| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.6 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹68.3 L+₹74,314.04 (1.10%)Rejected-AOC | L2 | Rejected-AOC Participated bidder |
Tender Value
₹67.9 L
EMD Value
₹45,000
Closing Date
10 Oct 2023, 12:00 pmClosed
EO
Arulmigu Boomieswarar Thirukoil marakkanam
Renovation of sannathis in Arulmigu Boomieswarar Thirukoil marakkanam town and taluk villupuram dt
2023_HRCE_372050_1
01/20.09.2023
Open Tender
Civil Works
Lump-sum
180 days
Marakanam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹45,000
Yes
5 Mar 2024
21 Sept 2023
10 Oct 2023
22 Sept 2023
10 Oct 2023
22 Sept 2023
Amount
Providing Scaffolding for vimanam raja gopuram with Casurnia post non flammble wherever necessary for main form work and by providing non flammabel as covering the areas & plat form for inspection etc all complete. (ht upto 25'-0")
Providing Scaffolding for vimanam raja gopuram with Casurnia post non flammble wherever necessary for main form work and by providing non flammabel as covering the areas & plat form for inspection etc all complete. (ht upto 15'-0")
Providing vargapoochu over the core walls of vimanams/Gopurams,with LIME Mortar 1:1.5 complete including Shaping the mukhapathram, mahanasi, koodu all ornamental works to proper shape by embedding broken bricks of shaped/chiseled bricks , rough plastering with LIME Mortar 1:1.5 and finshing with final ornamental plastering nayam theervani including cost and conveyance of all materials, labour there fore lifting of materials, all working in heights curing with water etc complete including all extra for folding and including clearing from the vimanams/gopurams 100 sft superficial area for kalkaram.
Brick work in Lime mortar 1:2 using country bricks ( 83/4"*41/4"*23/4") size for the following inculding curing etc. complete complying with std. specification Upto basement
Plastering with lime mortar 1:1.5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Painting with colour (eagavarnam) good emulsion paints complete for the vimanams/gopurams,including cost and conveyance of all materials , labours charges including artist painter, working in heights, lifting of materials,cost of brushes etc, complete
Removal of the ceramic from floor and dadooing from wall tiles away from site all labour charges etc complete the std specification.,
Removal of the modern brick wall in cement mortor awar from all labour charges etc complete the std specification.,
Removal of the modern brick wall in lime mortor awar from all labour charges etc complete the std specification.,,
Restoration by providing water wash removal of enmael paint (Combination of gastic soda and low preasurre water with little acid) are used for removel of enamel on stone and oil smudge) and approrimats methodology to restore the originalities of the existing granite structure inclusive of hire charges scaffolding arrangements conveyance charges for tools & plants and machinaries to the workship spot and cleaning the site after completion of work etc
Pointing with Lime mortar 1:1.5 ( one of lime and one and half of sand) including all labour charges, tools and plants etc complete compling the std specification.,
Removing the Cement Concrete flooring away from site etc complete.
Providing cutstone flooring machine cutting edges 600X600mm not less than 100mm thick top surfaces dressed and pointing lime mortor including all labour charges etc complete.,
Dressing and pointing lime mortor including all labour charges etc complete., (Existing flooring)
Cement concrete 1:2:4 mix using 10-12mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and fixing teak wood temple type including all materials, labour charges for manufacturing and fixing I position including all furniture fittings etc complete with std specifications.
Painting new wood work with good quality enamel paint two coats including priming coat with cost conveyance and labour charges etc complete compling the specification.,
Painting old iron work with good quality paint two coats including cost conveyance and labour charges etc complete..
Removing of the One Course of Pressed Tile Roof finish in cement mortar all labour charges etc complete the std specification.,
Removing the weathering course lime concrete away from site etc complete.,
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over stone slab in the proportion of 32:12.5 and well watering consolidated with wooden beaters to slop including cost and conveyance of materials to site and labour charges etc complete
Plastering with Lime Mortar 1:1.5 (One lime and one and half Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
sub total
R RAJASEKARAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_443679.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .