Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical PHYANG LEH | LEH LADAKH | LADAKH | 194101 | Accepted-Technical ADMITEED |
| 2 | Accepted-Technical | Accepted-Technical ADMITEED |
| 3 | Accepted-Technical | Accepted-Technical ADMITEED |
| 4 | Accepted-Technical | Accepted-Technical ADMITEED |
| 5 | Accepted-Technical R O DISKIT | LEH LADAKH | LADAKH | 194101 | Accepted-Technical ADMITEED |
Tender Value
₹17.6 L
EMD Value
₹35,240
Closing Date
28 May 2026, 4:00 pmClosed
Executive Engineer PWD Rnb division Leh
Office of the Executive Engineer Rnb division Leh
Construction of link road from main road to Chumikchan Nimoo ( Under Capex )
2026_PWD_18910_1
E Tender 17 of R and B Division Leh
Open Tender
Civil Works - Others
Percentage
75 days
Leh
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
Office of the Executive Engineer Rnb division Leh
₹35,240
4 Jun 2026
8 May 2026
30 May 2026
8 May 2026
28 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthworkinexcavationbymechanicalmeans (Hydraulicexcavator)overareas
(exceeding30cmindepth,1.5minwidthaswellas10sqmonplan) including
gettingoutanddisposalofexcavatedearthleadupto50mandliftupto1.5m,as
directed by Engineer-in-charge.
All kinds of soil | 695.76 | cum | 208.42 | ₹1,45,010.3 |
| - | Ordinary rock | 463.84 | cum | 383.88 | ₹1,78,058.9 |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundationtrenchesordrains(notexceeding1.5minwidthor10sqmonplan),
includingdressingof sidesandrammingofbottoms, liftupto1.5m, including
gettingouttheexcavatedsoilanddisposalofsurplusexcavatedsoilasdirected,
within a lead of 50 m.
All kinds of soil. | 100.1 | Cum | 278.09 | ₹27,836.81 |
| - | Dry stone pitching ( any thickness) including cost ofstones . On Horizontal . | 21.75 | Cum | 1,258.05 | ₹27,362.59 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 14.5 | cum | 5,725.33 | ₹83,017.29 |
| - | Randomrubblemasonrywithhard stone in foundation andplinth including
levellingupwithcementconcrete1:6:12(1cement :6coarsesand:12graded
stone aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand) | 122.4 | cum | 5,730.38 | ₹7,01,398.51 |
| - | Random rubble masonry with hard stone laid dry in foundation, plinth &
walls Laid without bond stone | 81.6 | cum | 4,010.89 | ₹3,27,288.62 |
| - | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). | 45 | sqm | 486.19 | ₹21,878.55 |
| - | Filling availableexcavatedearth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm indepth, consolidating each
deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 695.76 | Cum | 220.4 | ₹1,53,345.5 |
| - | Carriage of material from source to site of work by M.T Cement & steel an avg. lead 45 Km | - | MT | 545.02 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_45157.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .