Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹6.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹6.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance NAGAR NIGAM KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | -15.00% | ₹6.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance 135 K M 2 IIT KANPUR KALYANPUR | -15.00% | ₹6.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance 117 705 O BLOCK GEETA NAGAR MODI CHAURAHA KANPUR | -15.00% | ₹6.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.6 L
EMD Value
₹75,519
Closing Date
14 Aug 2026, 3:00 pmClosed
Chief Engineer
Office Motijheel Nagar Nigam Kanpur
Nala covered work from khyura at surh vihar dinesh tailor to rajkiy mahila bal grah under Ward-44 Zone-6
2026_NNKAN_1171430_2
125/AA-6/2026-27
Open Tender
Civil Works
Fixed-rate
45 days
Ward-44
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹75,519
21 Sept 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Class-150 brick work in 1:4 cement and coarse send in foundation including supply of all materails labour and tools and plants etc. required for proper completion of the work. | 4.54 | Cum | 6,600 | ₹29,964 |
| 2 | 12mm thick cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal 1 cement : 4 fine sand etc. all comp work | 79.4 | Sqm | 182 | ₹14,450.8 |
| 3 | RCC work sith cement aproved coarse sand and 2 cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 (1cement :6 aggregate) in columns etc. all comp work | 41.44 | Cum | 8,720 | ₹3,61,356.8 |
| 4 | Mild steel or iron in plain work such as reinforced concrete of reinforced brick work 12mm to 32 mm for the etc. all comp work | 3,253.04 | Kg. | 72 | ₹2,34,218.88 |
| 5 | TAX18% | 1 | TaX | 1,15,198.29 | ₹1,15,198.29 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
BOQ_2209340.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .