Loading…
Loading…
Tender Value
₹52.2 Cr
EMD Value
₹1.0 Cr
Closing Date
2 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (WMS)
ESTIMATE
13 conditions · 2 needing a document upload
As per Tender Document
As per Tender Document.
7 conditions · 2 needing a document upload
As per Tender Document.
As per Tender Document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Annual Maintenance Contract for Axle mounted Disc Brake System of LHB Coaches (Sona BLW Precision Forgings Limited formerly known as Escort Kubota Ltd.).
WR-PL-ME-EST-644844
WR-PL-ME-EST-644844
Single
Works - General
24 Months
Mumbai, Maharashtra
₹0
₹1.0 Cr
2 Jun 2026
7 May 2026
19 May 2026
22 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 31,34,08,791.78 | ||
| — | — | — | 10,22,57,129.12 | ||
| EOG COACHES - Material cost of must change kit for Valves as per Annexure - B1 during SSII (M36) / SS III (M72) schedule [for (standard Panel Rev-0) (or) (Modified Panel Rev-1)] - 3rd year, Air Brake Schedule | Coach Set 311759.54 | 328.00 | — | — | |
| — | — | — | 2,94,93,406.16 | ||
| POWER CAR COACHES - Material cost of Must Change Kit for Valves as per Annexure - B2 during SS-II (M36) / SS-III (M72) schedule [for (Standard Panel Rev-0) (or) (Modified Panel Rev-1)] - 3rd year Air Brake Schedule | Coach Set 313759.64 | 94.00 | — | — | |
| — | — | — | 12,44,85,541.96 | ||
| EOG COACHES - Material cost of must change kit for Caliper as Per Annexure - C1 during SS - III (M-72) schedule - 6th year Air Brake Schedule | Coach Set 581708.14 | 214.00 | — | — | |
| — | — | — | 3,54,84,196.54 | ||
| POWER CAR COACHES - Material cost of must change kit for Caliper as Per Annexure- C2 during SS-III(M-72) schedule - 6th year Air Brake Schedule | Coach Set 581708.14 | 61.00 | — | — | |
| — | — | — | 2,16,88,518 | ||
| FIBA - Material cost of FIBA must change kit - 3 yearly schedule as per Annexure - D - 3rd year FIBA Schedule | Coach Set | 300.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TDEscort.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
GCCACS1to10_merged.pdf
ATTACHMENT
AmendmenttoCS10.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .