Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹2.0 Cr
EMD Value
₹2.5 L
Closing Date
30 Dec 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Provision of (i)Dual Detection by Commissioning of Track circuit in Joint Line between RKSN-RKSN West/Outer. (ii)Auto Media Change over System for SSDACs & UFSBI over Chakradharpur Division.
ST-CKP-OT-25-26-93~SER
ST-CKP-OT-25-26-93
Open
Works - General
12 Months
Mayurbhanj, Odisha
₹0
₹2.5 L
30 Dec 2025
8 Dec 2025
16 Dec 2025
A-Execution(SOR) for (Dual Detection by Commissioning of T/Cct in
B-Material Supply(SOR) for (Dual Detection by Commissioning of T/Cct
C-Execution(SOR) for (Auto Media Change over system for SSDACs &
D-Material Supply(SOR) for (Auto Media Change over system for
D1-Material Supply(Non-SOR) for (Auto Media Change over system for
Item- 1 Details of Schedule 'A' are given below: -
S No. Item Description of Item Unit Qty Rate Amount
1 01 Excavation of trench in all kinds of soils Kilometre 1.00 79869.00 79869.00
including soft rocky area and clearing of roots
of trees, rocks, bushes, ballast &
reconditioning etc., including bailing out water
and disposal of extra soil including back filling
with excavated earth and ramming of
trenches after cable laying for the following
depths and widths as specified in Technical
Circular No. 2 of 1988 & 01/2010 issued by
CSTE/SER or any other latest guidelines. Note:
In case, trenches are other than prescribed
depth & width, Proportionate payment shall
be released. (i) Depth 1.0 meter, Width 0.3
2 02 Excavation of trench in all kinds of soils Kilometre 1.00 95893.00 95893.00
including soft rocky area and clearing of roots
of trees, rocks, bushes, ballast &
reconditioning etc., including bailing out water
and disposal of extra soil including back filling
with excavated earth and ramming of
trenches after cable laying for the following
depths and widths as specified in Technical
Circular No. 2 of 1988 & 01/2010 issued by
CSTE/SER or any other latest guidelines. Note:
In case, trenches are other than prescribed
depth & width, Proportionate payment shall
be released. (i) Depth 1.2 meter, Width 0.5
3 03 Laying of S&T Cables (Signal/Quad/Power) in Kilometre 6.00 20239.00 121434.00
the excavated trench to Drawing No.
CON/SK/T/5 or latest. Supply and
transportation of 'U' clamps, anchoring of
cable at every 10 metres interval with 'U'
clamp on trench to Drawing No. CSTE/CON
/CABLES/81 or latest. Supply, transportation,
and placing of cable demarcating led belt to
Drawing No. CON/SK/T/6 or latest punched at
an interval of 30 metres and wrapped round
each cable throughout the cable route and
also at every track/Road/ platform crossing as
above specified in Technical Circular No.
2/1988 & 01/2010 issued by CSTE/SER or as
per latest guidelines and guarding the cables.
Collecting empty drums with left over cable
and to be returned to the stores of stock
holder. Note: Cables will be meggered before
& after its laying by contractor under
supervision of Railway representative &
Contractor will submit their reports.
CKP-DIVN- S AND T/SOUTH EASTERN RLY
4 04 Transportation of cables in rolls with or Drum-Km 6.00 2328.00 13968.00
without wooden drums (S and T Cables) from
concerned store/Central Store(CKP) to the site
of works. Note: The unit Drum-KM indicates
Drum X length of cable in that drum. It
doesn't have any significance over the
distance it has to be carried for execution of
cast/cast in -situ RCC cable ducts including
top cover as per RDSO drawing No.
SDO/S&T/RCC DUCT/1018/1 & 2, dated
29.5.23 or latest. Note- The rate is inclusive of
all type of transportation including labour till
it is placed into trenches. The laying of cables
shall be paid separately fulfilling the laying
procedure as per above drawings. (Inspection
by representative of Sr. DSTE/CKP)
6 06 Excavation of trench in all kinds of soils Metre 84.00 691.00 58044.00
including soft rocky area and clearing of roots
of trees, rocks etc. to a depth of 1 metre and
width 0.3 mtr. Track/ Pucca road/Platform
crossing/ Level crossing as per SEM Drawing
No.15-D5 including supply, transportation and
laying of DWC pipes (full) with collar(for
jointing pipes) Inner diameter/Outer
diameter:103mm/120mm to Specification
No.14830 (Part-2):2001 as per SEM Drawing
No. 15-D4 and drawing of cable through DWC
pipes with collar(for jointing pipes) including
back filling and ramming after cable laying as
specified in Tech. Circular No. 2 of 1988 &
01/2010 issued by CSTE/SER for S&T Cables
or any latest guidelines. This includes
repairing and plastering of Platform/Pucca
road after cable laying.
7 07 Chase cutting and smoothening of inside Metre 20.00 146.00 2920.00
surface of sizes 80 mm deep and 170 mm
width for single/multiple cable chase in
concrete or hard rocks or platform or
cemented floor. Note: Sundries materials such
as sand, cement, etc. shall be supplied by the
contractor at site and to be inspected by
Railway Site Engineer before placing in the
chase. Note: In case, chase cutting &
smoothening are other than prescribed depth
& width, Proportionate payment shall be
CKP-DIVN- S AND T/SOUTH EASTERN RLY
8 08 Alterations/modifications works on existing Numbers 3.00 21225.00 63675.00
relay rack (Q-series/ Composite Relay
Racks)/Cable Termination Racks (CTR)
including works of installation, wiring,
termination, testing and commissioning. The
work includes fixing of aluminium/steel/M. S
ladder along with supply as per requirement
to accommodate additional plug board,
relays, terminals/blocks, terminals, tag blocks,
fuses, transformers, bus bars, TW
shelves/strips etc. in the existing relay
racks/CTR's, 6 mm Hylam sheets of required
length for writing terminal description etc.
fixing and termination of cables on the relay
racks, CTR's with number embossed ferrules,
bunching of cables with PVC tapes, earthing
of cable armours, covers including painting
and lettering, making anti tilting arrangement.
Note:- a) Relay rack (Q-series/ Composite
Relay Racks) : Payments for alterations in
existing relays upto 20 nos. relays & above 20
nos. shall be made 50% & 100% respectively.
b) Cable Termination Racks (CTR):- Payments
for alterations in existing CTR upto 120 cores
& above 120 nos. cores shall be made 50% &
100% respectively.
9 09 HDD: In case of short stretches (less than 100 Metre 150.00 1964.00 294600.00
m in single stretch) Micro Tunnelling through
Horizontal directional drilling (HDD) machine,
preparation of sites, boring and laying of
HDPE pipes of size (Outer/Inner diameter=
50mm/42mm) for crossing of S&T cable
through HDPE pipe at bridges/culverts/track
crossing/pucca road crossing. Boring trench
shall be minimum 3 (three) meter below the
surface/river bed and minimum 1 m at
track/road/pucca road crossing area etc. This
includes supply of permanently lubricated
HDPE telecom ducts of equal length as per
Specification No. RDSO/SPN/TC/45/2013
REVISION 2.0 with latest amendments. For
each HDPE duct the following items are to be
supplied as per requirement (a) End plug, (b)
Cable sealing plugs, (c) Plastic coupler slip
fit/push fit type & (d) End plugs to be provided
along with drum. In case the site doesn't
allow to perform as per schedule, written
approval must be obtained from at least site
in-charge officer. Note: The boring profile
should be recorded and submitted for
verification of depth and length of boring. (a)
(Cement: Sand: Stone chips of 25mm nominal
size) for miscellaneous works. It includes
excavation, ramming of CC by using vibrator,
curing and plastering with cement and sand
mixture (aggregate will not exceed beyond
3.8 cm). Note: All materials required for
foundation are to be supplied by the
CKP-DIVN- S AND T/SOUTH EASTERN RLY
11 11 Execution of Full Apparatus Case with earth Numbers 8.00 9147.00 73176.00
excavation for pit, concrete foundation,
surrounding earth work, erection and
installation as per Drawing No. Con/SK/T/8 or
latest and wiring to be done as per SEM
Drawing No.19-D8 or as per direction of site
engineer. Supply and fixing of Hylam sheet
strip of appropriate size of 3 mm or 6 mm as
required with hole for fixing of terminals, fuse
blocks, relay and other accessories for
signal/track circuit, termination of cable with
number embossed ferrules, bunching of
cables with PVC tape, proper soldering of
cable armour with earth catenary wire,
earthing of cable armour as required. Writing
& terminal description including Painting of
the apparatus case inside and outside after
clearing the surface thoroughly and first
coating of anticorrosive paint and subsequent
two coats of Aluminium paint outside and red
oxide inside and lettering etc. This also
includes transportation of 25 mm/12mm
Hylam sheet for shelf or as required and also
includes minor modification in L/Boxes as per
site requirement. The contractor shall supply
4 no. of foundation nuts & bolts of size 22 mm
dia. x 450 mm long with 2 flat spring washers,
with each nut & bolts, sand for filling up cable
pit inside the apparatus case including plaster
and bolts, nuts, screws, MS Clamps for fixing
equipment/cable. Note: - Part payment shall
be released after completion of- (i)
Foundation- 40%, (ii) Erection - 10%, (iii)
Wiring, earthing, testing - 20%, (iv) Painting,
writings - 10%, (v) Plastering, sand filling &
etc. - 10%, (vi) Commissioning - 10%.
