Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | ₹3.0 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Vidyadharan Krishnan Nair L1 |
|---|---|---|---|---|
| 1.00Civil works | ||||
| 1.01 | Loading & unloading of 9 m psc and squre pole | 2 | Each | 1,200 ₹1,200 |
| 2.01 | Transporting of 9m psc and squre pole from Road side to pole pit up to 2 KM | 2 | Each | 1,600 ₹1,600 |
| 3.01 | Excavation of pole pit in Rocky ground 9 m psc pole | 2 | Per Pit | 2,000 ₹2,000 |
| 4.01 | Erection of 9 m,PSC pole | 2 | Per pole | 1,600 ₹1,600 |
| 5.01 | Loading & unloading of 8 m psc pole | 30 | Each | 12,000 ₹12,000 |
| 6.01 | Transporting of 8m psc and squre pole from Road side to pole pit up to 2 KM | 30 | Each | 18,000 ₹18,000 |
| 7.01 | Excavation of pole pit in Rocky ground 8 m Psc and Rcc pole | 30 | Per Pit | 22,500 ₹22,500 |
| 8.01 | Erection of 8 m,PSC pole | 30 | Per pole | 16,500 ₹16,500 |
| 9.01 | Fixing of 3Q X arm | 1 | Each | 200 ₹200 |
Tender Value
Refer Docs
EMD Value
₹2,961
Closing Date
13 Jan 2026, 2:00 pmClosed
EE/D/KZI
EE/D/KZI
EE/D/KZI/ETW-50/25-26/30.12.25
2026_EB_638624_1
EE/D/KZI/ETW-50/25-26/30.12.25
Open Tender
Electrical Works
120 days
EE/D/KZI
As per Spec
3 documents required · 3 mandatory
₹0
₹2,961
Yes
26 Feb 2026
2 Jan 2026
14 Jan 2026
2 Jan 2026
13 Jan 2026
2 Jan 2026
2 Jan 2026 - 13 Jan 2026
Loading & unloading of 9 m psc and squre pole
Transporting of 9m psc and squre pole from Road side to pole pit up to 2 KM
Excavation of pole pit in Rocky ground 9 m psc pole
Erection of 9 m,PSC pole
Loading & unloading of 8 m psc pole
Transporting of 8m psc and squre pole from Road side to pole pit up to 2 KM
Excavation of pole pit in Rocky ground 8 m Psc and Rcc pole
Erection of 8 m,PSC pole
Fixing of 3Q X arm
Fixing of SQ X arm
Dismantling & Re-Fixing of 3Q Xarm
Dismantling & Re-Fixing of SQ X arm
Dismantling & Re-Fixing of 3.5, 4.5 V X arm
Dismantling & Re Fixing of HT/LT 'TI' Fittings
Fixing of LT Pin Insulater
Fixing of LT shackle
Fixing of Aluminium knob
Dismantling & Re Fixing of HT Pin Insulater
Dismantling & Re Fixing of LT Pin Insulater
Dismantling & Re Fixing of LT shackle
Dismantling & Re Fixing of Aluminium knob
Dis & Redoing of S phase connection
Dis & Redoing of 3 phase connection
Dismantiling Re-Erection of CFL &72 W LED light fittings
Dismantling & Re-fixing of street light switching point arrangement
Excavation of stay pit on rocky ground
Erection of stay set complete
Dismantling and re Erection of stay set complete
Dismantling & Re Erection of stay set complete with stay pit on rocky ground
Stringing of HT line 7/4.09 ACSR mm pin point
Stringing of HT line 7/4.09 ACSR mm cut point
Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR pin point
Stringing of LT line7/3.15 AAAC or 7/3.35 ACSR cut point
Dismantling & re Stringing of HT line 7/3.15 AAAC or 7/3.35 ACSR pin point
Dismantling & re Stringing of HT line 7/3.15 AAAC or 7/3.35 ACSR cut point
Dismantling & re Stringing of HT line 7/4.09 ACSR mm pin point
Dismantling & re Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR pin point
Dismantling & re Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR cut point
Dismantling & re Stringing of LT line 7/3.15 AAAC or 7/3.35 ACSR pin point
Dismantling & re Stringing of LT line7/3.15 AAAC or 7/3.35 ACSR cut point
Set right and leaning of LT pole
Loading & unloading of line materials
Transporting line materials from substore to section office and office to work spot 800+800
Drilling / Less than 23mm holes per hole / Slatted holes of slotted holes
OrdinaryTree Clearance
Coconut Tree Clearance
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 0.17 MB
BOQ_764299.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid