| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.8 LAccepted-AOC | ₹27.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹34.1 L+₹6.4 L (22.9%)Rejected-Finance | ₹34.1 L+₹6.4 L (22.9%) | L2 | Rejected-Finance NOT L1 |
| 3 | L3₹35.8 L+₹8.0 L (28.9%)Rejected-Finance C O RANBIR SINGH OPPOSITE FULESHWAR PUMP BEHIND REAL VARIETY MALL KAJICHAK PATNA BIHAR 803214 INDIA | PATNA | BIHAR | 803214 | ₹35.8 L+₹8.0 L (28.9%) | L3 | Rejected-Finance NOT L1 |
| Sl No | Description | Qty | Unit | BAC EQUIPMENTS L2 | SUNIL KUMAR L1 | SRANBIR ELECTRICALS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 10.00POWER SUPPLY | ||||||
| 10.00 | Transformer Testing | 3 | NO | 30,000 ₹1,06,200 | 25,000 ₹88,500 Lowest | 35,000 ₹1,23,900 |
| 10.00 | Transformer Filtration | 10,500 | L | 9 ₹1,11,510 | 5.5 ₹68,145 Lowest | 8 ₹99,120 |
| 10.00 | Transformer EreCTION | 3 | NO | 20,500 ₹72,570 | 15,000 ₹53,100 Lowest | 22,600 ₹80,004 |
| 10.00 | LT Panel Shifting & Erection | 3 | NO | 10,500 ₹37,170 | 8,500 ₹30,090 Lowest | 12,500 ₹44,250 |
| 10.00 | Deployment of Crane | 5 | DAY | 15,000 ₹88,500 | 12,000 ₹70,800 Lowest | 15,500 ₹91,450 |
| 10.00 | Deployment of Trailor with | 5 | DAY | 12,000 ₹70,800 | 10,000 ₹59,000 Lowest | 12,550 ₹74,045 |
| 10.00 | Painting of Transformert | 150 | M2 | 210 ₹37,170 | 188 ₹33,276 Lowest | 218 ₹38,586 |
| 10.00 | Aerial Bunch Cable Supply | 500 | M2 | 2,100 ₹12,39,000 | 1,950 ₹11,50,500 Lowest | 2,148 ₹12,67,320 |
| 10.00 | Pole erection | 50 | NO | 6,500 ₹3,83,500 | 5,500 ₹3,24,500 Lowest | 7,200 ₹4,24,800 |
Tender Value
Refer Docs
Closing Date
17 Feb 2026, 11:00 amClosed
Sr. Manager C AND M OPG 2
NTPC Limited 9 th Floor Tower C Commercial Complex Plot No C 03 Central Business District CBD Sector 21 Atal Nagar Nava Raipur Pin Code 492018
Extending Power supply to C and D Towers NTPC BARAUNI
2026_NTPC_104937_1
NTPC/USSC-CPG2/9900319421
Limited
Miscellaneous Works
Works
180 days
Barauni Thermal Power Plant Project
1 document required · 1 mandatory
₹0
Exempted
21 May 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
10 Feb 2026 - 12 Feb 2026
POWER SUPPLY
Transformer Testing
Transformer Filtration
Transformer EreCTION
LT Panel Shifting & Erection
Deployment of Crane
Deployment of Trailor with
Painting of Transformert
Aerial Bunch Cable Supply
Pole erection
Aerial Bunch Cable Laying
Aerial Bunch Cable
erection of 11 kv insulator ,
Earth pit erection
fourPole Structure erection
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.72 MB
TenderDoc.rar
Tender Documents • 24.56 MB
BOQ_108171.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .