Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | -41.90% | ₹3.7 L | L1 | Admitted-Finance |
| 2 | L2₹3.9 LAdmitted-Finance | -40.26% | ₹3.9 L | L2 | Admitted-Finance |
| 3 | L3₹4.0 LAdmitted-Finance | -37.99% | ₹4.0 L | L3 | Admitted-Finance |
| 4 | L3₹4.0 LAdmitted-Finance | -37.99% | ₹4.0 L | L3 | Admitted-Finance |
| 5 | L4₹4.6 LAdmitted-Finance | -28.99% | ₹4.6 L | L4 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹12,900
Closing Date
18 Mar 2026, 6:00 pmClosed
Er. Sandeep Gupta
XEN
Repair Upgradation of Side drain from St. Peter School road to Hanuman Ji Mandir at Bakshi Nagar
2026_PWDJK_306045_1
eNIT NO. 164 of 2025-26 Dated 12-03-2026
Open Tender
Civil Works
30 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division
₹12,900
1 Apr 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls Under 20 cm wide
roviding and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)
Labour engaged for shifting of dismantled material from working site to dumping site
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Dispola of mulba
Engaged sweeper for cleaning purpose
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_993903.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid