| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹20.0 LAccepted-AOC MAHUAR KIRAWALI AGRA | AGRA | AGRA | UTTAR PRADESH | L-1 | Accepted-AOC Work allotted after financial Approval from Committee | |
| 2 | L-2₹20.5 L+₹38,620.93 (1.92%)Accepted-AOC | L-2 | Accepted-AOC Work not Allotted |
| Sl No | Description | Qty | Unit | GARG ENTERPRISES L1 | M/S S.P. & CO L2 |
|---|---|---|---|---|---|
| 1.00 | Part-A (Supply of Material)
Clamp for Holding Pipe & Cable | 12 | Nos. | 944 ₹11,328 | 222.78 ₹2,673.41 Lowest |
| 2.00 | Stone Pad | 110 | Nos. | 94.4 ₹10,384 | 69.62 ₹7,658.2 Lowest |
| 3.00 | Clamp with Nut & Bolt | 77 | Nos. | 295 ₹22,715 | 222.78 ₹17,154.37 Lowest |
| 4.00 | Barbed wire | 126 | Kg. | 94.4 ₹11,894.4 Lowest | 111.39 ₹14,035.39 |
| 5.00 | Danger Board with Clamp | 102 | Nos. | 177 ₹18,054 Lowest | 278.48 ₹28,404.96 |
| 6.00 | P.G. Clamp | 21 | Nos. | 295 ₹6,195 | 111.39 ₹2,339.23 Lowest |
| 7.00 | Number Plate | 105 | Nos. | 177 ₹18,585 Lowest | 278.48 ₹29,240.4 |
| 8.00 | Aluminium Tape | 1 | Kg. | 94.4 ₹94.4 Lowest | 417.72 ₹417.72 |
| 9.00 | Holding Clamp for ST Pole | 4 | Nos. | 354 ₹1,416 | 222.78 ₹891.14 Lowest |
| 10.00 | F-Clamp | 16 | Nos. | 236 ₹3,776 Lowest | 250.63 ₹4,010.11 |
Tender Value
₹29.4 L
EMD Value
₹30,000
Closing Date
11 Aug 2025, 1:00 pmClosed
SE
EDC, B 690, Kamla Nagar, Agra
For the work of issuing 550 KVA new connection (Site C.W.U.R.) in village Kathwari, Achnera Agra under Jal Jeevan Mission on semi turnkey basis in Full deposit scheme under the area of Electricity Distribution Division, Lakhanpur, Agra.
2025_DVVNL_1059135_1
10/EDCA/2025-26
Open Tender
Electrical Works
Piece-work
90 days
EDC, B 690, Kamla Nagar
As per tender specification
2 documents required · 2 mandatory
₹3,540
www.dvvnl.org
₹30,000
13 Jan 2026
22 Jul 2025
11 Aug 2025
22 Jul 2025
11 Aug 2025
22 Jul 2025
Part-A (Supply of Material) Clamp for Holding Pipe & Cable
Stone Pad
Clamp with Nut & Bolt
Barbed wire
Danger Board with Clamp
P.G. Clamp
Number Plate
Aluminium Tape
Holding Clamp for ST Pole
F-Clamp
11 KV Cross Arm Holding Clamp
Guarding Angle With Clamp
G.I Pipe 6" dia
H.D.P.E. Pipe 6" dia
Part-B (Erection work) Cartiage of 11 KV VCB I/C CTR 600/300/5A, 350 MVA, 11 KV VCB O/G CTR 200/100/5A, 350 MVA from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
Cartiage of ST Pole 11 Mtr from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
Cartiage of 11 KV CT-PT 150/5 Amp. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
Cartiage of 11 KV 3X185 sqmm XLPE Cable from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
Cartiage of I/D & O/D Cable Jointing Kit from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. Aerial bunch conductor/Weasal conductor/Dog/ Rabbit, G.I. earth wire, cross arm, angle, channel, insulators, clamps, Stay Set, Dist. Box, and other line material, if required in Estimate/Package.
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 11 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 11 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms. Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
Laying and dressing of 11 KV 3X185 sqmm XLPE Cable (double circuit i.e. 1230X2) threw HDPE Pipe 6'' Dia by the trench method as per respo norms or direction by the supervising Engineer. The cable shall be duly protected by 1" class brick two on either side and third on top of the cable. Cables laying work includes unroling cutting / megaring / sealing both ends of the cable along with Restoration work. Labour, T &P and carrier, trench material etc. required for proper completion of work shall be done by the contractor at his own cost.
Laying of 11 KV 3x185 sqmm XLPE cable (double circuit i.e. 40X2) by drill machine/H.D.D. Machine threw H.D.P.E. Pipe 6" Dia at a depth of 1.0 mtr. Below the ground level. including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine required for proper completion of work shall be done by the contractor at his own cost.
Hoisting and Stringing 11 KV 3x185 sqmm XLPE overhead cable threw G.I. Pipe 6" Dia includes unroling cutting / megaring & sealing both ends as per Norms or Direction by supervising Engineer .
Laying sagging stringing and binding and jumpering of ACSR Dog Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
Laying sagging stringing and binding and jumpering of ACSR Rabbit Conductor at 11 KV/LT line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
Erection and grouting stay (cement, sand and bricks balast in ratio 1:2:4) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Making HT 'T' off connection on existing mains labour, T &P and carrier etc. required for proper completion of work.
Fixing of barbed Wire as required on Poles as per RESPO norms and direction by supervising Engineer.
Fixing of P.G. Clamps as per RESPO norms
Fixing of Danger Boards With clmap (shock Proof, Rust Proofs) on Poles as per RESPO norms.
Fixing of Number plates on Poles as per RESPO norms.
Filling of 11KV 3x185 sqmm Indoor/Outdoor Jointing Kit and making connection as per direction of supervising engineer.
Installation & Commissoning of 11 KV VCB I/C CTR 600/300/5A proper alignment and direction and jointing of earthing strips with help of gas welding and making cable connection including shifting dragging with all other associated works.
Installation & Commissoning of 11 KV VCB O/G CTR 200/100/5A, 350 MVA proper alignment and direction and jointing of earthing strips with help of gas welding and making cable connection including shifting dragging with all other associated works.
Installation of 3PH-4W Static Meter TVM 11 KV as per RESPO Norms or Direction by supervising Engineer.
Chemical Gel Earthing of 11 KV VCB as per RESPO Norms or Direction by supervising Engineer All material i.e. work shall be born by contractor at his own cost.
Fixing of Stone Pad as per RESPO Manual Labour, T &P and carriage etc and other associated works to complete the work. All work shall be born by the contractor at his own cost.
Installation & Commissoning of 11 KV CT-PT 150/5 Amp as per RESPO Norm and direction by supervising Engineer..
Guarding of HT/LT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.
Installation of 11 KV Pilfer Proof Metering Cubical 100/5A & Making connection as per RESPO Norms or Direction by supervising Engineer.
Cost of Dismantling Existing Line ie. Material (750 Mtr Line old & used ACSR Weasel conductor (750x3 =2250 Mtr.) and received back to Store center, Agra. (Apprx 00-50 KM)
M/S S.P. & CO (BID ID -5417401)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .