Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹50.1 L+₹2.9 L (6.25%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹52.0 L+₹4.9 L (10.5%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹58.9 L
EMD Value
₹5.9 L
Closing Date
27 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EEMI CHITRAKOOT
EEMI BEDI PULIYA KARWI CHITRAKOOT
Construction of Checkdam cum Rapta Kharaundh, Block Manikpur, Dist-Chitrakoot.
2026_UPMID_1198733_3
26/EEMI/2026-27/DT. 09.10.206
Open Tender
Civil Works - Water Works
Percentage
90 days
EEMI CHITRAKOOT
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,354
EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION
₹5.9 L
Yes
EEMI BEDI PULIYA KARWI CHITRAKOOT
23 Nov 2026
21 Oct 2026
28 Oct 2026
21 Oct 2026
27 Oct 2026
21 Oct 2026
21 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Item Description | |||||
| 1.1 | Earth Work excavation in mar, kabar, ranker, kankar mixed dry soil i/c lead 30 m and lift 1.5 0.00 to 0.00 | 500.91 | Cum | 95.2 | ₹47,686.63 |
| 1.2 | As in Item no. 01 but lift 1.50 to 3.00 | 333.94 | Cum | 107.7 | ₹35,965.34 |
| 2 | Earth Work excavation in mar, ranker and kankar mixed in saturated soil below bed level. | 248.75 | Cum | 103.1 | ₹25,646.13 |
| 3 | Removal of slush from nala bed | 106.61 | Cum | 258.3 | ₹27,537.36 |
| 4 | C.C. with 1:3:6 cement sand and 25 to 50 mm stone ballast including the cost of materials, labour etc. for proper complition of works | 329.75 | Cum | 4,890 | ₹16,12,477.5 |
| 5 | R.C.R. Stone masonary in 1:4 cement sand mortar including the cost of materials labour etc. for proper complition of works | 277.03 | Cum | 6,222 | ₹17,23,680.66 |
| 6 | R.R. stone masonary work 1:4 cement sand mortar including the cost of materials labour etc. for proper complition of works. | 262.86 | Cum | 5,324 | ₹13,99,466.64 |
| 7 | C.C. with 1:2:4 cement sand and 10 to 20 mm stone grit including the cost of materials labour etc. for proper complition of works. | 85.4 | Cum | 5,794 | ₹4,94,807.6 |
| 8 | Raised struck pointing with 1:2 cement sand mortar including the cost of materials labour etc. for proper complition of works. | 62.39 | Sqm | 151 | ₹9,420.89 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.20 MB
BOQ_2265382.xls
BOQ • 0.33 MB
TENDERDOCs.pdf
Tender Documents • 1.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .