| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹11.3 L+₹56,791.40 (5.27%)Rejected-Finance | L2 | Rejected-Finance Rejected by Tender Committee due to L2 Bidder | |
| 3 | L3₹12.3 L+₹1.5 L (14.2%)Rejected-Finance A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | L3 | Rejected-Finance Rejected by Tender Committee due to L3 Bidder | |
| 4 | L4₹12.9 L+₹2.1 L (19.4%)Rejected-Finance CAMP BIRSINGHPUR PALI DIST UMARIA MP PIN 484555 | BIRSINGHPUR PALI | UMARIA | MP | 484555 | L4 | Rejected-Finance Rejected by Tender Committee due to L4 Bidder | |
| 5 | L5₹13.2 L+₹2.4 L (22.6%)Rejected-Finance | L5 | Rejected-Finance Rejected by Tender Committee due to L5 Bidder |
Tender Value
₹14.9 L
EMD Value
₹18,700
Closing Date
7 Jul 2022, 5:00 pmClosed
Area Survey Officer Johilla Area
Area Survey Dept GM Office Johilla Area Nowrozabad Dist Umaria MP
Construction of RCC flooring in marching route 16LE drift of CM for depillaring of CN-9, CM-10 and CM-11 panels at Vindhya UG Mine, Pinoura Sub Area of Johilla Area
2022_SECL_247637_1
SECL/GM/JOH/Survey/ eTender/22-23/03 dt-23/06/2022
Open Tender
Civil Works - Others
Item Rate
90 days
Vindhya UG Mine
3 documents required · 3 mandatory
₹18,700
25 Aug 2022
23 Jun 2022
9 Jul 2022
23 Jun 2022
7 Jul 2022
23 Jun 2022
23 Jun 2022 - 2 Jul 2022
Amount
Item Description/ Heading
Cleaning/removal of debris /stone from UG galleries and stacking within 50 Mtr. Distance.
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Sand :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Stone aggregate below 40mm nominal size :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Cement :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Steel :
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars
Centring and shuttering including strutting, propping etc. and removal of form for : walls (any thickness) including attached plisters, buttresses, plinth and string courses etc.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforecement- all work upto plinth level : 1:2:4 (1 Cement : 2 Coarse sand : 4 Graded stone aggregate 20 mm nominal size)
Material rate : For Sand
Material rate : For Metal (20mm)
Material rate : For Cement : (50 Kg./Bag)
Material rate : For Cold twisted bars
Total impact of GST for the purpose of CTC
G SASI KUMAR
ABADH KISHOR SHARMA
RAJENDRA KUMAR MISHRA
S.V. KURUP
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_255853.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .