| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹48.5 LAccepted-Finance GOKULPURI GADHI ROAD ELECTRIC POWER LAKHIMPUR KHERI | KHERI | UTTAR PRADESH | 261501 | ₹48.5 L | 1 | Accepted-Finance 1ST LOWEST |
| 2 | 2₹48.8 LRejected-Finance GRAM POST LAGUCHA DISTRICT LAKHIMPUR KHERI UTTAR PRADESH | KHERI | UTTAR PRADESH | 261501 | ₹48.8 L | 2 | Rejected-Finance 2ND LOWEST |
| 3 | 3₹51.1 LRejected-Finance | ₹51.1 L | 3 | Rejected-Finance 3RD LOWEST |
| 4 | 4₹51.2 LRejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹51.2 L | 4 | Rejected-Finance 4TH LOWEST |
| 5 | 5₹51.8 LRejected-Finance | ₹51.8 L | 5 | Rejected-Finance 5TH LOWEST |
| Sl No | Description | Qty | Unit | M/S J.P. INTERPRISES L6 | M/S KAPOOR TRADERS L3 | SHIVAM ENTERPRISES L4 | SUMAN TIWARI CONTRACTOR L1 | Adi shakti construction L5 | Jagat Construction L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing brick work in boundary wall manually / by mechanical means including stacking of servicable material and disposal of unserviceable material within 50 m lead as per direction by the Engineer-in-charge | 39.33 | m³ | 962.36 ₹37,849.5 | 750 ₹29,497.5 Lowest | 850 ₹33,430.5 | 810.97 ₹31,895.65 | 900 ₹35,397 | 847.96 ₹33,350.09 |
| 2.00 | Removal of mortar from dismantled brick brushing and stacking of material with in 50 metres lead as per direction of Engineer-in-charge. | 3,980 | Nos | 3.19 ₹12,681.08 | 2 ₹7,960 Lowest | 2.6 ₹10,348 | 2.69 ₹10,686.3 | 3 ₹11,940 | 2.81 ₹11,173.6 |
| 3.00 | Excavation for making pile bore of 300 m dia and 1.50 m depth including all labour, T&P etc complete in all respect as per directions of E/I | 224 | Nos | 467.25 ₹1,04,664 | 390 ₹87,360 | 325 ₹72,800 Lowest | 366.4 ₹82,073.6 | 445 ₹99,680 | 411.7 ₹92,221.92 |
| 4.00 | Earth Work in foundation of masonary work including lead upto 30 meter and lift up to 1.50 meter .and its disposal and back filling As per direction of Engineer-in-Charge. | 388.85 | m³ | 209.67 ₹81,530.18 | 190 ₹73,881.5 | 200 ₹77,770 | 195.21 ₹75,907.41 | 200 ₹77,770 | 188.99 ₹73,489.62 Lowest |
| 5.00 | Centering and shuttering for R.C.C. Work incluing rent of shuttering material ,labour and T&P required for proper completion of work for slab and wall etc. | 1,020.35 | Sqm | 780.64 ₹7,96,526.02 | 765 ₹7,80,567.75 | 700 ₹7,14,245 Lowest | 767.31 ₹7,82,926.8 | 800 ₹8,16,280 | 746.56 ₹7,61,750.86 |
| 6.00 | Providing and laying steel reinforcement with cutting bending and binding including cost of steel and binding wire placing in proper position & T&P etc required for proper completion of work. | 11,061.39 | kg | 72.57 ₹8,02,725.07 | 79 ₹8,73,849.81 | 70 ₹7,74,297.3 | 71.33 ₹7,89,020.01 | 70 ₹7,74,297.3 | 69.4 ₹7,67,679.27 Lowest |
| 7.00 | R.C.C. 1:1½:3 in pillar beam lintel with crushed stone grit & coarse sand .Including all labour T&P etc. Requird for proper completion of work. | 85.02 | m³ | 7,977.51 ₹6,78,247.73 | 8,100 ₹6,88,662 | 8,100 ₹6,88,662 | 6,834.4 ₹5,81,060.69 Lowest | 7,500 ₹6,37,650 | 7,109.05 ₹6,04,411.22 |
| 8.00 | Brick work with 1:4 cement morter including all cost of material labour T&P etc required for completion of work . | 254.41 | m³ | 5,746.33 ₹14,61,923.69 | 5,200 ₹13,22,932 | 5,500 ₹13,99,255 | 5,191.07 ₹13,20,659.15 | 5,500 ₹13,99,255 | 5,063.23 ₹12,88,135.46 Lowest |
| 9.00 | Supplying and fixing of angle iron ISA 50X50X6 mm placed every 3.00 m c/c embeded in C.C in depth of 0.45 m and every corner end every 15 th post shall be strutted on both side including cutting drilling holes riveting as necessary with one of red oxide primer and its carriage upto site i/c cost od all mtterial labour T&P etc required for proper completion of work. | 1,366.2 | kg | 94.69 ₹1,29,362.75 | 90 ₹1,22,958 | 80 ₹1,09,296 Lowest | 84.36 ₹1,15,250.45 | 90 ₹1,22,958 | 84.38 ₹1,15,279.85 |
| 10.00 | Providing barbed iron wire fencing i/c fixing it to post after stretching it including labour T&P etc equired for proper completion of work. | 3,605.7 | RM | 16.72 ₹60,287.3 | 15 ₹54,085.5 | 15 ₹54,085.5 | 14.9 ₹53,710.51 Lowest | 15 ₹54,085.5 | 14.9 ₹53,724.21 |
Tender Value
₹62.2 L
EMD Value
₹1.3 L
Closing Date
15 Jun 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 03
2026_UPIDC_1157895_3
03/SE-XII/2026-27
Open Tender
Civil Works
Fixed-rate
120 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,448
₹1.3 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
21 Jul 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work in boundary wall manually / by mechanical means including stacking of servicable material and disposal of unserviceable material within 50 m lead as per direction by the Engineer-in-charge | 39.33 | m³ | - | - |
| 2 | Removal of mortar from dismantled brick brushing and stacking of material with in 50 metres lead as per direction of Engineer-in-charge. | 3,980 | Nos | - | - |
| 3 | Excavation for making pile bore of 300 m dia and 1.50 m depth including all labour, T&P etc complete in all respect as per directions of E/I | 224 | Nos | - | - |
| 4 | Earth Work in foundation of masonary work including lead upto 30 meter and lift up to 1.50 meter .and its disposal and back filling As per direction of Engineer-in-Charge. | 388.85 | m³ | - | - |
| 5 | Centering and shuttering for R.C.C. Work incluing rent of shuttering material ,labour and T&P required for proper completion of work for slab and wall etc. | 1,020.35 | Sqm | - | - |
| 6 | Providing and laying steel reinforcement with cutting bending and binding including cost of steel and binding wire placing in proper position & T&P etc required for proper completion of work. | 11,061.39 | kg | - | - |
| 7 | R.C.C. 1:1½:3 in pillar beam lintel with crushed stone grit & coarse sand .Including all labour T&P etc. Requird for proper completion of work. | 85.02 | m³ | - | - |
| 8 | Brick work with 1:4 cement morter including all cost of material labour T&P etc required for completion of work . | 254.41 | m³ | - | - |
| 9 | Supplying and fixing of angle iron ISA 50X50X6 mm placed every 3.00 m c/c embeded in C.C in depth of 0.45 m and every corner end every 15 th post shall be strutted on both side including cutting drilling holes riveting as necessary with one of red oxide primer and its carriage upto site i/c cost od all mtterial labour T&P etc required for proper completion of work. | 1,366.2 | kg | - | - |
| 10 | Providing barbed iron wire fencing i/c fixing it to post after stretching it including labour T&P etc equired for proper completion of work. | 3,605.7 | RM | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_2170056.xls
BOQ • 0.28 MB
TD3.pdf
Tender Documents • 2.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].