| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-Finance | ₹8.2 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹8.3 L+₹10,061 (1.22%)Rejected-Finance BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | ₹8.3 L+₹10,061 (1.22%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹8.7 L+₹44,090 (5.35%)Rejected-Finance | ₹8.7 L+₹44,090 (5.35%) | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | JAI KRISHAN L1 | SURESH KUMAR L2 | MANDEEP KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting soft or hard rock or by chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming / dressing of sides and bed, stacking the excavated soil clear from the edge of excavation and returning the excavated soil after completion of work in 15cm layers when required into plinth, sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil complete in all respect as per direction and to the entire satisfaction of the Engineer-in-Charge. | 449.02 | Cum | 710 ₹3,18,804 Lowest | 720 ₹3,23,294 | 730 ₹3,27,785 |
| 2.00 | P/L cement conc. 1:3:6(1 cement:3 sand:6 graded stone agg. 40mm nominal size) and curing complete excluding cosot of form work and reinforcement of RCC work in foundation and plinth with in all leads and lifts as per direction and to the entire satisfaction of the Engineer-in-charge. | 1.32 | Cum. | 15,210 ₹20,077 Lowest | 15,220 ₹20,090 | 15,240 ₹20,117 |
| 3.00Providing and laying cement concrete 1:1.5:3(1cement:1 approved sand:2approved graded stone agg. 20mm nominal size) & curing complete excluding cost of form work in foundation and plinth: | ||||||
| 3.01 | Foundation | 1.16 | cum | 16,500 ₹19,140 Lowest | 16,520 ₹19,163 | 16,540 ₹19,186 |
| 3.02 | Wall | 2.4 | cum | 16,700 ₹40,080 Lowest | 16,710 ₹40,104 | 16,730 ₹40,152 |
| 4.00 | Providing and laying reinforcement cement concrete 1:2:4(1cement:2sand: 4graded stone aggregate of 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced concrete work including all leads and lifts Suspended floors, roofs, | 0.56 | Cum. | 16,600 ₹9,296 Lowest | 16,700 ₹9,352 | 16,650 ₹9,324 |
| 5.00 | Providing form work with steel plate 3.15 m.m thick welded with angle iron 30x30x5 m.m so as to give a fair finish including centering ,shuttering, propping etc. height of propping and centering below supporting floor to ceiling upto all heights and removal of the same for in-situ reinforced conc.and plain conc.work in :- Flat surfaces such as soffits and suspended floos, roofs, landing and the like. as per direction & to the entire satisfaction of Engineer-in- Charge upto all lead & lifts. | 5.76 | Sqmt | 1,100 ₹6,336 Lowest | 1,120 ₹6,451 | 1,120 ₹6,451 |
| 5.01 | Vertical Walls (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and strining courses etc.from top of foundation level upto floor two level. | 33.6 | Sqmt | 1,100 ₹36,960 Lowest | 1,130 ₹37,968 | 1,140 ₹38,304 |
| 6.00 | Providing tor steel reinforcement for RCC work including bending, binding and placing in position i /c binding wire complete up to floor two level complete in all respectas per direction & to the entire satisfaction of Engineer-in- Charge upto all lead & lifts. | 246.4 | P/Kg | 150 ₹36,960 Lowest | 155 ₹38,192 | 160 ₹39,424 |
| 7.00Laying jointing in Trenches high density polythene pipe for use for buried waterman line and servises and for water supply/Irrigationabove ground both inside and out side building duly ISI marked (IS: 4984- 1995) as ammended up to date)in following grade of materials pressure rating and nominal dia complete with fitting (Earth work to be measured and paid for separetely) | ||||||
Tender Value
₹7.2 L
EMD Value
₹14,326
Closing Date
28 Apr 2026, 11:00 amClosed
Executive Engineer
JSV Division Rohru
SH RR Laying jointing of HDPE pipe of various dia and Co 4Nos RCC Intake chamber
2026_HPIPH_134839_1
No-JSV-RD-AB-Tend/2026-770-820
Open Tender
Civil Works
Item Rate
90 days
Tikkari
tender document
8 documents required · 8 mandatory
₹500
EE Rohru
₹14,326
16 Jul 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting soft or hard rock or by chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming / dressing of sides and bed, stacking the excavated soil clear from the edge of excavation and returning the excavated soil after completion of work in 15cm layers when required into plinth, sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil complete in all respect as per direction and to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| - | P/L cement conc. 1:3:6(1 cement:3 sand:6 graded stone agg. 40mm nominal size) and curing complete excluding cosot of form work and reinforcement of RCC work in foundation and plinth with in all leads and lifts as per direction and to the entire satisfaction of the Engineer-in-charge. | - | Cum. | - | - |
| - | Providing and laying cement concrete 1:1.5:3(1cement:1 approved sand:2approved graded stone agg. 20mm nominal size) & curing complete excluding cost of form work in foundation and plinth: | - | - | - | - |
| - | Foundation | - | cum | - | - |
| - | Wall | - | cum | - | - |
| - | Providing and laying reinforcement cement concrete 1:2:4(1cement:2sand: 4graded stone aggregate of 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced concrete work including all leads and lifts Suspended floors, roofs, | - | Cum. | - | - |
| - | Providing form work with steel plate 3.15 m.m thick welded with angle iron 30x30x5 m.m so as to give a fair finish including centering ,shuttering, propping etc. height of propping and centering below supporting floor to ceiling upto all heights and removal of the same for in-situ reinforced conc.and plain conc.work in :- Flat surfaces such as soffits and suspended floos, roofs, landing and the like. as per direction & to the entire satisfaction of Engineer-in- Charge upto all lead & lifts. | 5.76 | Sqmt | - | - |
| - | Vertical Walls (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and strining courses etc.from top of foundation level upto floor two level. | 33.6 | Sqmt | - | - |
| - | Providing tor steel reinforcement for RCC work including bending, binding and placing in position i /c binding wire complete up to floor two level complete in all respectas per direction & to the entire satisfaction of Engineer-in- Charge upto all lead & lifts. | - | P/Kg | - | - |
| - | Laying jointing in Trenches high density polythene pipe for use for buried waterman line and servises and for water supply/Irrigationabove ground both inside and out side building duly ISI marked (IS: 4984- 1995) as ammended up to date)in following grade of materials pressure rating and nominal dia complete with fitting (Earth work to be measured and paid for separetely) | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.44 MB
F7and8.pdf
Tender Documents • 2.82 MB
termandcondition.pdf
Tender Documents • 0.18 MB
BOQ_199546.xls
BOQ • 0.30 MB
F6.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .