Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC BHIWANI HARYANA | BHIWANI | HARYANA | 127021 | ₹1.7 L | L1 | Accepted-AOC ok |
| 2 | L2₹1.9 L+₹22,503.60 (13.1%)Rejected-Finance 2214 URBAN ESTATE JIND | JIND | HARYANA | 126101 | ₹1.9 L+₹22,503.60 (13.1%) | L2 | Rejected-Finance ok |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
6 Jul 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 1 Hissar
A/mtc estimate of sewerage scheme in sector-6,7,8,9 and U/E, Jind.2025-2026.
2026_HBC_532477_1
2026F18D8C02 0ED8 4FDF 8308 14574A2077A8259HSV
Open Tender
Civil Works
Works
60 days
Jind
Laying of HDPE 630 mm dia pipe in place of damaged external sewer line including construction of new manhole in Sector 6, 7, 8 and 9 Jind and all other works contingent thereto. (Including One year maintenance and defect liability period free
2 documents required · 2 mandatory
₹250
Yes
₹4,000
Yes
29 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
6 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening | 6 | Each | 1,058 | ₹6,348 |
| 2 | [21.99.11]`Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipes of PE-100 grade and PN-10 for sewer application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE `Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer.
Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment.` 11. 630 mm Outside Dia | 250 | Per Metre | 102 | ₹25,500 |
| 3 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | 1,270 | cum | 83 | ₹1,05,410 |
| 4 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 1.39 | cum | 2,442 | ₹3,394.38 |
| 5 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 2.12 | cum | 4,374 | ₹9,272.88 |
| 6 | [6.29.2]Centering and shuttering including strutting, propping etc. and removal of form work for : 2. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 5.43 | Sqm | 282 | ₹1,531.26 |
| 7 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 190.8 | Kg. | 66 | ₹12,592.8 |
| 8 | [7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 8.09 | cum | 4,404 | ₹35,628.36 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_611541.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .