Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.0 LRejected-Finance RAMNAGAR BARDHAMAN 713380 WEST BENGAL INDIA | 713380 | ₹3.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.0 LRejected-Finance BAIDYNATHPUR PANDAVESWAR KAJORA 713346 WEST BENGAL INDIA | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹3.0 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | BHAGIRATH MONDAL L2 | MANAS MONDAL L3 | OM ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Re-Construction of Two (02) number Sectionalisation stopping at 11L/4D-3D & 16L/4D-3D in R-IV Seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Preparation for site cleaning | 3 | Cubic Meter | 665.32 ₹1,995.96 | 678.52 ₹2,035.56 | 655.35 ₹1,966.05 |
| 1.02 | P.B. Work(1:8) | 19.6 | Cubic Meter | 6,952.14 ₹1,36,261.94 | 6,987.41 ₹1,36,953.24 | 6,852.59 ₹1,34,310.76 |
| 1.03 | Plastering(Both Side) (1:6) | 55 | Square Meter | 381.25 ₹20,968.75 | 385.62 ₹21,209.1 | 378.23 ₹20,802.65 |
| 1.04 | Loading & Unloading Materials from surface to U/G | 80 | Tubs | 724.89 ₹57,991.2 | 735.26 ₹58,820.8 | 723.69 ₹57,895.2 |
| 1.05 | Mechanically transport (500-1500m) | 40 | Tubs | 475.89 ₹19,035.6 | 472.56 ₹18,902.4 | 456.99 ₹18,279.6 |
| 1.06 | Lead for carrying Materials ( 7D/11L to 4D-3D/11L)(120m) | 40 | Tubs | 379.52 ₹15,180.8 | 385.96 ₹15,438.4 | 376.45 ₹15,058 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.9 L
EMD Value
₹3,700
Closing Date
21 Feb 2026, 9:00 amClosed
Area Survey Officer
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Re-Construction of Two (02) number Sectionalisation stopping at 11L/4D-3D and 16L/4D-3D in R-IV Seam of Khottadih Colliery, Pandaveswar Area
2026_ECL_352866_1
GM/PND/Sur/Ten/25-26/193/352 Dated 09.02.2026
Open Tender
Civil Works - Others
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,700
5 Mar 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
21 Feb 2026
11 Feb 2026
11 Feb 2026 - 14 Feb 2026
Re-Construction of Two (02) number Sectionalisation stopping at 11L/4D-3D & 16L/4D-3D in R-IV Seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF)
Preparation for site cleaning
P.B. Work(1:8)
Plastering(Both Side) (1:6)
Loading & Unloading Materials from surface to U/G
Mechanically transport (500-1500m)
Lead for carrying Materials ( 7D/11L to 4D-3D/11L)(120m)
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_365662.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid