Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹59,845.50Admitted-Finance | -37.51% | ₹59,845.50 | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
15 May 2026, 4:00 pmClosed
Executive Engineer
PWD RnB Division Bhaderwah
STAGE FOR Approach with Bridges on Jathi Nallah and Chilli Nallah, Sanai to Khellani link road, Terya Bus Stand to Chandi Mata Mandir, Tantryapura to Droundi link road, Thalasara Malothi link road Km 1st RD (0) to Km 2nd RD (625) (3rd Call)
2026_PWDJK_309632_3
e-NIT No. 22 of 2026-27 Dt. 09-05-2026
Open Tender
Civil Works
365 days
Bhaderwah
These documents are to be submitted as non-sensitive document from my document area of bidder
3 documents required · 3 mandatory
₹600
Executive Engineer
₹30,000
25 May 2026
9 May 2026
16 May 2026
9 May 2026
15 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Slip Clearance | |||||
| 1.01 | In ordinary soils | - | Cum | - | - |
| 1.02 | In soils; mixed with moorum/Kankar/
shingle/ boulders; | - | Cum | 1 | - |
| 1.03 | In soils; mixed with Decomposed Rocks; by blasting or any other means | - | Cum | 1 | - |
| 1.04 | In medium hard rocks ; by blasting | - | Cum | 1 | - |
| 1.05 | In hard rocks; by blasting | - | Cum | 1 | - |
| 2Snow Clearance | |||||
| 2.01 | Clearing snow (with frost) from Roads, manually using picks and shovels; snow depth upto 150 mm | - | Sqm | - | - |
| 2.02 | Snow Clearance by Mechanical Means using Machines as specified or equivalent Snow Plough 4WD 90 BHP (Trucks) | - | Cum | 1 | - |
| 3Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms including getting out excavated earth and disposal of surplus excavated earth as directed, with in a lead of 50 metres. | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_1002246.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid