Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC | L1 | Accepted-AOC Tender allotted | |
| 2 | L2₹20.3 L+₹1.3 L (7.14%)Rejected-Finance | L2 | Rejected-Finance Not allotted | |
| 3 | Rejected-Technical NEAR GOVT BOYS SCHOOL BHARELI ROAD VPO BARWALA PANCHKULA HARYANA 134118 | PANCHKULA | PANCHKULA | HARYANA | 134118 | - | Rejected-Technical Non Responsive | |
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive |
Tender Value
₹19.2 L
EMD Value
₹38,500
Closing Date
20 May 2023, 5:00 pmClosed
RITESH AGGARWAL
PD-I, Kurukshetra
ESTIMATE OF BOUNDARY WALL FOR CONSTRUCTION OF SUB HEALTH CENTRE AT VILLAGE ISHAK IN DISTRICT KURUKSHETRA. (CM ANNOUNCEMENT CODE NO. 24186 DATED 19.02.2019)
2023_HRY_282060_1
202376B5987A 2335 484C ACEF C3C86DFA266B609BAR
Open Tender
Civil Works
Works
120 days
ISHAQ
BOUNDARY WALL FOR CONSTRUCTION OF SUB HEALTH CENTRE AT VILLAGE ISHAK IN DISTRICT KURUKSHETRA. (CM ANNOUNCEMENT CODE NO. 24186 DATED 19.02.2019)
2 documents required · 2 mandatory
₹1,000
₹38,500
Yes
12 Sept 2023
15 May 2023
20 May 2023
15 May 2023
20 May 2023
15 May 2023
Amount
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand)
[11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete
[11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand)
[11.75.2]Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. 2. Two coats
[11.97.3]Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : 3. Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 litre/10 sqm over an under coat of primer applied @ 0.80 litre/10 sqm of approved brand and manufacture
[13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
[6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
[6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
[7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
The Shree Radhe Co op L and C Society Ltd. Cheeka
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .