolts, washers etc. including disconnecting core assembly from HT/ LT bushing and lifting the same gently and taking out from the shell (container/ body) of the transformer.
(b) Draining out transformer oil from the above said transformer in the suitable capacity of container /drums and keeping it in safe custody for reuse.
(c) Cleaning the transformer body from inside, removing deposited dirt/ sludge/ foreign particles etc. from the bottom/ body of the transformer and drying up the shell from inside before refilling of the transformer oil.
(d) Cleaning and washing thoroughly core and windings of the transformer by hosing down with clean dry oil conforming to IS 335/1983, removing deposited dirt/sludge/foreign particles from the windings/ core, thorough inspection of windings, providing insulations to leads and terminals, heating/ drying/ baking complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance etc. all as per IS 1986-87 and directed.
(e) Lifting and refixing core assembly inside the transformer shell gently and carefully, connecting primary/ secondary/ Neutral connections to the bushings assembly, fixing of tap change over including tightening of nuts, bolts, washers of the core to reduce humming noise all as directed.
(f) Refilling the filtered transformer oil in the shell of transformer complete.
(g) Refixing the top cover including replacement of cork sheet/ gasket 8mm thick, tightening of nuts/ bolts/ washers etc. and replacement of breather with silica gel crystal type all as directed.
(h) Lifting/ shifting to the place from where removed and re-installing the transformer including connecting primary/ secondary/ neutral connections etc. all as directed.
(j) The inspection of transformer shall involve:- (i) Checking of all clamps, nuts, bolts including core bolts & cover fixing bolts. (ii) Checking all brazings, joints, tap heads and connection joints. (iii) Checking all jumpers, terminations/ connections inside the transformer. (iv) Checking the Buchholtz relay/ conservator MOG if any. (v) Painting of transformer complete with two coats of synthetic enamel paint externally transformer shell complete all as directed. (vi) Inspection of tap changer, checking the moving and fixed contacts for contact wear and connection to winding.
Note:- (i) Any damage to insulators/ bushes/ windings etc. while in the custody of the contractor shall be made good at no extra cost to govt. The serviceability of the transformer shall be checked and confirmed by the contractor before taking into his custody. (ii) M&L for rewinding/ re-insulation of HT/ LT (primary/ secondary) coils, bushes, studs, Transformer oil,cable box, replacement of buchholtz relay/ MOG if any etc will be measured and paid separately.
M&L for rewinding of HT coils / LT coil of transformer with super enameled copper wire / strips to match with existing gauge or as recommended by the manufacturer for turn ratio and impedance including requisite paper / insulation material in each layer of winding complete all as specified and as required
Testing of di-electric strength i.e. BDV test for 60 sec with stand the transformer oil of any capacity to authorized value 60 KV using standard oil test kit as per result as IS 335-1972 complete all as specified and directed. Note:- a) The rate shall be deemed to iclude for arrangement of standard testing kit. b)Sample of oil to be collected and testing to be done at transformer site. c)Testing to be done with gap setting - 2.5 mm , temperature setting onambient and frequency with 50 cycle d)Test report shall be enclosed at the time of payment.
Filtration of transformer oil of transformers installed at various locations to achieve di-electric strength not less than 60 KV for 1 minute at 2.5 mm gap as per relevant IS with portable filtration plant, testing of the oil for the di-electric strength before filtration and after filtration complete all as directed. Note :- a) The rate quoted shall be deemed to include for taking necessary conections to filteration plant from transformer and switch gear oil duly removing the inlet and out let connections. (b) Electric supply for the filteration plant will be made available free of cost. (c) The dielectric strength value of the transformer oil shall be tested before & after filtration. And such testing shall be carried out twice in a year as specified and directed. (d) Test reports shall be enclosed at the time of payment.
Supply and topping up or replacement of transformer oil with di-electric strength not less than 60 KV in to the conservator tank/ body tank of the transforme etc at various locations complete all as specified and as directed.
Material and labour for replacement of silica gel breather assembly for HT distribution transformers of 250 KVA to 400 KVA capacity including dismantling old one all as specified and as directed
Material and labour for replacement gun metal drain valves of transformers from 100 KVA to 500 KVA capacities including dismantling old one all as specified and as directed.
Material and labour for replacement of the LT porcelain bushings complete of transformer from 100 KVA to 400 capacity distribution transformers of existing transformer make/ size/ type including dismantling old one all as specified and as directed .
Material and labour for replacement of the HT porcelain bushings complete of Transformer from 100 KVA to 400 capacity distribution transformers of existing transformer make/ size/ type including dismantling old one all as specified and as directed .
Material and labour for replacement of the LT bushing rod made out of gun metal with threading & of suitable length/ size all as per existing including metal rings/ bolts/ washers/ rubber rings etc. complete from 100 KVA to 200 KVA capacity distribution transformers of any make/ size/ type including dismantling old one all as specified and as directed
All as per item No: 62 described here in before but 250 KVA to 400 KVA capacity
Material and labour for replacement of the HT bushing rod made out of gun metal with threading & of suitable length/ size all as per existing including metal rings/ bolts/ washers/ rubber rings etc. complete from 100 to 400 KVA capacity distribution transformers of any make/ size/ type including dismantling old one all as specified and as directed
Material and labour for replacement of (OTI) Oil Temperature indicator suitable for 100 to 315 KVA capacity distribution transformers including dismantling old oneall as specified and as directed
Material and labour for preparation of old painted surfaces of transformers with coarse cloth/ brush and painting throughout externally on exposed surfaces with two coats of smoke grey colour synthetic enamel paint or approved colour as directed including writing of SM/MES Number on transformer and transformer details on plinth in white enamel paint on black enamel paint back ground complete including one coat of white wash for base foundation for 100 to 200 KVA capacity indoor / outdoor type transformer all as specified and directed by Engineer-in-charge.
M&L for fixing earth pit identifier board made out of MS sheet of size 300x150x3.0 mm fixed in MS angle 30x30x5 mm of 450mm long to be fixed to ground by means of cement concrete including painting with two coats of synthetic enamel paint over a coat of reoxide primer and writing the earth resisitance complete including excavation and earth work PCC type C1, 1:3:6 of size 150x150x150mm all as directed, including dismatling and taking out the old rusted / out lived earth indicators.
Taking down HT switch gear (Vacuum circuit breaker ) of capacity 400 to 800 Amps, 11 KV 250 to 450 MVA and strip opening the HT panel of rating 11 KV, 3 phase comprising of following repairs, overhauling, servicing and refixing the same after repairs/ overhauling:
(a) Tripping off the breaker, lowering the breaker with raising/lowering handle and pulling out the breaker complete from the panel along with the trolley for servicing/inspection/overhauling
(b) Servicing/Inspecting/checking of automatic safety shutter operation for serviceability and replacement of spares if required.
(b) Servicing/Inspecting/checking of circuit spout and cicuit spout connections for RYB phases and replacement of spares if required.
(c) Dismantling and checking of cross bar assembly, fixed contacts and current carrying parts of the breaker, trolley, insulated assembly and checking lamination with clamps, epoxy spout, isolator assembly etc.
(d) Setting, reassembling, cleaning, adjustment of fixed contacts, main contact, arcing contacts and chamber baffle pot assembly, moving contact for proper setting of auxiliary contacts operating mechanism.
(e) Servicing/Inspecting/checking of secondary sockets/busbar earthing plugs/earthing sockets and replacement of spares if required.
(f) Checking, setting and adjustment of lowering and raising operation of the breaker trolley.
(g) Lubrication and greasing of all moving parts of the trolley, stopper bolt for proper operating and closing of shutter gear, isolation resistance of trolley of with vacuum interrupter assembly.
h) Dismantling the complete instrument chamber/ HV cable box/LV cable box .Decarbonising/ cleaning the complete HT 11 KV 3 phase independent bus bar, bus bar chamber of HT panel and inspecting the bus bar insulators.
j) Checking, inspecting, calibration of relays, ammeters and voltmeters etc complete.
k) Checking complete electrical tripping circuit of HT panel including control wiring from secondary system rotary to tripping coil, auxiliary switch male and female housing cut out, etc. and wiring including replacement of damaged wire at places including operation on DC system, testing and commissioning complete all as directed.
m) Inspection of PTs and CTs
p) The inspection of HT switch gear shall involve:- (i) Inspection of truck & hoist assembly. (ii) Inspection of tank assembly & barriers. (iii) Inspection of assembly & components of solenoid assembly. (iv) Inspection of assembly & components of dependent mechanism. (v) Inspection of assembly & components of spring box mechanism. (vi) Inspection of motor mechanism spring charge assembly (vii) Inspection of assembly of trip unit & related components
Notes: (i) The rate quoted shall be deemed to include for necessary T&P, minor spares like nuts, bolts, washers, gasket, insulation tape, lugs, compound, copper wire etc. to put in to the VCBs /HT panels in serviceable condition, testing and commissioning all as specified (ii) Service report to be submitted before payment to be done.
Supply only for the Shunt trip coil 110 V DC/220 V DC /30 V DC suitable for 400 to 800 Amps 250 MVA to 450 MVA HT switch gear (VCBs) and 11 KV HT panel repair work under above schedule items
Supply only the HRC fuse (PT HT side) suitable for 400 to 800 Amps 250 MVA to 450 MVA HT switch gear (VCBs) and 11 KV HT panel repair work under above schedule items, all as specified and directed.
Supply only the current transformer of ratio 100/01 suitable for 400 to 800 Amps 250 MVA to 450 MVA HT switch gear (VCBs) and 11 KV HT panel repair work under above schedule items, all as specified and directed.
Supply only the space heater as per existing fitted in HT VCBs suitable for 400 to 800 Amps 250 MVA to 450 MVA HT switch gear (VCBs) and 11 KV HT panel repair work under above schedule items, all as specified and directed.
Supply only charging pawl set assy for 400 to 800 Amps 250 MVA to 450 MVA HT switch gear (VCBs) and 11 KV HT panel repair work under above schedule items, all as specified and directed.
Supply only theTrip Free Mechanism suitable for 400 to 800 Amps 250 MVA to 450 MVA HT switch gear (VCBs) and 11 KV HT panel repair work under above schedule items, all as specified and directed.
Supply only the Closing coil suitable for 400 to 800 Amps 250 MVA to 450 MVA HT switch gear (VCBs) and 11 KV HT panel repair work under above schedule items, all as specified and directed.
Supply only the Auxilary switch 4 NO + 4 NC suitable for 400 to 800 Amps 250 MVA to 450 MVA HT switch gear (VCBs) and 11 KV HT panel repair work under above schedule items, all as specified and directed.
Supply only the TNC switch suitable for 400 to 800 Amps 250 MVA to 450 MVA HT switch gear (VCBs) and 11 KV HT panel repair work under above schedule items, all as specified and directed.
Supply only the Indication lamps suitable for 400 to 800 Amps 250 MVA to 450 MVA HT switch gear (VCBs) and 11 KV HT panel repair work under above schedule items, all as specified and directed.
Material and labour for three phase PT of ratio 11000/110V, burden 100VA, class1.0 ,voltage factor 1.2 countinuous confirming top IS -3156/1992 including fuse unit disconnecting carefully HT electrical connection from PT and taking out the old unserviceable PT and connecting carefully electrical connection testing complete all as specified.
Disconnect and taking out the Numeric/ Microprocessor based relay including earth fault and over current relays of any type of any Make from 11 KV HT panel, cleaning the contacts, calibrating the relay by conducting secondary injection tests, checking of current transformer, rectification of defects in control wiring for proper tripping of circuit breakers through CTs and relay and tripping coils, adjustment/setting to plug and time multiplier settings of the relay to achieve the discrimination in tripping, tune/synchronies upstream breaker relay settings, re-installation of relay, testing & commissioning etc complete all as specified and as directed. Note: The Contractor has to arrange necessary testing Kits, testing equipments, tools etc and shall also submit detailed test reports, panel wise, duly spiral bound. Rental rates for the testing/calibration kits & connected equipments are deemed to be included in the quoted rate. Testing & calibration shall be carried out in the presence of representative of the department to the satisfaction of Engr in Charge.
Repair and servicing of HT 11KV out door type Ring main unit (RMU) of capacity 400 Amps with 4 Nos of breaker by opening and replacing all unserviceable parts, cleaning and tightening the terminals, checking the control circuit wiring, spring charging and interlocking mechanism and ascertaining the RMU healthiness for faults tripping system by using secondary injection method and checking breaker, closing coils, checking the tripping circuit and resetting trip values of relays and checking tripping machanism including servicing of the RMU complete by engaging well experienced technicians as per manufacturer recommendation and all as directed by Engr in Charge. Note: (i)Spare parts shall be measured and paid separately under relevant items. The rated quoted shall deemed to be inclusive of minor spares such as screws, bolts, nuts and all consumables. (ii) Service report to be submitted before payment to be done.
Supply only the following spares suitable for 400 Amps HT RMUs repair work under above schedule items
Bushing 400 Series Bolted Type
Trip coil as per the existing make & type.
Push Button Green/Red W/ Label "O"
Spike Mechanism w/o hex rod
Capacitor Unit, VPIS, 9-15kV without cord
Repair and servicing of HT 11KV LBS of capacity 400 Amps by opening and replacing all unserviceable parts, cleaning and tightening the terminals, checking and greasing of charging mechanism and fault tripping system including servicing of the LBS complete by engaging well experienced technicians as per manufacturer recommendation and all as directed by Engr in Charge. Note: Spare parts shall be measured and paid separately under relevant items. The rated quoted shall deemed to be inclusive of minor spares such as screws, bolts, nuts and all consumables. (ii) Service report to be submitted before payment to be done.
Supply only the following spares suitable for 400 Amps HT Load Breaking Switch repair work under above schedule items
High repturring capacity fuse unit upto 400 Amps as per sample and suitable for housing in Megawin make out door LBS unit
Operating mechanism spring as per sample
Trip Coil suitable for HT LBS Make Meghawin
Fuse holder assembly suitable for 400 Amps HT LBS Make Meghawin
M&L for defect rectification in HT 11 KV cable laid in trenches by locating fault with the help of electronic fault locator machine comprising of surge generator pulse ECHP fault location with high frequency distance calculator etc. including excavation in any type of soil strata exposing the cable fault removal of deteriorated position of cable treating of cable and keeping the same ready for jointing work for cables of size upto 300 Sqmm 3 core complete all as specified and as directed. Notes for Srl. Item No.86 : (i) The contractor shall bring the fault locating equipment at site with in 02 hours of instructions received from Engineer -in- charge and he shall ensure that the fault is rectified with in 24 hours of receipt of intimation from Engineer-in-charge failing which recovery of Rs. 500.00 per hour shall be recovered from the contractors dues w.e.f the time immediately after the expiry of 24 hours duration. (ii) For the purpose of payment one unit of “Each job” shall comprise of detection of faults in a particular stretch of cable which are identified in that particular stretch, irrespective of number of defects / faults in that particular stretch which are detected during fault detection and the contractors unit rate quoted shall be deemed to include for the same and all such defects / faults which are detected in that particular stretch shall be considered as one unit. (iii.) Joints, jointing materials and cable required shall be measured and paid for separately.
Supply and spreading stone aggregate of size not exceeding 40 mm spread and leveled in layers not exceeding 15 cm to a true surface of broken stones for transformer and pole structure area all as directed
Surface dressing in hard / dense soil not exceeding 15 cm deep and clearing all the grass weeds etc in the sub station yards after removing stone aggregate aside all as directed at site including setting / spreading back the aggregate complete all as specified and directed at site. Note:- (i) Additional stone aggregate required shall be measured and paid separately under relevant items of this schedule. (ii) The rate also deemed to be included for labour (iii) All the sub station yards shall be kept clean through out the contract period by removing the grass/weeds as many as times required depending on the growth of the grass.
Forge Engineering & Electricals
RAMESH BABU CO
devan enterprises
eurekaenterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .