| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 CrAdmitted-Finance | -5.09% | ₹5.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.7 CrAdmitted-Finance 8 INDUSTRIAL AREA PARTAPUR DELHI ROAD MEERUT MEERUT UTTAR PRADESH 250103 UDYAM UP 56 0010830 09AAACJ8106D1ZU R M MII STATUS AS VERIFIED | MEERUT | UTTAR PRADESH | 250103 | -2.50% | ₹5.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹5.8 CrAdmitted-Finance | -1.00% | ₹5.8 Cr | L3 | Admitted-Finance |
| 4 | L4₹6.1 CrAdmitted-Finance | +5.00% | ₹6.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹6.5 CrAdmitted-Finance | +12.00% | ₹6.5 Cr | L5 | Admitted-Finance |
Tender Value
₹5.8 Cr
EMD Value
₹11.6 L
Closing Date
9 Apr 2026, 3:00 pmClosed
General Manager
Office of General Manager, 1/22, Yaman Sahara Estate Gorakhpur
Composite Steel girder (Procurement) fabrication erection launching including proof checking of designs by IIT on pier caps complete job on 04 Lane ROB Between Level Crossing 86B-2 to 550m in East under Barhni Bypass in District Siddharth Nagar
2026_UPSBC_1117901_1
4045/ROB-86B-2/2025-26 Dt. 09/03/2026
Open Tender
Civil Works - Bridges
Percentage
365 days
Siddharth Nagar
Please refer Tender Documents
2 documents required · 2 mandatory
₹20,000
As per Tender Document
₹11.6 L
Gorakhpur
21 Apr 2026
10 Mar 2026
9 Apr 2026
10 Mar 2026
9 Apr 2026
10 Mar 2026
6 Apr 2026
This work includes the supply, fabrication and erection of a welded Composit-type bridge structure of the specified span and width, as per the approved General Arrangement Drawing (GAD), using structure steel, all steel plates used in fabrication shall conform to Fe 490/E350 (IS2062), expect ISBM 600, which shall be of Fe 410B grade, or as per the letest approved RDSO drawings as provided during execution, IRS-B1-2001 (letest amendment) and other relevant IS/IRC codes and specification. No additional payment shall be made to the Contractor upon change in specifications of steel planets as per letest RDSO requirements, if any. The work encompasses the erection and launching of the bridge including bearign using cranes or any other approved method, based on site conditions and shall be carried out on the sub-structure using the contractor's labor, fuel, consumables, machinery, tools & plants, material, lead and lift ensuring full compliance with specifications and directions from the Engineer. Note:- 1- The Contractor shall submit the detailed fabrication/erection drawing and launching scheme along with necessary design calculations for approval to railways before the erection and launching of the girder. 2- The fabrication/vendor must be empanelled/approved by RDSO & the material used by the vendor/fabricator as per RDSO/specification. 3- Temprary supports if any required for the erection/launching shall be erected after the approval of the Engineer. Nothing extra shall be payble on this account. 4- The contractor shall take all safety precaution with the Engineer as per extant rules/guidelines. Nothing extra shall be payable on this account. 5- Notwithstanding the above, the contractor shall be fully resposible for any mishappening that may occur as a result of negligent working of the contracor. The contractor has to take every precautionary measure for the safety of running the train during and after the launching of the girder. 6- The rate includes launching under traffic blocks wherever required. However, the rate does not include the cost of possession of traffic/OHE block. 7- The Block required shall be arranged by the railway at the request of the contractor. The duration of the block shall be as approved by the Engineer. If the block granted is not made available duc to unavoidable reasons, nothing extra/ no compensation shall be paid. 8- However penalties, if any, levied by Indian Railways caused due to any careless working or otherwisc of violation of the Terms and conditions of the track/OHE block, shall be payable by the contractor. 9- The cost of all tests & 3rd Party mandatory Railway inspections & approvals as per the prevailing code for acceptance shall be borne by the contractor. 10- The rate is inclusive of fabrication, transportation, erection, launching & fabrication of all types of bearings, battens, bracings, ties, stiffeners, packing, diaphragms, painting/metalizing, shop rivets/welding, T&F/HSFG bolts, all types of Nut/Bolt, drifts, shop welds, templates, jigs, fixtures, materials, labor, major & minor machines, consumables and any other centering shuttering, launching nose, etc. i.e. quoted rates are from procurement to launching nothing extra shall be paid against quoted rate. 11- The payment shall be made on the theoretical weight of the main components only. No deduction for holes and no addition for rivets bolts/welds etc shall be made. No wastages shall be paid extra. 12- Payment Schedule:- (i) Receipt of material at site: - 40%, (ii) Fabrication of girders- 20% (iii) Erection/Launching- 20% (iv) Completion in all respects-20%
Span CP1S-CP2S-CP3S (18m+36m Span)
Span CP1M-CP2M-CP3M (18m+36m Span)
stage.html
html • 0.04 MB
technical_2077488.pdf
techsummary_2077488.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
ROB86BGIRDER.pdf
Tender Documents • 1.38 MB
BOQ_2077488.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].