Loading…
Loading…
Tender Value
₹43.9 L
EMD Value
₹87,799
Closing Date
7 Oct 2026, 11:00 am
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER, MIRIRK ENGINEERING DIVISION, KRISHNA NAGAR MIRIK-734214
Recovery and reconstruction ofRoad from Amit Pradhan House to Dilpali Gaon Road, 9No. Village, Okaity tea Garden Mirik (L 0.45 km)
2026_GTA_5074367_5
NieT04/EE/MED/GTA/2026-27
Open Tender
CIVIL WORKS
Percentage
180 days
Mirik
As per Niet
5 documents required · 5 mandatory
₹0
₹87,799
Yes
23 Sept 2026
23 Sept 2026
9 Oct 2026
23 Sept 2026
7 Oct 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Land Slide Clearance in Soil
Clearance of land slides in soil and ordinary rock by a
bull-dozer D 80 A-12, 180 HP and disposal of the same
on the valley side. | 7,866.73 | cum | 61.8 | ₹4,86,163.91 |
| 2 | Excavation for Structures
Earth work in excavation of foundation of structures
as per drawing and technical specification,
including setting out, removing, spreading or
stacking of spoils within a lead of 150 m. as directed
and including trimming the sides of the trenches,
leveling, dressing and ramming the bottom, and
backfilling with approved material complete as per
direction of the Engineer-in-Charge . | 231.21 | cum | 114 | ₹26,357.94 |
| 3 | Plum concrete work with 40 % cement concrete with 30 mm down graded
stone metal and 60 % stone boulder of size 150 mm and above, placed in
position as directed excluding shuttering if any.
(i) (1:3:6) proportion | 439.28 | cum | 3,304 | ₹14,51,381.12 |
| 4 | Hire and labour charges for Shuttering with or
without staging upto 4.0 m height using approved
stout props with wooden planks/ply wood/steel
sheet plate with required bracing for any kind of
plain or reinforced concrete works in all sorts of
minor structure including culvert, box culvert, crossdrain
etc. The rate is inclusive of fitting, fixing and
striking out after completion of work as per
specification and direction. | 391.5 | sqm | 214 | ₹83,781 |
| 5 | Back filling behind abutment, wing wall and return
wall complete as per drawing and Technical
specification.
A) Granular material | 97.7 | cum | 1,958.05 | ₹1,91,301.49 |
| 6 | Earth work in excavation of foundation of structures
as per drawing and technical specification,
including setting out, removing, spreading or
stacking of spoils within a lead of 150 m. as directed
and including trimming the sides of the trenches,
leveling, dressing and ramming the bottom, and
backfilling with approved material complete as per
direction of the Engineer-in-Charge . | 37.8 | cum | 114 | ₹4,309.2 |
| 7 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 252 | cum | 214.85 | ₹54,142.2 |
| 8 | (II) Cement concrete with 30 mm down graded ballast excluding shuttering. N.B. Variety ( 1:3:6) | 29.4 | cum | 4,608 | ₹1,35,475.2 |
| 9 | Hire and labour charges for Shuttering with or
without staging upto 4.0 m height using approved
stout props with wooden planks/ply wood/steel
sheet plate with required bracing for any kind of
plain or reinforced concrete works in all sorts of
minor structure including culvert, box culvert, crossdrain
etc. The rate is inclusive of fitting, fixing and
striking out after completion of work as per
specification and direction. | 126 | sqm | 214 | ₹26,964 |
| 10 | Earth work in excavation of foundation of structures
as per drawing and technical specification,
including setting out, removing, spreading or
stacking of spoils within a lead of 150 m. as directed
and including trimming the sides of the trenches,
leveling, dressing and ramming the bottom, and
backfilling with approved material complete as per
direction of the Engineer-in-Charge . | 26.4 | cum | 114 | ₹3,009.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
Tendernotice_2.pdf
PDF • 1.32 MB
Tendernotice_3.pdf
PDF • 0.06 MB
BOQ_5160872.xls
BOQ • 0.39 MB
GTAFORM.pdf
Tender Documents • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .