Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance M 7 HOUSING BOARD UNIT MADHAYANKUTTAI PO METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹5,900
Closing Date
23 Feb 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE VGTPS
VGTPS , Ramanathapuram - 623536
Condition monitoring, inspection and Break down maintenance of HRSG, HP/IP/LP BFP System, De-aerator , Feed tank, HP/IP/LP feed control station and HP spray control system, IBD, CBD, HP/IP/LP dosing system, connected pipelines and associated valves
2021_EB_194780_1
SE/VGTPS/RMD/WC.NO.160/20-21
Open Tender
Miscellaneous Works
Works
180 days
VGTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,900
Yes
24 Feb 2021
9 Feb 2021
24 Feb 2021
9 Feb 2021
23 Feb 2021
9 Feb 2021
180 days
Amount
Periodical Maintenance
Charges for condition monitoring and inspection of HRSG Phosphate dosing pumps and HRSG drain pit pumps, to carry out cleaning and minor rectification works like arresting of gland leaks in pumps, renewal of gland packing, if necessary, topping up of oil, adjusting of stroke length, lubricating of bearings etc., as per the direction of Engineer-in-charge.
Charges for condition monitoring and inspection of HRSG HP/IP/LP drum system, HP/IP/LP vent system, safety valves, HP/IP/LP main steam system, connected pipelines and valves etc., observe for any water/steam leaks and rectify the minor defects by tightening of gland/removal of gland packings and replacing by new one, lubricating of valves, easying the valve operation and renewal of gaskets as per the direction of Engineerin-charge
Charges for condition monitoring and inspection of HRSG HP/IP/LP Feed control Station, HP/IP/LP blowdown system, HP spray control station, connected pipelines and valves etc., observe for any water/steam leaks and rectify the minor defects by tightening of gland/removal of gland packings and replacing by new one, lubricating of valves, easying the valve operation and renewal of gaskets, HRSG manhole door inspection and attending minor leaks as per the direction of Engineer-in-charge.
Charges for condition monitoring and inspection of HP/IP/LP Boiler feed pumps (6 Nos of pumps), all connected pipes and valves in suction & discharge side and to carry out regular maintenance work like external cleaning, checking and topping up of oil for bearings, cleaning of mechanical seal cooler, suction strainers, arresting of flange leaks, gland leak in valves & renewal of gland packings if required cleaning of cooling water line, applying grease in valve & easing the operation of valves wherever necessary as per direction of Engineer in-charge
Charges for condition monitoring and inspection of De-aerator, Feed Tank, Plate heat Exchanger and connected pipes and valves and carrying out regular maintenance work like external cleaning, arresting of flange leaks, changing of gaskets, gland leak in valves & renewal of gland packing if required, applying grease in valve & easing the operation of valve wherever necessary asper the direction ofEngineer in - charge.
Charges for condition monitoring and inspection of HRSG drain system, flash tanks, IBD and CBD tanks, connected pipelines and valves etc., observe for any water/steam leaks and rectify the minor defects by tightening of gland/removal of gland packings and replacing by new one, lubricating of valves, easying the valve operation and renewal of gaskets as per the direction of Engineerin-charge.
Charges for welding joints upto (100 mm Dia) in steam & water lines and support structures by welding including removal of the insulation, re-fixing of the insulation after testing the weld by using DPT kit as per the direction of Engineerin-charge .
Charges for welding joints upto 100mm diameter steam / water lines using High Pressure Welder including removal of the insulation, re-fixing of the insulation after testing the weld by using DPT kit as per the direction of Engineerin-Charge
Charges for condition monitoring and inspection of hydrazine dosing pumps and its auxiliary piping, flanges & tank agitator for carrying out cleaning and rectification works like, attending flange leak & valve gland leaks in the dozing system, arresting of gland leaks in pumps, renewal of gland packing, if necessary, topping up of oil, adjusting of stroke length, lubricating of bearings, etc., as per direction of Engineer -in- charge.
Breakdown Maintenance
Phosphate Dosing Pumps :For HP/IP/LP Drums Charges for dismantling of the pump decoupling & coupling, checking of suction & discharge valve, replacement of gland packing, replacement of worn out bearings, worm wheel and shaft, if any, changing of gear box oil etc. and assembling of the pump after completion of work, coupling with motor as directed by Engineerin-charge.
HP BFP : DE Mechanical seal / Bearing inspection Charges for decoupling, coupling hub removal, checking of drive end bearing, oil labrinth and mechanical seals and replacing if necessary, cleaning of seal water cooler, flushing of coolingwater pipings, replacement of damaged gasket and o ring etc., reinstallation, alignment and coupling after the work was completed, etc., as per direction of Engineer in- charge.
HP BFP : NDE Mechanical seal / Bearing Inspection Charges for decoupling, coupling hub removal, checking of Non drive end bearing, oil labrinth and mechanical seals and replacing if necessary, cleaning of seal water cooler, flushing of cooling water pipings,replacement of damaged gasket and o ring etc., reinstallation, alignment and coupling after the work was completed, etc., as per direction of Engineer in- charge
IP BFP : DE Mechanical seal / Bearing Inspection Charges for decoupling, coupling hub removal, checking of drive end bearing, oil labrinth and mechanical seals and replacing if necessary, cleaning and flushing of cooling water pipelines, replacement of damaged gasket and o ring etc., reinstallation, alignment and coupling after the work, etc., as per direction of Engineer - in- charge.
IP BFP : NDE Mechanical seal / Bearing Inspection Charges for decoupling, coupling hub removal, checking of Non drive end bearing, oil labrinth and mechanical seals and replacing if necessary, cleaning and flushing of cooling water pipelines, replacement of damaged gasket and o ring etc., reinstallation, alignment and coupling after the work, etc., as per direction of Engineer in- charge.
LP BFP : DE Mechanical seal / Bearing inspection Charges for decoupling, coupling hub removal, checking of drive end bearing, oil labrinth and mechanical seals and replacing if necessary, cleaning and flushing of cooling water pipelines, replacement of damaged gasket and o ring etc., reinstallation, alignment and coupling after the work, etc., as per direction of Engineer in- charge.
LP BFP : NDE Mechanical seal / Bearing inspection Charges for decoupling, coupling hub removal, checking of Non drive end bearing, oil labrinth and mechanical seals and replacing if necessary, cleaning and flushing of cooling water pipelines, replacement of damaged gasket and o ring etc., reinstallation, alignment and coupling after the work, etc., as per direction of Engineer - in- charge
Overhauling of MOV/Hand operated valves and NRVs upto 25mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineerin-charge.
Overhauling of MOV/Hand operated valves and NRVs upto 50 mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineerin-charge.
Overhauling of MOV/Hand operated valves and NRVs upto 100 mm size Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineerin-charge
Overhauling of MOV/Hand operated valves and NRVs upto 150 mm size Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc.,as per the direction of Engineerin-charge
Overhauling of MOV/Hand operated valves and NRVs upto 250 mm size Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc.,as per the direction of Engineerin-charge.
Hydrazine Dozing Pump Charges for dismantling of the pump, checking of suction & discharge valve, replacement of gland packing,worn out bearings, worm wheel and shaft, if any replenishing of gear box oil etc., reinstallation of the pump as per direction of Engineer in - charge
Thermal Insulation Removal for Single layer, lagging and cladding.
Thermal Insulation Re-insulation for Single layer, lagging and cladding.
HP/IP/LP Phosphate /Hydrazene dozing stirrer Charges for decoupling of stirrer and motor, cleaning the shaft and impeller, inspection of bearings, replacement of worn-out bearings, assembling of the same, after completion of work, coupling with motor and normalizing etc., as per the direction of Engineer in -charge
Overhauling of Pneumatic Operated Flow Control/Temperature Control/HP Spray Control/Drain Valves: charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat,valve globe/gate and blue matching, assembling of valve,renewal of gland packing,assembling actuator if any,providing insulation,checking of valve operation and completing the work, as per the direction of Engineerin-charge
HRSG Drain Pit Pumps Breakdown maintenance of HRSG drain pit pumps like cleaning of suction strainer, decoupling of the pump inspection of the pump internals, changing of the impeller / Casing wearing / Bearing / sleeves / Oil seals etc.,and coupling of the pump with motor as per the direction of Engineerin-Charge
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .