Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance JAMMU JAMMU AND KASHMIR | JAMMU | JAMMU AND KASHMIR | 180001 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹147.31 (0.05%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹8,850
Closing Date
28 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
STORAGE TANK FOR SPRING WATER AT ST BASTI SHEHILNAG BLOCK SHAHABAD
2026_RDPR_317094_9
ENIT72of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹8,850
29 Jul 2026
21 Jul 2026
29 Jul 2026
21 Jul 2026
28 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earthwork in trench excavtion | - | cum | - | - |
| 0.0 | P/L OF stone soling hand packed tightly i/c carriage by MT And 100 mtr HL | 1 | cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using (1:4:8) and by using 20 mm down aggregates. | - | Cum | 1 | - |
| 0.0 | Providing and laying Reinforced cement concrete of specified grade excluding the cost of centering & shuttering using M20 mix. by using 20 mm down aggregates. Raft | - | Cum | 1 | - |
| 0.0 | Providing and laying Reinforced cement concrete of specified grade excluding the cost of centering & shuttering using M20 mix. by using 20 mm down aggregates.walls | 1 | Cum | - | - |
| 0.0 | steel reinforcement for RCC | 1 | cum | - | - |
| 0.0 | 15MM THICK PLASTER IN 1:3 | - | cum | 1 | - |
| 0.0 | Centering/ shuttering incl.propping,strutting & removalof same RAFT | - | SQM | - | - |
| 0.0 | Centering/ shuttering incl.propping,strutting & removalof same WALLS | 1 | SQM | - | - |
| 0.0 | Centering/ shuttering incl.propping,strutting & removalof same SLAB | 1 | SQM | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1037745.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .