Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 414 PURBI COMPLEX A T ROAD DIST KAMRUP M GUWAHATI ASSAM | KAMRUP | ASSAM | 781030 | Accepted-Technical Passed |
| 2 | Accepted-Technical | Accepted-Technical Passed |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
27 Feb 2026, 1:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
the Addl. Chief Engineer, PWD, BTC
O/o the Addl. Chief Engineer, PWD, BTC
Construction of Tourism Complex at Kuklung under Boro Bazar T.D. Block. TN_114_01
2026_BTC_50876_1
No.ACE-106/PWD/IFB/PT-I/23-24
Open Tender
Civil Works - Building
Item Rate
365 days
Chirang
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,900
₹2.9 L
Yes
16 Oct 2026
6 Feb 2026
27 Feb 2026
6 Feb 2026
27 Feb 2026
6 Feb 2026
6 Feb 2026 - 27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Works
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 187.72 | Cum | - | - |
| 2 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :
16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 84.24 | Sqm | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.32 | Cum | - | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.1 Mild steel and Medium Tensile steel bars | 14,135.45 | Kg | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 118.5 | Sqm | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 110.88 | Sqm | - | - |
| 7 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 362.96 | Sqm | - | - |
| 8 | Suspended floors, roofs, landings, balconies and access platform | 334.37 | Sqm | - | - |
| 9 | Stairs, (excluding landings) except spiral-staircases | 21.1 | Sqm | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 65.74 | Cum | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
SBDBldg114.pdf
Tender Documents • 2.90 MB
BOQ_81003.xls
BOQ • 0.30 MB
FOB.pdf
Additional Documents • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .