Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.4 L+₹572.42 (0.13%)Rejected-Finance PUTUMARI FULESWARI COOCH BEHAR 736157 | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736157 | L2 | Rejected-Finance Lowest Amount Quoted BY MOBARAK HOSNE Rs.439669.51 | |
| 3 | L3₹4.4 L+₹616.46 (0.14%)Rejected-Finance | L3 | Rejected-Finance Lowest Amount Quoted BY MOBARAK HOSNE Rs.439669.51 |
Tender Value
₹4.4 L
EMD Value
₹8,807
Closing Date
14 Feb 2026, 4:00 pmClosed
PRODHAN
KHOCHABARIHAT, COOCHBEHAR
CONSTRUCTION OF WATER TANK WITH TWO HP CAPACITY SOLAR PHOTO VOLTAIC AC SYSTEM NEAR CHHARAR PAR VILLAGE KHOLTA SLNO-03
2026_ZPHD_1000524_3
08/MKGP/2025-26 SLNO-01 TO 05
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
60 days
MARICHBARI KHOLTA G.P.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹8,807
2 Sept 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
14 Feb 2026
6 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF WATER TANK WITH TWO HP CAPACITY SOLAR PHOTO VOLTAIC AC SYSTEM | - | nos | 2,29,671 | - |
| 2 | ELECTRICAL WORK (SOLAR SYSTEM) | - | Item | 2,10,659 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
solar_water_ESTIMATE.pdf
Additional Documents • 2.46 MB
BOQ_2451531.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .