| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97,904.53Admitted-Finance | ₹97,904.53 | L1 | Admitted-Finance |
| 2 | L2₹98,646.55+₹742.02 (0.76%)Admitted-Finance | ₹98,646.55+₹742.02 (0.76%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Techanical Bid Condition 9/9.3 Original Document Not Submitted with in Two Working Days Hence Bids will be Declared as Non-Responsive - Bank Certificate Not Submitted - Techanical Certificate Not Submitted |
| Sl No | Description | Qty | Unit | A SURYAKUMARAN L1 | SRI R S ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.001.)Repairs to PUE School Toilet @ Mariyamman Pudhur H/o Thukkiyampalayam | |||||
| 2.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick / Stone Masonry in lime mortar walls under 3m high | 4.07 | cum | 150 ₹610.5 Lowest | 200 ₹814 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 1.02 | cum | 4,750 ₹4,845 Lowest | 4,850 ₹4,947 |
| 4.00 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data) | 10.21 | cum | 1,325 ₹13,528.25 Lowest | 1,375 ₹14,038.75 |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical | 3.91 | Sqm | 450 ₹1,759.5 Lowest | 476.5 ₹1,863.12 |
| 6.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 4.07 | MT | 5,550 ₹22,588.5 Lowest | 5,650 ₹22,995.5 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.04 | cum | 88,873.5 ₹3,999.31 Lowest | 88,873.5 ₹3,999.31 Lowest |
| 8.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.72 | Sqm | 8,508.06 ₹6,125.8 Lowest | 8,508.06 ₹6,125.8 Lowest |
| 9.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 69.76 | cum | 245 ₹17,091.2 | 235 ₹16,393.6 Lowest |
| 10.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 69.76 | Sqm | 178.06 ₹12,421.47 Lowest | 178.06 ₹12,421.47 Lowest |
Tender Value
₹1.0 L
EMD Value
₹1,010
Closing Date
16 Sept 2026, 3:00 pmClosed
BDO(BP)
BDO, Office, Valapadi
Repairs to PUE School Toilet at Mariyamman Pudhur H/o Thukkiyampalayam Panchayat in valapadi Block at Salem District 15th Finance (BP) - 2023-24
2026_RDTN_700001_1
Roc.No.1482/2023/A2
Open Tender
Civil Works
Item Wise
90 days
BDO, Office, Valapadi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,010
22 Sept 2026
1 Sept 2026
17 Sept 2026
1 Sept 2026
16 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.)Repairs to PUE School Toilet @ Mariyamman Pudhur H/o Thukkiyampalayam | - | - | - | - |
| 2 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick / Stone Masonry in lime mortar walls under 3m high | 4.07 | cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 1.02 | cum | - | - |
| 4 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data) | 10.21 | cum | - | - |
| 5 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical | 3.91 | Sqm | - | - |
| 6 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 4.07 | MT | - | - |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | - | cum | - | - |
| 8 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.72 | Sqm | - | - |
| 9 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 69.76 | cum | - | - |
| 10 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 69.76 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
01.pdf
Tender Documents • 1.28 MB
BOQ_841446.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .