| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance 119 RABINDRA PALLY KOLKATA 700084 | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | ₹2.7 L | L1 | Accepted-Finance LOWEST BIDDER |
| 2 | L2₹2.8 L+₹6,475 (2.36%)Rejected-Finance BUDGE BUDGE J S BAD JIBANTALA SOUTH 24 PARGANAS WEST BENGAL 743376 | JIBANTALA | SOUTH 24 PARGANAS | WEST BENGAL | 743376 | ₹2.8 L+₹6,475 (2.36%) | L2 | Rejected-Finance QUOTED RATE HIGH |
| 3 | L3₹2.8 L+₹9,465 (3.45%)Rejected-Finance 10 15 5A BIJAYGARH KOLKATA 700092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | ₹2.8 L+₹9,465 (3.45%) | L3 | Rejected-Finance QUOTED RATE HIGH |
Tender Value
₹2.7 L
EMD Value
₹5,500
Closing Date
2 Jul 2026, 5:00 pmClosed
EE/WS/JU/BR-XI
Baghajatin Market Complex Unit-III,Baghajatin Station Road, Kolkata-700086
LAYING OF 100 MM DIA DI W.S PIPE LINE FROM 228/1 TO 145 BRIJI WEST IN WARD NO 110.
2026_KMC_1027253_1
EE(WS)/BR-XI/NIeT/05/2026-27
Open Tender
CIVIL WORKS
Percentage
12 days
WARD NO-110
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,500
22 Jul 2026
9 Jun 2026
6 Jul 2026
13 Jun 2026
2 Jul 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.4 Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C | 2 | EACH | 1,867 | ₹3,734 |
| 2 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.11 Hire and labour charges for coloured and twisted cloth rope fencing as per design approved by Engineer-in-charge one line with 100 mm dia Eucalyptus or bamboo posts 0.60 m above G.L and 300 mm below G.L 1.50 m apart fitted and fixed complete including painting with white zinc painting (2 coat) complete.Payment of painting to be made seperately. | 220 | METER | 20 | ₹4,400 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.14 Signalling arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | 11 | Daily | 202 | ₹2,222 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.12 Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made separately. (i) 600 mm. x 450 mm. size of board. | 2 | EACH | 427 | ₹854 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 27.54 | CUBIC METER | 636 | ₹17,515.44 |
| 6 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 165.24 | CUBIC METER PERCENT | 119.27 | ₹19,708.17 |
| 7 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 upto 5km | 220 | METER% | 2.61 | ₹574.2 |
| 8 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 per km beyond 5km to 10km | 2,200 | METER% | 0.19 | ₹418 |
| 9 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 per km beyond 10km to 20km | 4,400 | METER% | 0.16 | ₹704 |
| 10 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.2 Lowering any type of Ductile Iron (DI) pipes & specials and laying along trench at any depth as per speclfication and direction of the Engineer-incharge, ( laying over ground. the rates shall be, reduced by 10% and the rates so reduced shall be inclusive of cost of all sorts of holding arrangements]Diameter in mm 100mm dia. | 220 | METER% | 14 | ₹3,080 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
TBID.pdf
Tender Documents • 1.44 MB
BOQ_2523418.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .