| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-Finance | ₹2.3 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.4 CrRejected-Finance | ₹2.4 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.5 CrRejected-Finance | ₹2.5 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹2.5 CrRejected-Finance 78 2 23 B ROY RD WES T CAL 61 700061 | KOLKATA | KOLKATA | WEST BENGAL | 700061 | ₹2.5 Cr | L4 | Rejected-Finance L4 |
Tender Value
₹2.3 Cr
EMD Value
₹4.7 L
Closing Date
7 Feb 2026, 12:00 pmClosed
THE D.G. (ROADS)
OFFICE OF THE D.G. (ROADS) ROADS DEPARTMENT KOLKATA MUNICIPAL CORPORATION 5/2 , CHOWRINGHEE PLACE KOLKATA-700 013 WEST BENGAL
DEVELOPMENT AND WIDENING OF MAHATMA GANDHI ROAD FROM D.H. ROAD JUNCTION TO GURU NANAK PLY WOOD UNDER BR-XVI
2025_KMC_973532_1
KMC/ROADS/SOUTH/2023-2024/417
Open Tender
CIVIL WORKS
360 days
MAHATMA GANDHI ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4.7 L
OFFICE OF THE D.G. (ROADS) ROADS DEPARTMENT
27 Feb 2026
29 Dec 2025
10 Feb 2026
29 Dec 2025
7 Feb 2026
7 Jan 2026
3 Jan 2026
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) PWD (Rds & Brdgs)-2018 It. No. 3.04 Page No.237
Loosening, leveling and compacting original ground supporting embankment to faciliate placement of first layer of embankment, scarified to a depth of 150mm mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per clause 305.3.4 of specifications for road & bridge works of MORT&H (5th revision) PWD,w.b schedule of rates 2018/item no-3.17(b)/page.no-240
Loosening, leveling and compacting original ground supporting embankment to faciliate placement of first layer of embankment, scarified to a depth of 150mm mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per clause 305.3.4 of specifications for road & bridge works of MORT&H (5th revision) PWD,w.b schedule of rates 2018/item no-3.17(b)/page.no-240
Loosening, leveling and compacting original ground supporting embankment to faciliate placement of first layer of embankment, scarified to a depth of 150mm mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per clause 305.3.4 of specifications for road & bridge works of MORT&H (5th revision) PWD,w.b schedule of rates 2018/item no-3.17(b)/page.no-240
22.Construction of gullypit 1100mmX625mm. inside measurement and depth of invert 1500mm. below G.L. with 250mm. thick cement brick work (1:4) over 100mm. thick jhama cement concrete (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing, brickon-edge flooring in the invert, 20 mm. thick cement plaster (1:4) finished fine with 1.5 mm. thick neat cement in the inside of walls and invert including supplying, fitting and fixing R.C.P.C. gully grid (15-M.T.load bearing capacity) and 225 mm. dia. C.I. Syphone including cutting hard crust, excavation, dewatering, back filling and removal of spoils as per standard drawing UDMA.SEWERAGE & DRAINAGE:WEF_051018
Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(i) 225 mm PWD SANITARY & PLUMBING WORKS_WEF 01.11.2017,PAGE-66 ITEM-15(ii)
Manhole connection (upto 450 mm. dia.) including mending good all complete with (1:2:4) cement concrete as per specification and direction of Engineer-in-charge.... DEPTT OF UD & MA,GOVT OF W.B PAGE-23 ITEM NO-14
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety PWD (Bldg.)-2017, page-24 (item -4(a), consumption chart pg-B-60, sl-1 and Annexture-II , Format-A, 3rd Corrigenda & addenda p-10 dtd-04.06.2018, PWD(R&B) 2018, Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226,
First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out joints etc. complete including cost and carriage of all materials. (b) In 1:6 proportion PWD (Rds & Brdgs)-2018, It. No. 18.06, Page No. 332, page-222 sl-5 (a), pg-B-49 sl-21
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar (b) 15 mm thick plaster PWD (Bldg.)-2017, It. No. 1, Page No. 189 & 3rd Corrigenda Addenda dtd-04.06.18, P-49 & 50
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. PWD (Bldg.)-2017, It. No. 15, Page No. 192
Supplying & laying Double Wall Corrugated (with external annular corrugation and smooth internal walls) High Density Polyethelene Pipes conforming to IS 16098 (Part-II):2013 having Stiffness Class of SN 8 with Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR value not more than 10% including necessary jointing materials for nonpressure underground Drainage, Sewerage & Cross drainage application.iv) 300 mm internal dia. PWD.SANITARY AND PLUMBING 2017 PAGE -23, ITEM NO- 36-(IV)
Supply of High Density Poly-ethylene Pipe conforming to IS - 4984 - 1985 (Dia) [PE - 63] A. 6 Kg / Sq.Cm. (Working Pressure) - 50 mm PWD.SANITARY AND PLUMBING 2017 PAGE -19, ITEM NO- SECTION (A)(A)(II) -20 (A).
Labour for fitting and fixing high density poly-ethylene pipes or P.V.C. pipes for above ground work including cost of jointing materials paints etc. fitting and fixing all necessary specials, cutting pipes, making threads, cutting holes in walls or R.C. floor where necessary and mending good all damages excluding the cost of masonry or concrete work, if necessary, but including the cost and fitting and fixing holder bat clamps(any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer-in-charge. (Payment will be made on centre line measurement of the total pipeline including specials. ) PWD.SANITARY AND PLUMBING 2017 PAGE -11, ITEM NO- SECTION (A)(A)(II) -18(A-VI)
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required. PWD (Rds & Brdgs)-2018, Page No. 332, It. No. 18.05
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. PWD (Bldg.)-2017, It. No. 40, Page No. 43 Annexture-I , Format-B, & 2nd Corrigenda Addenda dtd-04.06.2018, p-1,2, I-43
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety PWD (Bldg.)-2017, page-26 (item -10(i), consumption chart pg-B-60, sl-3 and Annexture-II , Format-A, 3rd Corrigenda & addenda p-13 dtd-04.06.2018, PWD(R&B) 2018, Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226,
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation. PWD (Bldg.)-2017, It. No. 3, Page No.1
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (a) For Fine Sand PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-3
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40) PWD (Rds & Brdgs)-2018, It. No. 4.09 Page No.247 & page-222 sl. No- 2 & 5 (g)
Raising manhole cover and frame with CBW (1:4), 375 mm thick up to 100mm high with 20mm thick sand and cement plaster including finishing with neat cement after cutting the asphaltum pavement and taking out and re-fixing the existing manhole cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13)
Raising gully pit cover and frame with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster with neat cement after dismantiling the existing setting and taking out and refixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13)
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D) (i) 35 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size.Cover: 700 mm X 100 mm Frame: 910 mm X 185 mm opening: 560mm Weight: 245 kg (approx) PWD.SANITARY AND PLUMBING 2017 91-B.B.IV.8(i)
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D) (viii) 5 MT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size (viii) 5 MT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover: 470 mm X 420 mm X 80 mm Frame: 590 mm X 550 mm X 170 mm opening: 380mm x 305mm Weight: 100 kg (approx) PWD.SANITARY AND PLUMBING 2017 92-B.B.IV.8(viii)
Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. (a) By manual means : (iii) Above 100 mm thick. PWD (Rds & Brdgs)-2018, It. No. 18.02 Page No.331
Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting. guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work) , page-249(item- 4.12) & 212(table3.3-1) and 4th Addenda & Corrigenda
PRIME COAT :Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i)For WBM / WMM Surface:®(with primer @ 0.70-1.0 kg/sqm) Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.01)
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10
Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226,
Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226,
Supplying and laying factory made Vertical Kerb Stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated, size 500mm X 450mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (Forr Road-Diveder) Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226,
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. PWD (Bldg.)-2017, It. No. 13, Page No.12
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work).c) (iii) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including the cost of carried earth. PWD (Bldg.)-2017, It. No. 3, Page No.1
Tack Coat: Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular Surfaces treated with primer (Using Bitumen Emulsion at the rate of 0.25 to 0.30 kg per sqm.) Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.02)
DENSE BITUMINOUS MACADAM [Using Bitumen VG-40 (30/40)] Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregate of specified grading, filler(Cement /hydrated lime / Rock dust) premixed with bituminous binder of approved grade @4.0% (min) for Grading -1 and 4.5% (min) for Grading -2 by weight of total mix as per table 500-10 and mix design done as per table 500-11 and job mix formula as per clause 505.3.3 of MoRT&H (5th Revision), including screening, cleaning of chips, transporting the hot mix to work site, laying the mixed materials at specified laying temperature, as specified in Table 500-2 with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled and vibratory or tandem rollers or with a pneumatic tyre roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 Mpa, to achieve the desired density as per clause 505.3.5, all including cost and carriage of bitumen, crushed aggregates, filler materials and hire charges of machinery and equipment for construction and quality control complete as per Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). A. For Grading 1 (37.5 mm nominal size, 75-100 mm thick.) (i) Using Batch Type HMP of minimum capacity 100-120 TPH. Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work),page-213(table- 3.3-1) & 253(item 5.05)./ 8th Addenda & Corrigenda , SOR:2018,7th Addenda & Corrigenda SOR 2018
Tack Coat: Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.) Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.02)
Bituminous Concrete [Using Bitumen VG-40 (30/40)] Providing and laying bituminous concrete with Hot Mix Plant using crushed aggregates, filler materials (Cement /hydrated lime /Rock dust) and premixed with bituminous binder of specified grading @5.2% (min) for Gr.-1 & @5.4% (min) for Gr.-2, as per table 500-17 and mix design done as per table 500-10 and job mix formula as per cl. 505.3.3, including screening, cleaning of chips and preparing a uniform and quality mix, transporting the hot mix to work site, laying the mixed materials at specified laying temperature as specified in Table 500-2 with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surtace coated with tack coat, rolling with smooth wheeled and vibratory or tandem rollers or with a pneumatic tyre roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 Mpa, to achieve the desired density as per clause 505.3.5, including cost and carriage of bitumen, crushed aggregates, filler materials and hire charges of machinery and equipment for construction and quality control, complete as per Clause 507 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (B) For Grading 2 (13.2 mm nominal size, 30mm/40 mm thick.) (i) Using Batch Type HMP of minimum capacity 100-120 TPH. Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work),page-214(table-3.3- 1) & 255(item 5.08) ,8th ADDENDA & CORRIGENDA
(b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. PWD (Bldg.)-2017, It. No. 1, Page No. 200
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : (iv) Two coats (with any shade except white) PWD (Bldg.)-2017, It. No. 2, Page No. 200
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : (ii) Two coats (white in shade) PWD (Bldg.)-2017, It. No. 2, Page No. 200
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as per Clause 803 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). PWD (WB), Schedule of Rates : 2018 Volume III: Road & Bridge Works, page no-271, item no-8.09
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
23400860TENDERFORMKMCROADSSOUTH202320244171stCall.pdf
Tender Documents • 0.42 MB
BOQ_2369574.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid