| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 Cr+₹34,336.38 (0.34%)Rejected-Finance NO 30 PERIYAR NAGAR ERODE 638001 | ERODE | TAMIL NADU | 638001 | ₹1.0 Cr+₹34,336.38 (0.34%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SEA ROCK INFRASTRUCTURE L2 | SMT CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Strenthening the road from Ottarakarattupalayam karattupalayam road (via) koramadai km 0/0-1/510 H/o Karattupalayam (R-81) (Using Plastic waste ) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 1,958.4 | Sqm | 7.5 ₹14,688 | 6.5 ₹12,729.6 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning | 1,885 | Sqm | 24 ₹45,240 | 23 ₹43,355 Lowest |
| 4.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | 437.4 | cum | 141 ₹61,673.4 | 140 ₹61,236 Lowest |
| 5.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 6.00 | Km 0/0-1/0 | 72 | cum | 558 ₹40,176 | 557 ₹40,104 Lowest |
| 7.00 | Km 1/0-1/510 | 27.9 | cum | 570 ₹15,903 | 569 ₹15,875.1 Lowest |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 714.02 | cum | 2,369 ₹16,91,513.38 | 2,368 ₹16,90,799.36 Lowest |
| 9.00 | Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 5,712.13 | Sqm | 86.5 ₹4,94,099.25 | 85.5 ₹4,88,387.12 Lowest |
| 10.00 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 5,712.13 | Sqm | 21.25 ₹1,21,382.76 | 20.25 ₹1,15,670.63 Lowest |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Project Director
DRDA, Collectorate, Erode
Erode District Strengthening of the Road 2 No in Package No TN 12-23 Nambiyur Block under NABARD 2026-27
2026_RDTN_657397_1
Roc.No.692/2026/A5 dt.12.02.2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Nambiyur Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.0 L
20 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .