Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.5 L+₹7,725.80 (1.04%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹7.5 L
EMD Value
₹15,000
Closing Date
8 Sept 2026, 6:00 pmClosed
Er. Sanjeev Sharma
XEN PWD Akhnoor
BOQ
2026_PWDJK_322543_2
e-NIT No. 48 of 2026-27 Dated 27-08-2026
Open Tender
Civil Works
Percentage
30 days
Akhnoor
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
XEN PWd Akhnoor
₹15,000
11 Sept 2026
28 Aug 2026
9 Sept 2026
28 Aug 2026
8 Sept 2026
28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and digging carrying by lorry,river bed material mixed with coarse sand and round nallah shingle 75mm as per lines,cross sections,grade and camber including watering and consolidation in layers with 8-10 ton power roller compacted.Finished work including material and labour | 18 | cum | 350 | ₹6,300 |
| 2Providing and laying water bound macadam wuth specified stone aggregate,stone screening and binding material,including sorting spreading to template and consolidation with power road roller 8 to 10 tonne capacity | |||||
| 2.01 | Base course with 63mm to 45mm size including stone screening 13.2mm size(150mm thick)(finished work including material and labour) | 6.2 | cum | 2,237.7 | ₹13,873.74 |
| 2.02 | Base course with 53mm to 22.4mm size including stone screening 11.2mm size(75mm thick)(finished work including material and labour) | 17.44 | cum | 2,327.65 | ₹40,588.4 |
| 3Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. | |||||
| 3.01 | On WBm Surface | 232 | Sqm | 75.75 | ₹17,574 |
| 3.02 | on BT Surface | 1,302 | Sqm | 56.1 | ₹73,042.2 |
| 4 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG-30 with no solvent | 1,534.5 | sqm. | 268.15 | ₹4,11,476.18 |
| 5 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-30 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete | 1,534.5 | sqm. | 102.85 | ₹1,57,823.32 |
| 6 | Labour Engaged for dressing of berms and removal of mulba from sides and disposal | 16 | No | 553 | ₹8,848 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1082244.xls
BOQ • 0.23 MB
Scan.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .