| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.1 LAccepted-Finance MOH SHER MOHAMMAD PILIBHIT | PILIBHIT | UTTAR PRADESH | 262001 | ₹3.1 L | L2 | Accepted-Finance L2 |
| 3 | L3₹3.1 LAccepted-Finance | ₹3.1 L | L3 | Accepted-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
26 Dec 2025, 2:00 pmClosed
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
Construction Of Radiator Foundation and Related Civil Works at 220 KV S/S Payagipur, Sultanpur
2025_UPCTL_1099147_1
79/ECTC(L)/2025-26
Open Tender
Civil Works
30 days
SE ECTC SLDC Campus UPPTCL
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Superintending Engineer, E.C.T.C. Lucknow
₹7,000
23 Jan 2026
15 Dec 2025
27 Dec 2025
15 Dec 2025
26 Dec 2025
15 Dec 2025
Construction Of Radiator Foundation and Related Civil Works at 220 KV S/S Payagipur, Sultanpur
Bill of Quantity
Total Rs.
Conditions
The quantities in BOQ are tentative and may vary to any extent or deleted during execution as per actual approved lay out plan & site condition.
All civil work shall be executed according to the approved drawings of UPPTCL.
Pozzlona Portland cement confirming to IS 1489 (Part 1) 1991 of approved quality like ACC,Ultra-Tech, Birla or equi. Shall only be used.
Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerance shall be measured at actual weight.
In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor.
Labor Cess, Royalty and all other taxs will be the liability of the firm/contractor, only GST will be paid by the department.
The firm should observe the work site before participating in the tender.
All work will be done according to UPPWD/UPPTCL specification or as per direction by the Engineer Incharge.
Test of all the construction materials shall be done by the contractor at their own cost from the lab approved by NABL as per direction Engineer Incharege .In case of unsatisfactory test result the dismanteling and reconstruction of structure shall be done by the contractor at their own cost.
During the work, the entire responsibility of protecting the human power (labor, mason etc.) appointed at the construction site will be of the firm/contractor and the entire responsibility of any untoward incident will be of the firm/contractor.
For the construction JCB Machine etc will be taken to switch yard only with the written permission of the related JE (Civil)/SDO (Civil). In case of any accident the entire responsibility of the damage will be of the Contractor.
Dismantling of Brick works the material shall be recoverd 60% as bricks and 30% as Brick Bats that material shall be property of the contractor recovered at prevailing/ pertaining SOR.
The amount of scrap steel recovered from dismantling shall be issued to contractor/firm at the rate1/3rd of rates in prevailing/ pertaining SOR.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_2024732.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid