Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39,668.97Accepted-Finance | ₹39,668.97 | L1 | Accepted-Finance QUOTED LOW |
| 2 | L2₹40,339.38+₹670.41 (1.69%)Rejected-Finance 1 3 GROUND FLOOR SITARAM GHOSH STREET SITARAM GHOSH STREET SITARAM GHOSH STREET KOLKATA WEST BENGAL 700009 | KOLKATA | WEST BENGAL | 700009 | ₹40,339.38+₹670.41 (1.69%) | L2 | Rejected-Finance QUOTED HIGER THAN L1 |
| 3 | L3₹41,692.09+₹2,023.12 (5.10%)Rejected-Finance 87 31 BOSEPUKUR ROAD KOLKATA 700042 | KOLKATA | KOLKATA | WEST BENGAL | 700042 | ₹41,692.09+₹2,023.12 (5.10%) | L3 | Rejected-Finance QUOTED HIGER THAN L2 |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
28 Feb 2026, 1:00 pmClosed
OFFICE OF EE(CIVIL)
THE KOLKATA MUNICIPAL CORPORATION 97 AND 98 GARFA MAIN ROAD
REPAIRING OF POT HOLES, PATCHES, CROSS-CUTS ETC. AT DIFFRENT PLACES IN WARD NO-105.
2026_KMC_1012508_1
KMC/DG(C)/BR-XII/25-26
Open Tender
CIVIL WORKS
Percentage
180 days
BOROUGH XII
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,000
12 Sept 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means b) Cement Concrete ( Ref :PWD (Rds & Brdgs)-2018, It. No. 2.05 Page No.233) | 1 | M3 | 399 | ₹399 |
| 2 | BUILDING WORKS(P) SOLING, EDGING AND METALLING??(15)Labour for taking out old soling edging including removing debris. (a) Single flat soling | 1 | %SQ | 981 | ₹981 |
| 3 | Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post work | 1 | M3 | 79.9 | ₹79.9 |
| 4 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-4) | 1 | M3 | 1,172.6 | ₹1,172.6 |
| 5 | BUILDING WORKS(P) SOLING, EDGING AND METALLING??(2)Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used)(The item included the cost of obtaining local sand or powdered earth)(a) Single brick flat soling (thickness 75 mm) | 1 | %SQ | 3,584 | ₹3,584 |
| 6 | SINGLE BRICK FLAT SOLING OF PICKED JHAMA BRICKS INCLUDING RAMMING AND DRESSING BED TO PROPER LEVEL AND FILLING JOINTS WITH LOCAL SAND. ( REF :PWD (BLDG.)-2017, IT. NO. 1, PAGE NO.14 & 3RD CORRIGENDA ADDENDA DTD-04.06.18,P-1) | 1 | SQM | 361 | ₹361 |
| 7 | ORDINARY CEMENT CONCRETE (MIX 1:1.5:3) WITH GRADED STONE CHIPS (20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES. (I) PAKUR VARIETY ( REF :PWD (BLDG.)-2017, PAGE-26 (ITEM -10(I), CONSUMPTION CHART PG-B-60, SL-3 AND ANNEXTURE-II , FORMAT-A, 3RD CORRIGENDA & ADDENDA P-13 DTD-04.06.2018, PWD(R&B) 2018, CHAPTER-1, PG-227 I-1.03, PG-230,TABLE-I , TABLE III-2 PG-226, ) | 1 | M3 | 6,274.72 | ₹6,274.72 |
| 8 | Labour for picking up existing metalled road surface to a specified average depth, including screening and stacking the pavement materials. (b) For average depth above 40 mm but not exceeding 75 mm by manual means. (ii) Brick / Jhama metal surface. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 18.01 Page No.331) | 1 | SQM | 12.9 | ₹12.9 |
| 9 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 1 | METER | 8.17 | ₹8.17 |
| 10 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 1 | METER | 8.17 | ₹8.17 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_2486591.xls
BOQ • 0.31 MB
FORM-105_67.pdf
Tender Documents • 0.58 MB
PREQUE.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .