Loading…
Loading…
Tender Value
₹63.0 Cr
EMD Value
₹1.3 Cr
Closing Date
23 Jun 2026, 12:00 pm
Construction of Road Over Bridge with 1 x 60.0 m Camel Back Type Truss Girder + 1 x 24 m composite girder for Railway portion in lieu of LC CP-55, and proposed span of 8 x 25.04 m RCC girder on PPL Gate side and 7 x 25.04 m RCC girder on PPL Plant side for approach portion at Railway Km 491/17-19 between Paradeep and Paradeep Port End stations on the Cuttack-Paradeep line under Khurda Road Division.
CAOCRSPBBS-25-2026
CAOCRSPBBS-25-2026
Open
24 Months
Cuttack, Odisha
₹0
₹1.3 Cr
23 May 2026
23 May 2026
9 Jun 2026
A-Execution of Bridge and approach Sub-Structure Works with service
B-Execution of Bridge and approach superstructure Works 138238802.88 Below/P
C-Supplying fitting & fixing of bearing 3447510.90 Below/P
E-Supply & using of reinforcement Steel 195787776.00 Below/P
F-Execution of All items covered under CPWD/DSRVol. 1 & 2 91235347.58 Below/P
G-Execution of Non-Schedule (NS) Items for construction of ROB &
H-Cost of Non-schedule (NS) item for outsourcing services related to
Item Breakup - A-Execution of Bridge and approach Sub-Structure Works with service road
Using Soil Class SQ2
Mechanical blanketing material by using only hard and durable stone crushed in mechanical crusher to different gradations, wet mixing of the same in designed proportion in Pug mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile, complete as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest correction slips. Note: This item shall be used only when entire constituent of blanketing material is mechanically manufactured by crushing of hard and durable stone into desired gradation of designed proportion. ECOR-CONST-HQ-ENGG/ECOR Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils
Soft rock (not requiring blasting)
Hard rock (blasting prohibited ) Providing and laying in position Plain cement concrete of specified Nominal Mix f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse sand cum (zone-III) : 3 graded stone aggregate 20 mm nominal size)
1:2:4 (1 Cement : 2 coarse sand cum (zone-III) : 4 graded stone aggregate 40 mm nominal size) ECOR-CONST-HQ-ENGG/ECOR
Providing and laying in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment & Pier
Wing wall and Return wall
Abutment cap, Pier Cap, Inspection cum Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc.
Approach slab at formation level, cum Dirt wall/ ballast wall at formation level ECOR-CONST-HQ-ENGG/ECOR
Providing and laying Plain Cement cum Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer.
Providing and fixing Weep Holes in Metre Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge. Boring, providing and installation of bored cast in-situ Reinforced Cement Concrete piles using Hydraulic piling Rig of specified diameter and length below pile cap of specified grade with Design Mix Cement Concrete, using 20mm graded crushed stone aggregate and coarse sand of approved quality, to carry a safe working load not less than specified, concreting by machine batching, machine mixing, scaffolding, using Admixture in approved proportion (as per IS:9103), placing with tremie pipe, chipping off of pile top to remove laitance concrete above cut off level etc., pumping and bailing out water complete in all respect as per approved drawing, specification and direction of the Engineer in charge. Note: 1. Payment for only cement, reinforcement shall be made extra. 2. Length of the pile for payment shall be measured up to the bottom of RCC pile Cap. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
1200mm diameter
Providing, fabricating and installing MT permanent casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. ECOR-CONST-HQ-ENGG/ECOR E x t r a for chiselling in addition to boring of piles, if chiselling is required to be resorted to in hard rock or big stone boulders larger than 30cm, manually or by any other means.
1200mm diameter pile Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer.
Initial load test above 100 ton and Each up to 250 T capacity pile
Extra for every increase of 50 ton in Each pile capacity or part thereof over 250 ton Lateral load testing of single pile in accordance with "IS Code of practice IS:2911 (Part-IV) for determining safe allowable lateral load of pile" with all labour, material, tool & plants, equipment, machinery, etc complete as per drawing and specification as directed by the Engineer.
Piles with lateral load capacity of up Each to 50 ton Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, Sqm e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
All types of bridge super-structures, Sqm e.g. slabs, I-girders, T-girders, Box girders etc. up to 5m above ground level.
Extra for additional height over item Sqm no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof.
Supplying weighing not less than 35 kg each at specified bridge locations. ECOR-CONST-HQ-ENGG/ECOR
Providing and laying of filter media cum consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines.
Supplying, spreading and filling cum coarse sand (no cohesive materials to be used) of approved quality including watering and ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in-charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line etc. complete with contractor's labour, materials, tools and plant.
Providing Boulder Backing behind cum wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra. Painting 2 coats to Bridge Reference / Boards, Structures etc. along track with enamel paint of approved make w ith different colours & letters, as directed by Engineer in-charge.
Miscellaneous Jurisdiction Boards, Structures etc.
Dismantling existing check rail of RM Level Crossing, blocks, bolts & nuts and stacking these in a countable manner near LC, free from any infringements as directed by Engineer in-charge.
Dismantling exiting Rail Height Each Gauge carefully and stacking the released material in countable m a n n e r , free from any infringements as directed by Engineer in-Charge including removal of cement concrete foundation and making surface clean. ECOR-CONST-HQ-ENGG/ECOR
Dismantling existing lifting barrier Set along with winch assembly and other components like boom, fringes, locking arrangements, pedestal, boom rest, locking rods/wires, pulley stakes, turn out wheels, 'A' base and other materials connected with functioning of lifting barrier, removing engineering indicators on track and level crossing road signages without any damage including demolishing concrete base of existing structures, filling, ramming and levelling the ground disturbed during demolition, clearing debris and stacking all released material in a neat and countable manner and clear of infringements, as directed. Note: Barriers on both sides of level crossing constitute one set.
Dismantling existing swing gate MT consisting of two leaves with gate posts, meeting post and stopper post etc. without causing any damage to material and stacking the same near LC gate as directed by Engineer in-charge.
Removal of RCC slab in existing Sqm level crossing portion and in between tracks along with stacking them in countable manner, as directed. Total 130087027.95
Item Breakup - B-Execution of Bridge and approach superstructure Works
With Soffit level up to 9m above Bed cum level ECOR-CONST-HQ-ENGG/ECOR
Providing and launching in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the Precast Prestressed (Post-tensioned) Concrete Girder/Box Girders/Slabs in contactor's casting yard in the vicinity of worksite, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings, specifications and direction of the Engineer. Note: 1. Payment for Shuttering, Cement, Reinforcement, HTS cables, Sheathing, Anchorage Cones, stressing of cables, grouting of the ducts and launching of girder/slab in position shall be made extra under relevant items. However, deduction shall be made in case of slab as per relevant item. 2. For pre-cast item, loading in transport vehicle in casting yard is included and shall not be paid extra. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and fixing in position of standard preformed sealed and slab type or strip seal elastomeric type expansion joints for Railway bridge or Road Over Bridges as per approved drawings and latest MORTH/IRC specifications complete in all respect as directed by Engineer in-charge.
For 40mm expansion
For 80mm expansion Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all lead & lift, etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading material etc. The load shall be 1.25 times the stipulated design load.
For Span design load up to 100 MT ECOR-CONST-HQ-ENGG/ECOR
Extra for every increase of 1 MT or MT part thereof over 100 MT in the span design load capacity up to 800 MT Providing and fixing in position GI Drainage Spouts of required length with Grating in RCC slab and filling bitumen along kerb as shown in drawing with contractor's pipes, bitumen, tools, equipment, lead, lifts etc. complete as per specifications and as directed by Engineer in-charge.
100mm dia. Drainage Spouts
Supplying and laying 160mm dia. Metre PVC Pipes Class-I, capable for a pressure of 2.5 kg/sqm in footpath of ROB for laying cable with all contractor's materials labour, tools, plant, machinery, vehicles, consumables, lead, lift etc. complete as per specifications and as directed by Engineer in-charge. Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E250 conforming to IS:2062, erection / slewing / end launching of steel girders with cranes or any other approved launching methods as per site c o n d i t i o n s (not requiring traffic block) on sub-structure including provision of trolley refuges etc., complete as per approved Q A P and drawings conforming to IRS-B1-2001 and other relevant codes and specifications. Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect except cost of (i) Painting / Metalising; (ii) Bearings & (iii) HSFG bolts which shall be paid extra under relevant item. 3. The payment shall be made on the theoretical weight of main components and gusset plates only. 4. Payment Schedule: (i) Receipt of material at site: 40% (ii) Fabrication of girders: 20% (iii) Erection/Launching: 20% (iv) Completion in all respects: 20%
Plate Girder/Composite Girder (Steel Work)
Open web Girder
Extra for using steel conforming to MT Grade Designation E350 instead of Grade Designation E250 of Quality "B0" as per IS: 2062 ECOR-CONST-HQ-ENGG/ECOR
Supplying and fixing HSFG bolts of Kg any dia and any length with suitable n u t s including DTI washers conforming to IRS-B1-2001 for bridges and s t e e l structures with contractors labour, tools and plants and lead and lift etc., complete. Metallizing of steel work of girders with sprayed aluminium after surface preparation by Sand/grit blasting, followed by one coat of etch primer (IS:5666) & one coat of Zinc Chrome primer (IS:104) and two coats of aluminium paint (IS:2339) with all labour, T&P and material as a complete job duly conforming to all relevant specifications and process given under Clause 39 of IRS-B1-2001. Note: Nominal Thickness of sprayed Aluminium coating shall be 150 microns. DFT of Zinc chrome primer shall be 25-30 microns and DFT of each coat of Aluminium paint shall be 12-14 microns.
On new girder during fabrication
Providing and fixing railing used in Kg rows for footpath or anti-crash barrier railing with B class G.I. pipe 65/50 mm nominal dia including cost of M.S. angle and channels in vertical posts, welding / bolting, priming painting with one coat ready mix Zinc Chromate conforming to IS:104 with DFT of 25- 30Microns, followed by one coat of Zinc Chrome red oxide conforming to IS:2074 with DFT of 25 Microns with all material, labour, T&P as a complete job. Note: Cost of painting shall be paid extra under relevant item.
Supplying and fixing M.S. Angles Kg 65mmx 65mmx 8mm or any other size conforming to IS:2062 in the nosing of steps of stair cases of Foot Over Bridges including provision of 10mm dia, anchor bar 600mm c/c and fixing with main girder with M.S. flat, making anti-slip arrangements over the top of nosing as per approved scheme given by Engineer in charge with all material, labour, T&P as a complete job. Providing and fixing various size HTS holding down bolts conforming to r e l e v a n t Codes/Specification in concrete column or in other structures with proper nuts, bolts, washers/plates, grouting of holes with cement or epoxy concrete with all material, labour, T&P as a complete job.
With Cement Grout. Cost of cement Kg shall be paid extra.
With epoxy concrete grouting. ECOR-CONST-HQ-ENGG/ECOR
Supplying, Fabricating and fixing MT access ladders, inspection platforms, Trolley refuges etc., on bridges with structural steel conforming to IS:2062 including welding / bolting, priming painting with one coat of ready mixed paint of Zinc Chromate (IS:104) with DFT of 25-30 microns followed by one coat of Zinc Chrome Red Oxide (IS:2074) with DFT of 25 microns with all material, labour, T&P as a complete job. Note: Painting shall be paid separately under relevant item.
Supplying fabricating and erecting MT welded and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer-in-c ha rge . Note: The payment shall be made on the theoretical weight of main components and gusset plates only.
Providing and fixing of Drainage Metre Spouts of 110mm UPVC Type A ISI marked (Working pressure 4 kg/sqcm) using suitable clamps and adhesive etc., complete. ECOR-CONST-HQ-ENGG/ECOR
Supplying & fixing Galvanised Steel Sqm Wire Rope net, made of 9mm dia. steel wire rope having aperture size of 45cm x 60cm with 6m long hangs for top anchoring and 5m wide along with chain-link mesh-netting of 80mm x 80mm mesh size made from 2.4mm dia galvanised wire, joining of chain-link mesh & steel wire rope net and joining of adjacent nets with galvanised spiral lock springs of steel wire dia 2.2mm; inner dia. of springs 18mm; total length 50mm ± 0.5mm; pitch 4mm & open end length 60mm including cutting of tree/shrub etc. in rope- netting location and also, excavation / filling-back of trenches in all types of soil after anchoring rope net with RCC pre-cast beam of size 15cm x 15cm x 2m of M-15 concrete & 30cm thick M-10 PCC. This work also includes supply of 200mm x 200mm x 6mm epoxy coated washer plates with 12.5mm / 18mm dia. hole at centre and supplying & fixing of anchor bolts/fasteners of 10mm dia. including drilling of holes up to a depth of 110mm in rock; cleaning of holes; fixing of fasteners with nut & epoxy coated washer plates; applying torque 65 to 70 N/mm for fixing of rope net for intermediate anchoring on the surface of cutting, bottom anchoring up to 1m depth by using 16mm dia. HYSD steel bolts, threaded up to 200mm on top and fixing epoxy coated washer plate, fabrication & fixing of U-pin on top o f cutting for top anchoring and joining of adjacent nets with spiral spring and fixing at the ratio of 1 no. per 0.6m in longitudinal direction of net portion and additional locks for lacing chain link netting with rope net with contractor's materials, machinery, tools & plants, cement, steel, labour, lead, lift, transportation, ascent, descent, taxes, royalty etc. complete as per directions of engineer-in-charge. Note: Concrete will be paid separately under relevant item. ECOR-CONST-HQ-ENGG/ECOR
Fabrication, supplying and fixing Each 600mm x 450mm Bridge Board made from 16 SWG MS Sheet duly welded or riveted to back support of two 600mm long horizontal angles of size 25mm x 25mm x 3mm & two numbers 2.5 metre long vertical support of MS Angle of size 50mm x 50mm x 5mm, welded / rivetted to board. Vertical supports shall have split ends for proper fixing in ground. Vertical supports of board shall be embedded in ground in M 20 Cement Concrete blocks of size 300mm x 300mm x 300mm, complete job including painting & writing of subject matter on bridge board, as directed by Engineer - In charge Note: Excavation & concrete work will be paid separately. Total 138238802.88
Item Breakup - C-Supplying fitting & fixing of bearing
Design, manufacturing, supplying Cubic and fixing in position elastomeric Centimetre b e a r i n g true to line and level conforming to IS:3400, IS:226, BS- 5400 under prestressed concrete girders/ Steel Girders, for Pre-cast as well as cast-in-situ girders as per approved drawing. The rate shall include cost of load test of one no. bearing from Railway approved firms and all fixing materials, equipments, machineries, labour, taxes, loading, unloading, leading, lifting etc. complete. Rates include getting the drawing approved from Railway and cost of inspection during manufacturing from railway approved organization.Note : 1. The rate is for finished item complete and paid only after fixing in position below the girder. 2. The volume shall be as given in the drawing and no deduction shall be made for inserted steel plates etc. ECOR-CONST-HQ-ENGG/ECOR Design, supply, fitting and fixing in position true to line and level POT- PTFE bearing of 250 MT Capacity, consisting of a metal piston supported by a disc or un reinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel / fabricated structural steel, metal and elastomer elements complete as per IS:2062, IS:1030, AISI:304, AISI:316, IS:6911, BS:3784, IS:3400, IS:226, BS-5400, Bridge Code and as per approved drawing and Technical Specifications. The design of the bearings shall be submitted by the manufacturers / contractor and got approved from Railway before fixing. Test report after inspection of the bearings shall be submitted and got approved before the materials are lifted from the manufacturer premises.
POT-cum -PTFE Bearing (Free end)
POT Bearing-Fixed Type
POT-cum -PTFE Guided (L)Bearing
POT-cum -PTFE Guided (T)Bearing Total 3447510.90
Item Breakup - D-Supply and using of Cement
Ordinary Portland Cement 53 grade MT of approved brands/makes
Pozzolana approved brands/makes Total 45243013.45
Item Breakup - E-Supply & using of reinforcement Steel
Thermo-Mechanically Treated bars Kg of grade Fe-500D or more of approved brands/makes. Total 195787776.00
Item Breakup - F-Execution of All items covered under CPWD/DSRVol. 1 & 2
Item Breakup - G-Execution of Non-Schedule (NS) Items for construction of ROB & approaches.
Construction of Reinforced Earth Sqm Structure with the construction of earthwork in layers, assembly & erection of reinforcing element & placement of facia panels and all associated components complete as per drawings and Technical specifications sections 3100 as directed by Engineer. Providing and erecting precast concrete facia panels including un tensioned reinforcement, soil reinforcing element, foundation pad, all accessories and consumables and components including drainage system, ground improment, capping beam, if required complete. ECOR-CONST-HQ-ENGG/ECOR
Construction of Reinforced Earth cum Structure with the construction of earthwork in layers, assembly & erection of reinforcing element & placement of facia panels and all associated components complete as per drawings and Technical specification sections 3100 as directed by Engineer. Earthwork including excavation, back filling, grading and compaction with selected back fill soil (30 & Y 1.8 gm/cc) meeting approved design parameters in layers in soil reinforced zone complete.
Construction of Reinforced Earth cum Structure with the construction of earthwork in layers, assembly & erection of reinforcing element & placement of facia panels and all associated components complete as per drawing and Technical specifications section 3100 as directed by Engineer 600 mm thick filter media behind concrete facia panel. Providing and laying of Filter media with granular materials/Stone crushed aggregates satisfying the requirement laid down in clause 2504.2 2 of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm conditions complete as per drawing and Technical Specification.
Stud shear connector - supplying. Numbers 2500Nos manufacturing, fabrication testing and welding with welded by STUD welding machine (with all contractor consumable) compatible with type of STUD on composite steel girder, conforming to IS:3935- 1966 of diameter 25 mm and height 200mm and as per RDSO drawing no. RDSO/B-11754/R3& 11751/R3 with all alteration and as pet approved drawing of railway and as per direction of Engineer-in charge inclusive all. The stud should pass the test prescribed in above mentioned drawing. Total 25641332.70
Item Breakup - H-Cost of Non-schedule (NS) item for outsourcing services related to Land Acquisition
Comprehensive Land Acquisition Each Liaison Services under Railways Bridge (Amendment) Act, 2008 including Site office, all category of Man power (Land expert, Legal expert, Amin & Chainman etc.), Camp for public consultation, boundary making and fixing of stone with supervision charges involving below activities: 1. PRE-ACQUISITION ACTIVITIES (Sections 20-A to 20-D) 1.1 Land Survey and Verification (Section 20-A Support) 1.2 Stakeholder Consultation and Documentation 1.3 Survey Operations Support (Section 20-B) 1.4 Damage Assessment and Compensation (Section 20-C) 1.5 Objection Management (Section 20- D) 2. DECLARATION PROCESS (Section 20-E) 2.1 Declaration Documentation 2.2 Publication and Notification 3. COMPENSATION AND ACQUISITION (Sections 20-F to 20-I) 3.1 Valuation and Compensation (Sections 20-F & 20-G) 3.2 CALA and Arbitration Support 3.3 Payment and Possession (Sections 20-H & 20-I) 4. POST-ACQUISITION ACTIVITIES 4.1 Land Transfer and Mutation 4.2 Final Demarcation and Handover 4.3 Compliance and Reporting 4.4 Fixing if Boundary stone Payment Schedule: i) 40% of the accepted rate will be made after completing Section -11/20A to 20-D. ii) 20% will be released on clearing Section - 20- E (iii) 20% on clearing Section - 20-F (iv) 20% in the Final bill after completing all land acquisition work, including mutations of land to the name of the Railway Total 631880.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Reference DWG 60m OWG RDSO 10444
ATTACHMENT
e tender Special Condition
ATTACHMENT
LASpecialConditionLCCP-55.pdf
ATTACHMENT
ReferenceDWG60mOWGRDSO-10444.pdf
ATTACHMENT
etenderSpecialConditionforLCCP-55.pdf
ATTACHMENT
ReferenceDWG24mCGRDSO-B-11780.pdf
ATTACHMENT
etenderDocumentforLCCP-55.pdf
ATTACHMENT
Download all tender documents and submit your bid