12 12 Transportation, installation and charging of Numbers 6.00 405.00 2430.00
2V lead acid type Secondary Cell and
preparation of electrolyte for each cell.
Charging to be done as per OEM's instruction
with uninterrupted power supply in presence
of Railway representative. After charging, it
should be kept at the dedicated location as
per use. Note- If power is not available at site
of work, charging may be done at nearby
location as per convenience of the railway.
This includes transportation of uncharged
cells at the site of charging, supply of acid,
distilled water at the site of charging and
transportation of charged cells back to the
site of work. (a) 2 Volt 80AH.
13 13 Transportation & Fixing of insulated lead wire Numbers 16.00 921.00 14736.00
in track circuits. This includes cutting of
insulated lead wire in two pieces of required
length (one of not less than 3.5 meter. &
another not less than 1.5Mtr.) and eyelet of
suitable diameter is to be crimped at one end
of each wire. The crimped end is to be
connected to the terminals of JB and the other
end to be fixed to Rail with channel pin by
removing existing channel pin etc. Note: All
required sundry materials like channel pin,
eyelet & insulated lead wire shall be supplied
by the contractor.
14 14 Painting of Glued joints with epoxy paint Numbers 6.00 50.00 300.00
including epoxy paint supply. This includes
scraping of old paint & rusts and prima
coating followed by final painting.
CKP-DIVN- S AND T/SOUTH EASTERN RLY
15 15 Excavation of earth pit, placing & fixing of Numbers 8.00 1791.00 14328.00
Earth electrode with construction of cement
enclosure to SEM Drawing No. 19-D6 and
drawl of 6 SWG GI/Copper cable from earth
electrode to goomties/relay
room/cabin/station, etc. and drawl of MS flat
35mm x 6mm for signal post/Location box
shall be used as the case may be, including
fixing at both ends of the wire/MS flat. This
includes transportation of materials. Note 1:
Materials such as charcoals, salt, sal
ammoniac, 6 SWG GI wire, copper lugs with
Steel bolts & nuts etc. shall be supplied by
the contractor. MS flat 35mm x 6mm/Copper
cable shall be supplied by Railway. NOTE 2:
Painting of MS Flat with one coating of Red
Oxide as primer & two coating of
anticorrosive black included in Execution.
16 16 Design and supply of the following drawings Station 1.00 38738.00 38738.00
to office records as per requirement of the
Railways. This includes alteration at different
stages and finally supply of all the drawings
including tracings within 30 days or as
defined in the tender document from the date
of commissioning of the work, otherwise
penalty to be imposed as per tender
document. This includes the following
drawings for each station: (1) Cable layout
plan, (2) Cable corrage plan, (3) Location Hut
drawing, (4) Termination chart of end
goomties and location hut, (5) Traction
bonding plan, (6) Contact Analysis Chart, (7)
SWRD & GWRD, (8) Equipment Layout Plan,
(9) Power Supply arrangement diagram, (10)
Relay Disposition chart, (11) Any other
drawing as found relevant as per site
condition. Office record if online maintenance
is not implemented includes the following: (i)
Battery History book, (ii) Track Circuiting
Register, (iii) Track circuit maintenance
Register, (iv) Cable Meggering Register, (v)
Signal History Register, (vi) LED Register, (vii)
Glued joint/ Block joint Register, (viii) Point
machine Maintenance Register, (ix) Joint
Inspection Register such as P. Way, Electrical
& Signal, (x) Relay Register, (xi) Route
cancellation Register, (xii) Relay Room Key
Register, (xiii) Emergency Point operation
Register, (xiv) Crank Handle Register, (xv)
Emergency Route Cancellation Register, (xvi)
Axle counter reset register, etc. (xvii) Supply
and preparation of SIP where required. Note:-
(i) All the diagram will be made on Auto CAD.
The paper size of wiring diagram will be A-3
or as per IRSEM or as per IRSEM. Soft Copy/
AUTOCAD file of all drawings to be submitted
alongwith paper drawing. Wiring diagram will
be made in 'Black colour'. Alteration to wiring
diagram will be done using 'RED' and 'Green'
colouring scheme. RED = new
equipment/contact to be installed or
commissioned. GREEN = redundant
equipment/ contact to be recovered. (a) Up to
CKP-DIVN- S AND T/SOUTH EASTERN RLY
17 17 Design and supply of the following drawings Station 1.00 77475.00 77475.00
to office records as per requirement of the
Railways. This includes alteration at different
stages and finally supply of all the drawings
including tracings within 30 days or as
defined in the tender document from the date
of commissioning of the work, otherwise
penalty to be imposed as per tender
document. This includes the following
drawings for each station: (1) Cable layout
plan, (2) Cable corrage plan, (3) Location Hut
drawing, (4) Termination chart of end
goomties and location hut, (5) Traction
bonding plan, (6) Contact Analysis Chart, (7)
SWRD & GWRD, (8) Equipment Layout Plan,
(9) Power Supply arrangement diagram, (10)
Relay Disposition chart, (11) Any other
drawing as found relevant as per site
condition. Office record if online maintenance
is not implemented includes the following: (i)
Battery History book, (ii) Track Circuiting
Register, (iii) Track circuit maintenance
Register, (iv) Cable Meggering Register, (v)
Signal History Register, (vi) LED Register, (vii)
Glued joint/ Block joint Register, (viii) Point
machine Maintenance Register, (ix) Joint
Inspection Register such as P. Way, Electrical
& Signal, (x) Relay Register, (xi) Route
cancellation Register, (xii) Relay Room Key
Register, (xiii) Emergency Point operation
Register, (xiv) Crank Handle Register, (xv)
Emergency Route Cancellation Register, (xvi)
Axle counter reset register, etc. (xvii) Supply
and preparation of SIP where required. Note:-
(i) All the diagram will be made on Auto CAD.
The paper size of wiring diagram will be A-3
or as per IRSEM or as per IRSEM. Soft Copy/
AUTOCAD file of all drawings to be submitted
alongwith paper drawing. Wiring diagram will
be made in 'Black colour'. Alteration to wiring
diagram will be done using 'RED' and 'Green'
colouring scheme. RED = new
equipment/contact to be installed or
commissioned. GREEN = redundant
equipment/ contact to be recovered. (a) For
more than 10 line yard.
18 18 Preparation of Station Working Rules (SWR) in Set 2.00 13595.00 27190.00
English on the basis of station working rule
diagram and gate working rule diagram to be
supplied by the contractor. Submission of two
draft copy to railway for checking and
resubmission of draft in three copies for
approval of division after making corrections.
Editable Soft copy to be supplied in pen drive.
19 19 Preparation of Station Working Rules (SWR) in Set 2.00 13595.00 27190.00
Hindi/Regional Language of that station on
the basis of station working rule diagram and
gate working rule diagram to be supplied by
the contractor. Submission of two draft copy
to railway for checking and resubmission of
draft in three copies for approval of division
after making corrections. Editable Soft copy to
be supplied in pen drive.
CKP-DIVN- S AND T/SOUTH EASTERN RLY
20 20 Designing and Plotting of Signalling Per SIP 2.00 28072.00 56144.00
Interlocking Plan(SIP) in AUTOCAD. Two
copies of prints with soft copy will be
submitted to Railway for checking. If
alterations are suggested/proposed by
Railways then again two copies of prints will
be submitted for advance approval after
carrying out all the alterations as
suggested/proposed by the Railways.
Tracings will be submitted for all the diagrams
mentioned above for the purpose of approval
by Railway prior to commissioning of station.
21 21 Mechanised Drilling/Micro Tunnelling under Metre 30.00 2215.00 66450.00
important/ busy metal/concrete road/Railway
track and laying of GI pipe including supply
(make: TATA/ Jindal or better) of min. 75mm
inner diameter Grade Medium with Spec. No.
IS- 1239, Pt-1, 2004 including supply, Boring
and pulling cable upto 110mm dia. at a depth
of min. 1 meter as per site condition. This also
includes reinstatement of the surface to the
original state.
22 22 Alteration/modification in existing location Numbers 3.00 2734.00 8202.00
boxes, includes fixing/Removal or both the
equipment, cable insertion, termination,
wiring, testing & commissioning, two coat
painting, lettering to suit the circuits as per
approved wiring diagram. This includes filling
with sand and plastering the same. Note: All
the sundry materials such as paint, sand,
cement, screws etc to be supplied by the
Cables/tail cables) at location boxes, cable Conductor
termination rack in relay room, station
building, etc. The item includes dressing of
cables and wires with dressing threads as per
standard practice. All material required for
this item will be supplied by contractor.
24 24 Physical tracing and opening/locating of Metre 80.00 257.00 20560.00
existing working cables by precision digging
for diversion of cables in connection with
cable clearance for engineering earth work or
for utility shifting without interfering the
circuits as per the advice of Railway site
Engineer-in-charge.
25 25 Removal of normally 13m Rail in the way of Numbers 10.00 117.00 1170.00
cable route trench, signal/location box
foundation, track crossing etc. In case of less
or more than 13 m, proportionate payment to
be done. These obstructions will be removed
by the contractor for ensuring proper
execution of related works.
26 26 Removal of PSC/Wooden/Steel sleeper in the Numbers 10.00 118.00 1180.00
way of cable route trench, signal/location box
foundation, track crossing etc. These
obstructions will be removed by the
contractor for ensuring proper execution of
related works. Note: In case of broken
sleepers, proportionate payment will be
27 27 Supply, transportation and fixing of RCC Cable Numbers 8.00 576.00 4608.00
Route Marker as per SEM drawing No. 15-D1
or latest. (Inspection by representative of Sr.
CKP-DIVN- S AND T/SOUTH EASTERN RLY
28 28 Modification/Upgradation, wiring, validation & Set 2.00 46855.00 93710.00
alteration of Data Logger/RTU of Digital &
Analog Input including NMDL software etc. as
per site engineer. The necessary wire from
relay to tag block & from tag block to data
logger, tag block, terminal, wiring material
etc. required for this work to be supplied by
contractor. Wire to be procured from RDSO
approved firms.
29 29 Cleaning of Debris and Bushes surrounding Sqm 20.00 11.00 220.00
the Goomty/Apparatus Case/Store
Complex/under the existing running rod or
any other Signalling installation as instructed
by Engineer-in-charge.
30 30 Removal of Earth of all kinds of soils/rocks, cum 12.00 142.00 1704.00
boulders including mud/slush, slipped earth in
catch water drains, side drains, over berms in
cutting, water way of bridges, over coping of
toe/breast/retaining walls etc. including
crossing of nallah, railway tracks,
making/repairing approach roads if required,
all lead, lift, handling, re-handling, ascent,
descents, or any other obstruction including
all labour and material as a complete job.
Earth spoils to be dumped outside the cutting
or railway embankments as per direction of
Engineer-in-charge.
commissioning of track circuit on Straight
Portion of Track (without involving points and
crossings) as per Drawing No. SK/DRG/OL/27
or latest and track bonding plan. The work
includes drilling of 9/32" hole on Rails,
provision of bonding, fixing and painting of
Track Lead Junction Boxes, termination of tail
cables, termination of Track lead wires,
double Jumper wires, Installation & wiring of
track feed set (Track Charger, Adjustable
Resistance, choke coil, fuses, battery, relays
etc.), testing of Glued/Block Joints and also
lettering/numbering of track lead junction
boxes, block joints and track circuits. This also
includes transportation of all materials
required for the above installation. Note:
Track feed set, bonding wires, TLJB, channel
pin, tail cable to be supplied by Railway.
Schedule B-Material Supply(SOR) for (Dual Detection by Commissioning of T/Cct in Jt/line between
Item- 1 Details of Schedule 'B' are given below: -
S No. Item Description of Item Unit Qty Rate Amount
1 01 Supply of Sulphuric Acid solution having Kg 20.00 46.00 920.00
nominal specific Gravity 1210. (Inspection by
representative of Sr. DSTE/CKP)
for Track Circuit Bonding or for other
application as per Specification No.IS:279/81
or latest. (Inspection by representative of Sr.
3 03 Supply of Insulated galvanized flexible Kg 70.00 207.00 14490.00
stranded wire rope 7x7 construction, 19 mm
circumference, Tensile Strength 125-140 Kg
per square mm as per Specification No. IRS:S-
3/61 or latest wrapped with Extruded jacket of
PVC, thickness 2 mm. Wire colour will be
decided by Engineer-in-charge. (Inspection by
representative of Sr. DSTE/CKP)
CKP-DIVN- S AND T/SOUTH EASTERN RLY
4 04 Supply of 30 mm length Channel Pins, single Numbers 120.00 2.00 240.00
groove for bonding Track Circuiting wires of
7mm dia. for 4mm dia. bond wire to RDSO
Drawing No. S-69/M or latest as per
Specification No. IRS: S17-75 Rev 3 & IS:
1573-70 or latest. (Inspection by
representative of Sr. DSTE/CKP)
5 05 Supply of Steel Apparatus case Full height as Numbers 8.00 17430.00 139440.00
per Drawing No. SK/Drg./OL/SER /198 or latest
with E type lock . E-type lock & their key ward
No. will be decided by site engineer as per
Specification No. IRS: S-10/78 with Rev. 8 or
latest. Supply of Hylam sheets is not covered
under this scope. This includes supply of one
key & handle for each four Apparatus Case or
minimum one. (Inspection by representative
of Sr. DSTE/CKP)
6 06 Supply of Earth Electrode as per Drawing No. Set 8.00 2712.00 21696.00
19-D6 of SEM-2021 or latest. GI pipe
confirming to IS:1239 or latest of 3.17 mm
thickness, minimum 2.5 m long, 50.8 mm
diameter, 4.76 mm diameter drilled holes
staggered at distance of 152.4 mm.
(Inspection by representative of Sr.
7 07 Supply of 25 mm 6 Way PBT ARA Terminal Numbers 90.00 322.00 28980.00
block as per Specification No. IRS:S-75/2006
Rev. 2.0 or latest as per IRS Drg. No. SA-
23756 Alt-3 or its latest amendments.
(Inspection by representative of Sr.
8 08 Supply of Non-Deteriorating type of low Numbers 20.00 55.00 1100.00
voltage electric fuse for Railway signalling
use, fuse with cylindrical cap without
indication, cylindrical fuse as per Specification
No. IRS:S-78/2006 or latest. (a) ND Fuse
Cylindrical Type 4/6 Amp. (Inspection by
9 09 Supply of PBT fuse block as per Specification Numbers 20.00 109.00 2180.00
No. IRS:S-75/2006 Rev. 2.0 or latest as per
IRS drawing No. SA: 23748 with alt 4 or its
latest amendments. (Inspection by RDSO)
10 10 Supply of PVC Insulated Single core Kilometre 1.50 7832.00 11748.00
Multistrand, unsheathed with plain
annealed/tinned copper conductor 16/0.2 mm
diameter as per Specification No. IRS:S-76/89
or latest. Wire Colours shall be decided by
engineer-in-Charge. Note: The requirement of
plain/tinned copper to be decided by the
Engineer-in- charge. (Inspection by
representative of Sr. DSTE/CKP)
11 11 Supply of PVC Insulated single core cable Kilometre 0.30 21278.00 6383.40
multistrand, unsheathed with plain
annealed/tinned copper conductor 3/0.75 mm
diameter as per Specification No. IRS:S-76/89
or latest. Wire Colours shall be decided by
engineer-in-Charge. Note: The requirement of
plain/tinned copper to be decided by the
Engineer-in-charge. (Inspection by
representative of Sr. DSTE/CKP)
12 12 Supply of PVC Insulated single core cable Kilometre 0.30 43745.00 13123.50
multistrand, unsheathed with plain
annealed/tinned copper conductor 7/0.75 mm
diameter as per Specification No. IRS:S-76/89
or latest. Wire Colours shall be decided by
engineer-in-Charge. Note: The requirement of
plain/tinned copper to be decided by the
Engineer-in-charge. (Inspection by
representative of Sr. DSTE/CKP)
CKP-DIVN- S AND T/SOUTH EASTERN RLY
13 13 Supply of 35 mm x 6 mm thick MS Flat Plate Metre 40.00 166.00 6640.00
Strip as per IS: 226-1975 or latest for earth
connection to Signal post, L/Box etc.
(Inspection by representative of Sr.
14 14 Supply of pressure Sensitive Adhesive Numbers 6.00 32.00 192.00
Plasticized PVC Tapes having 20 mm width,
minimum 25 Meter length. The colour of the
tape shall be decided by Railway in-charge.
Make: Protex/Nippon/Anchor or better.
(Inspection by representative of Sr.
15 15 Supply of PVC Insulated Multicore copper Kilometre 0.10 94546.00 9454.60
conductor Indoor Cable 40 Core x 0.6mm
diameter as per Specification No. IRS:S-76/89
or latest. (Inspection by representative of Sr.
16 16 Supply of 1 copy of SWR in English finally Numbers 6.00 522.00 3132.00
approved by railways along with spiral
binding. This has to be done after CRS
sanction has been obtained. (Inspection by
representative of Sr. DSTE/CKP)
17 17 Supply of 1 copy of SWR in Hindi/Regional Numbers 6.00 522.00 3132.00
Language of that station finally approved by
railways along with spiral binding. This has to
be done after CRS sanction has been
obtained. (Inspection by representative of Sr.
Schedule C-Execution(SOR) for (Auto Media Change over system for SSDACs & UFSBI over CKP
Item- 1 Details of Schedule 'C' are given below: -
S No. Item Description of Item Unit Qty Rate Amount
1 01 Transportation and fixing of PVC Conduit Metre 500.00 15.00 7500.00
pipe/channel/casing caping on wall or
structure with drawls of Telecom/Power/Data
cable with proper finishing. This includes
supply of fixing materials including flexible
pipe/bend etc. as required during course of
2 02 Installation, splicing and commissioning of Numbers 20.00 4016.00 80320.00
Fibre Distribution Management system
(FDMS) for 24 Fiber complete with all
accessories such as patch cord & pigtail etc.
as per TEC Spec. with latest amendment. The
sundry material if required any to be supplied
Schedule D-Material Supply(SOR) for (Auto Media Change over system for SSDACs & UFSBI over
Item- 1 Details of Schedule 'D' are given below: -
S No. Item Description of Item Unit Qty Rate Amount
1 01 Supply of UTP CAT - 6 cable, having bare Metre 500.00 17.00 8500.00
Copper Conductor of diameter 0.5 mm,
Suitable for Gigabit Ethernet TEC
Specification No. G/WIR 06/02 or latest.
(Inspection by representative of Sr.DSTE/CKP)
2 02 Supply of RJ-45 connector. Make: D-link or Numbers 1632.00 6.00 9792.00
better. (Inspection by representative of
Schedule D1-Material Supply(Non-SOR) for (Auto Media Change over system for SSDACs & UFSBI
over CKP Division)
Item- 1 Details of Schedule 'D1' are given below: -
CKP-DIVN- S AND T/SOUTH EASTERN RLY
S No. Item Description of Item Unit Qty Rate Amount
commissioning of Automatic Change Over
device of DAC/UFSBI V.21/ V.23 to optical
fibre, STM(E1), standard 19" rack mountable
device consisting of two E1 port supporting
120 Ohms interface, dual optical ports with
(1+1) hot stand by (dual core path and single
core path) 20 kms driving distance and four
V.21/V.23 (E&M) 24W/4W interfaces with auto
change over mechanism to Quad ports
2W/4W, each port configurable as 2W or 4W
no restriction in configuration , unit to support
potential free contacts four number an cbe
linked with data logger/RTU for E1 status,
Quad status and Power supply status, unit
support front panel resettable audio able
buzzer in case of main link fails (Optical or
E1), unit to support power OFF fail safe
mechanism when the unit is switched OFF the
inputs is bypassed to the quad cable
automatically unit support, unit for quad
health status, E1 dual optical dual path, Dual
DC power supply 18VDC to 72V DC range
make: Team link/Team Engg/Cygnus
/FABIO1CX-4P or superior. (Technical
Specification as per Annexure-A attached)
(Inspection by RITES)
2 02 Supply of 6A DP C series MCB. (Inspection by Numbers 202.00 609.91 123201.82
representative of Sr.DSTE/CKP)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .