Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | ₹4.5 L | L1 | Accepted-AOC L1 bidder |
| 2 | Rejected-Technical 41 MAYAL SANDI NEAR RAJRAPPA MORE RAMGARH JHARKHAND 825101 | RAMGARH | JHARKHAND | 825101 | - | - | Rejected-Technical Technically Rejected |
| 3 | Rejected-Technical TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD DHANBAD JHARKHAND INDIA | DHANBAD | JHARKHAND | 828121 | - | - | Rejected-Technical Technically Rejected |
| Sl No | Description | Qty | Unit | MANOHAR BHUIYAN L1 |
|---|---|---|---|---|
| 1.01 | Carrying of test weights from weighbridge control room and loading the test weights 20 Kg's each in weighing platform/ structure 1/3 of Capacity or as instructed by Inspector/engineer Incharge gradually in 03 position (middle/ front/ rear/ 8 times and unloading the test weights for testing & calibration of weighbridge as per requirement (Once in two month per W/B or as per requirement) [Total cost for (i) 04 WB for 6 Month = 24 Times (ii) 04 WB x 4 Quarterly = 16 Times Testing & Calibration as per SOP then (i) + (ii) i.e. 24+16 = 40 Times] | 40 | Times | 11,215 ₹4.5 L |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹5.0 L
EMD Value
₹6,400
Closing Date
22 Aug 2025, 5:00 pmClosed
Project Engineer (EnM), Jarangdih Colliery
Project Engineer (EnM), Jarangdih Colliery
Handling of Test Weights 20Kgs each during verification of weighment of 04 Nos. namely 02 Nos. at Jarangdih Siding and 02 Nos. at Jarangdih OCP for a period of 365 day.
2025_CCL_341401_1
PE(EnM)/JRD/E-Tender/25-26/16 Dated 13.08.2025
Open Tender
Miscellaneous Works
365 days
P.E. (EnM), Office of the PO, Jarangdih Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,400
15 Feb 2026
13 Aug 2025
23 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
13 Aug 2025 - 20 Aug 2025
Amount
Carrying of test weights from weighbridge control room and loading the test weights 20 Kg's each in weighing platform/ structure 1/3 of Capacity or as instructed by Inspector/engineer Incharge gradually in 03 position (middle/ front/ rear/ 8 times and unloading the test weights for testing & calibration of weighbridge as per requirement (Once in two month per W/B or as per requirement) [Total cost for (i) 04 WB for 6 Month = 24 Times (ii) 04 WB x 4 Quarterly = 16 Times Testing & Calibration as per SOP then (i) + (ii) i.e. 24+16 = 40 Times]
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid