Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 CrAccepted-AOC 155 KARNAL NEW GRAIN MARKET KARNAL KARNAL HARYANA 132001 | KARNAL | HARYANA | 132001 | ₹8.4 Cr Quoted ₹8.5 Cr | L1 | Accepted-AOC Being lowest |
| 2 | L2₹8.9 Cr+₹46.4 L (5.48%)Rejected-Finance C O GUPTA EMPORIUM AR BAZAR HAPPY VALLEY SHILLONG 793 004 | EAST KHASI HILLS | MEGHALAYA | 793004 | ₹8.9 Cr+₹46.4 L (5.48%) | L2 | Rejected-Finance Not lowest |
| 3 | L3₹9.3 Cr+₹82.5 L (9.74%)Rejected-Finance 1630 SECTOR 7C CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | ₹9.3 Cr+₹82.5 L (9.74%) | L3 | Rejected-Finance Not lowest |
| 4 | L4₹9.8 Cr+₹1.3 Cr (15.8%)Rejected-Finance 34 KAISER GANJ MANDI DIST MEERUT UP 250002 | MEERUT | UTTAR PRADESH | 250002 | ₹9.8 Cr+₹1.3 Cr (15.8%) | L4 | Rejected-Finance Not lowest |
| 5 | L5₹10.3 Cr+₹1.8 Cr (21.4%)Rejected-Finance OPP BSF GATE NO 3 AZARA GUWAHATI 17 ASSAM | ₹10.3 Cr+₹1.8 Cr (21.4%) | L5 | Rejected-Finance Not lowest |
| Sl No | Description | Qty | Unit | M/s Gupta Construction L4 | M/s Dhani Enterprise L5 | M/S UTTAM SAHA L2 | H K Enterprise L8 | N.K.TRADING COMPANY L1 | M/S LG BUILDERS L6 | SAGGI ELECTRIC COMPANY L3 | SWARAJ INFRA L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding but not backing complete all as specified and as directed. | 14,546 | Sqm | 35 ₹5,09,110 | 27 ₹3,92,742 | 20 ₹2,90,920 Lowest | 95 ₹13,81,870 | 55 ₹8,00,030 | 22 ₹3,20,012 | 23 ₹3,34,558 | 32 ₹4,65,472 |
| 2.00 | M & L for coloured non skid ceramic tiles 7 to 8 mm thick (Square/rectangular) area of each tile exc 0.06 sqm but n.exc 0.11 sqm, laid in floors etc set and jointed in neat cement slurry and pointed in white or coloured cement to match the colour of tile over and including 15mm thick screed bed in cement mortar 1:4 complete all as specified and as directed. | 1,050 | Sqm | 1,100 ₹11,55,000 | 1,260 ₹13,23,000 | 1,200 ₹12,60,000 | 900 ₹9,45,000 | 736 ₹7,72,800 | 1,299 ₹13,63,950 | 651 ₹6,83,550 Lowest | 880 ₹9,24,000 |
| 3.00 | M&L for glazed light coloured/printed ceramic tiles 450x 300x7mm thick in vertical surfaces such as skirting, dado etc set and jointed in neat cement slurry, pointed in white or coloured cement to match colour of tiles, over and including 10 mm thick rendering in cement mortar 1:4 complete all as specified and as directed. | 11,343 | Sqm | 1,150 ₹1,30,44,450 | 1,224 ₹1,38,83,832 | 1,100 ₹1,24,77,300 | 1,200 ₹1,36,11,600 | 736 ₹83,48,448 | 1,399 ₹1,58,68,857 | 651 ₹73,84,293 Lowest | 864 ₹98,00,352 |
| 4.00 | M & L for coloured non-skid ceramic tiles 7 to 8 mm thick (Square/rectangular) area of each tile exceeding 0.11 Sqm but not exceeding 0.18 Sqm, laid in floors etc., over and including 15 mm thick screed bed or bedding layers in cement motar 1:4, set and jointed in neat cement slurry and pointed in white or coloured cement to match colour of tiles complete all as specified and as directed. | 1,723 | Sqm | 1,150 ₹19,81,450 | 1,323 ₹22,79,529 | 1,200 ₹20,67,600 | 1,210 ₹20,84,830 | 782 ₹13,47,386 | 1,499 ₹25,82,777 | 651 ₹11,21,673 Lowest | 960 ₹16,54,080 |
| 5.00 | M & L for coloured non-skid ceramic tiles 7 to 8mm thick (Square/rectangular) area of each tile exceeding 0.11 Sqm but not exceeding 0.18 Sqm in skirting/ dados etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match existing surfaces over and including 10 mm thick rendering in cement mortar 1:4, set and jointed in neat cement slurry and pointed in white or coloured cement to match colour of tiles, complete all as specified and as directed. | 431 | Sqm | 1,150 ₹4,95,650 | 1,332 ₹5,74,092 | 1,200 ₹5,17,200 | 1,230 ₹5,30,130 | 782 ₹3,37,042 | 1,399 ₹6,02,969 | 651 ₹2,80,581 Lowest | 960 ₹4,13,760 |
| 6.00 | Demolition of stone slabs and granite laid, bedded and pointed in any mortar of any description or thickness in floors, apron cills or platform etc., complete all as specified and as directed. | 89 | 10 Sqm | 600 ₹53,400 | 150 ₹13,350 | 300 ₹26,700 | 850 ₹75,650 | 322 ₹28,658 | 22 ₹1,958 Lowest | 310 ₹27,590 | 1,200 ₹1,06,800 |
| 7.00 | M & L for Green Marble work 18 to 20 mm thick (table rubbed and polished) in steps, jambs, pillars, window cills, cooking platforms and the like in cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of pigment to match with marble shade, complete all as specified and as directed. | 893 | Sqm | 2,500 ₹22,32,500 | 4,500 ₹40,18,500 | 2,400 ₹21,43,200 | 2,600 ₹23,21,800 | 1,656 ₹14,78,808 Lowest | 3,999 ₹35,71,107 | 1,783 ₹15,92,219 | 1,920 ₹17,14,560 |
| 8.00 | M & L for rounding to edges of stone slabs one edge, such as in steps cooking platform and other similar situations complete all as specified and as directed. | 1,488 | RM | 80 ₹1,19,040 | 72 ₹1,07,136 | 20 ₹29,760 Lowest | 90 ₹1,33,920 | 165 ₹2,45,520 | 344 ₹5,11,872 | 39 ₹58,032 | 120 ₹1,78,560 |
| 9.00 | M & L for Chequered cement concrete tiles 20cm x 20cm x 25 mm thick, set, jointed and pointed in neat cement slurry in floors with grey pigments cement and pigments over and including 15 mm thick screed bed in cement mortar (1:6), complete all as specified and as directed. | 394 | Sqm | 1,200 ₹4,72,800 | 1,170 ₹4,60,980 | 1,200 ₹4,72,800 | 1,050 ₹4,13,700 | 147 ₹57,918 Lowest | 1,288 ₹5,07,472 | 1,132 ₹4,46,008 | 800 ₹3,15,200 |
| 10.00 | Taking down cement plaster on walls, chajja surfaces, etc including raking out joints, hacking for key, scrubbing down with water complete all as specified and as directed. | 3,008 | Sqm | 35 ₹1,05,280 | 15 ₹45,120 Lowest | 30 ₹90,240 | 27 ₹81,216 | 46 ₹1,38,368 | 45 ₹1,35,360 | 23 ₹69,184 | 32 ₹96,256 |
Tender Value
Refer Docs
EMD Value
₹9.3 L
Closing Date
26 Jun 2025, 6:00 pmClosed
Cheif Engineer Shillong
Chief Engineer Shillong Shillong Zone Spread Eagle Falls Shillong 793011
ADDN/ALTN AND SPECIAL REPAIR TO MAP PH I MD ACCN AT HAPPY VALLEY SHILLONG, UNDER GE SHILLONG
2025_MES_709029_1
89835/SHL/E8
Open Tender
Civil Works
Item Rate
600 days
GE Shillong
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
GE Shillong
₹9.3 L
Yes
2 Sept 2025
19 May 2025
28 Jun 2025
19 May 2025
26 Jun 2025
20 Jun 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding but not backing complete all as specified and as directed. | 14,546 | Sqm | - | - |
| 2 | M & L for coloured non skid ceramic tiles 7 to 8 mm thick (Square/rectangular) area of each tile exc 0.06 sqm but n.exc 0.11 sqm, laid in floors etc set and jointed in neat cement slurry and pointed in white or coloured cement to match the colour of tile over and including 15mm thick screed bed in cement mortar 1:4 complete all as specified and as directed. | 1,050 | Sqm | - | - |
| 3 | M&L for glazed light coloured/printed ceramic tiles 450x 300x7mm thick in vertical surfaces such as skirting, dado etc set and jointed in neat cement slurry, pointed in white or coloured cement to match colour of tiles, over and including 10 mm thick rendering in cement mortar 1:4 complete all as specified and as directed. | 11,343 | Sqm | - | - |
| 4 | M & L for coloured non-skid ceramic tiles 7 to 8 mm thick (Square/rectangular) area of each tile exceeding 0.11 Sqm but not exceeding 0.18 Sqm, laid in floors etc., over and including 15 mm thick screed bed or bedding layers in cement motar 1:4, set and jointed in neat cement slurry and pointed in white or coloured cement to match colour of tiles complete all as specified and as directed. | 1,723 | Sqm | - | - |
| 5 | M & L for coloured non-skid ceramic tiles 7 to mm thick (Square/rectangular) area of each tile exceeding 0.11 Sqm but not exceeding 0.18 Sqm in skirting/ dados etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match existing surfaces over and including 10 mm thick rendering in cement mortar 1:4, set and jointed in neat cement slurry and pointed in white or coloured cement to match colour of tiles, complete all as specified and as directed. | 431 | Sqm | - | - |
| 6 | Demolition of stone slabs and granite laid, bedded and pointed in any mortar of any description or thickness in floors, apron cills or platform etc., complete all as specified and as directed. | 89 | 10 Sqm | - | - |
| 7 | M & L for Green Marble work 18 to 20 mm thick (table rubbed and polished) in steps, jamps, pillars, window cills, cooking platforms and the like in cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of pigment to match with marble shade, complete all as specified and as directed. | 893 | Sqm | - | - |
| 8 | M & L for rounding to edges of stone slabs one edge, such as in steps cooking platform and other similar situations complete all as specified and as directed. | 1,488 | RM | - | - |
| 9 | M & L for Chequered cement concrete tiles 20cm x 20cm x 25 mm thick, set, jointed and pointed in neat cement slurry in floors with grey pigments cement and pigments over and including 15 mm thick screed bed in cement mortar (1:6), complete all as specified and as directed. | 394 | Sqm | - | - |
| 10 | Taking down cement plaster on walls, chajja surfaces, etc including raking out joints, hacking for key, scrubbing down with water complete all as specified and as directed. | 3,008 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.35 MB
Tenderdocument.pdf
Tender Documents • 2.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .