EXECUTIVE ENGINEER (SDW)-II
S.T.P. OKHLA MATHURA ROAD NEW DELHI-110025
Renovation/ Strengthening of Primary Settling Tank No. 2 and other allied Works at 45 MGD STP Okhla.
2021_DJB_210539_12
NIT No-11 EE (SDW) II/ (21-22)
Open Tender
Electrical Works
Works
45 days
S.T.P. OKHLA MATHURA ROAD NEW DELHI-110025
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c.50448339804
Yes
25 Nov 2021
1 Nov 2021
8 Nov 2021
1 Nov 2021
8 Nov 2021
1 Nov 2021
Repairing/Strengthening of 15 MGD Capacity primary Settling Tank No. 2, STP Okhla, by carrying out the works as under: -including all the required works, materials, arrangements, tools & tackles, workmanship, safety equipments as per NHRC\NGT\ DPCC etc guidelines and as per site requirement, remodelling all the damages up to standard if occurred any complete in all respect as per requirement satisfactorily. Isolating the PST from inflowing and out flowing channel by closing sluice gate and providing gunny bags to ensure no flow in the PST. Dewatering the stagnant water from the PST with the help of submersible pump and D.G. set. Cleaning the site manually for execution the work.
Dismantling of motor, Primary gear box and other mechanical fixtures from the top of centre mechanism and shifting to workable safe place.
Dismantling all the gears in turn table after removing the Brocken bearings form the gears and wheels
Making temporary platform in the PST around the central post as per site requirement.
Dismantling of drive head by cutting nut & bolts with the help of gas cutter and dismantling the shaft & complete transmission unit.
Dismantling the all worn out angle iron, scrappers, and damaged portion of the drum by cutting nut & bolt with the help of Gas cutter, man power, and labour as per site requirement / strategy.
Providing a set of sleeve fabricated as per sample in terms of shape and size
Replacement the wheel & gears as per sample 6 Nos. (ist stage 2 nos. Second stage 2 Nos. Third stage 2 nos. of turn table and oil seals as per required size on the site.
Fabrication & fixing of the cross section which coupled the main gear to primary gear box
Providing & Fixing of bearings Numbers. (1) 22218 – 2 Nos., (2) 22219 – 4 Nos., (3) 6411 – 2 Nos., (4) 6312 – 2 Nos., (5) 6205 – 2 Nos., (6) 6209 – 2 Nos.
Providing of set of scrapper arms comprising of arms, made out of M.S. angle iron size 65 x 65 x 8mm, 20mtrs., 75x75x8mm, 30mtrs. 50x50x6mm, 21mtrs. aprx. and Vertical channel size 150x70x6mm, 8 mtrs. Appx. of main arm as per sample and manufacturers standard.
Fixing of set of scrapper arms comprising of arms by welding & providing nut bolt etc as per requirement at site.
Repairing of damaged vertical structure of central drum, M.S. angle iron of size 150x150xx8mm (Approx. 10Mtr) and 70x70x8mm (Approx. 25mtr). By welding & providing nut bolt etc as per requirement at site.
Repairing of centre drum by patch work using 5mm thick M.S. sheets and homogenous electric and welding i/c replacement of the damaged stiffeners of the drum with the help of electric welding by providing of size 50x8mm M.S. flat as per site requirement. The job also includes replacement of the damaged portion of the drum and restringing with 50x50X8mm angle iron fixed on the top and bottom of the drum with the help of electric welding.
Providing of SS Tie Rod of size 5/8” dia x length 5 Mtrs. Apprx.
Fixing of above Tie Rod at both side of central drum for holding the scrapper arms with adjustment assembly.
Alignment of the complete structure after assembling fixing the above material with the provision of weight to align the same.
Painting: - Providing of Red Oxide Metal primer Black Enamelled. Painting the complete structure after removing the rust with the wire brush and putting one coat of epoxy primer and two coats of epoxy paint etc. Make: - Asian/Nerloc/Burger.
Replace of Gear Oil. Servo-40 in the central mechanism as well in reduction gear boxes.
Testing and commissioning of complete PST with all auxiliary material as lowering/ lifting tools and tackles.
DEEPAK ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .