Construction of 30 meter wide road under Greater Agra Scheme.
2026_ADAA_1157455_2
07/2026-27
Open Tender
Civil Works
730 days
Agra Development Authority
..
2 documents required · 2 mandatory
₹23,600
Secretary
₹67.6 L
6 Jun 2026
6 Jun 2026
20 Jun 2026
6 Jun 2026
19 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of Earth on kaccha Roads (Cartage of earth 2km. Distance) (124.80-53)+33.33% for kaccha road | 2,844.71 | cum | 95.73 | ₹2,72,324.09 |
| 2 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m ]ead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. (SOR 23-24) | 28,619.09 | cum | 140 | ₹40,06,672.6 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil (DSR 2023 No. 2.8.1) | 58,203.35 | cum | 204.42 | ₹1,18,97,928.81 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (DSR 2023 No. 2.25) | 44,911 | cum | 153.92 | ₹69,12,701.12 |
| 5 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. 1.5 to 3.0 m depth All kinds of soil. (DSR 2023 No. 2.26.1) | 7,145.97 | cum | 99.58 | ₹7,11,595.69 |
| 6 | Close timbering in trenches strutting, shoring and packing (Measurements cavities (wherever required) complete. to be taken of the face area timbered). Depth not exceeding 1.5 m (DSR 2023 No. 2.16.1) | 3,423.55 | sqm | 109.9 | ₹3,76,248.15 |
| 7 | Depth exceeding 1.5 m but not exceeding 3 m (DSR 2023 No. 2.16.2) | 3,041.3 | sqm | 121.96 | ₹3,70,916.95 |
| 8 | Depth exceeding 3 m but not exceeding 4.5 m (DSR 2023 No. 2.16.3) | 680.47 | sqm | 148.94 | ₹1,01,349.2 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-Ill) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) (DSR 2023 No. 4.1.3) | 2,264.66 | Cum | 6,186.98 | ₹1,40,11,406.13 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (DSR 2023 No. 4.1.8) | 3,259.06 | cum | 5,349.81 | ₹1,74,35,351.78 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
T2_30.pdf
Tender Documents • 1.20 MB
BOQ_2169799.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid